Council planning record

Proposed works are for the repair of the south west half- timbered C17 gable elevation and will include- oak timber repairs with an aim to conserve as much of the historic timber fabric as possible. Clean modern paint from brick infill panels, point with lime and apply white limewash. Replace existing pentice boards with full width pentice boards to help shed water away from the historic fabric.

Ivy House Hanley Swan Worcester WR8 0DR

WithdrawnReference: 17/01889/LBMalvern Hills District Council

Last published check: 1 Nov 2026, 22:59. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Consultation Start Date

    Published milestoneCouncil source
  4. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Advert Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Date

    Published milestoneCouncil source

Application summary

Status
Withdrawn
Application type
Listed Building Consent
Received
4 Dec 2017
Validated
15 Jan 2018
Determination deadline
Not published
Local authority
Malvern Hills District Council

Application overview

Proposed works are for the repair of the south west half- timbered C17 gable elevation and will include- oak timber repairs with an aim to conserve as much of the historic timber fabric as possible. Clean modern paint from brick infill panels, point with lime and apply white limewash. Replace existing pentice boards with full width pentice boards to help shed water away from the historic fabric.

Proposal details

Reference
17/01889/LB
Ward
Upton and Hanley Ward - Pre 01/05/23
Parish
Hanley Castle CP
Agent
Benjamin Construction LTD

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Ivy House Hanley Swan Worcester WR8 0DR

This record has no verified map location.

Documents 11 of 11

DocumentPublishedAction
Applicationformnopersonaldata01. Application Form4 Dec 2017View
Listed Building Consent Repair Schedule02. Supporting Information4 Dec 2017View
Heritage Statement02. Supporting Information17 Jan 2018View
site location plan04. Site / Location Plan15 Jan 2018View
Gable Drawings Amendments06. Proposed Plans4 Dec 2017View
Gable Drawing06. Proposed Plans4 Dec 2017View
Gable drawings Repairs06. Proposed Plans15 Jan 2018View
pentice board06. Proposed Plans15 Jan 2018View
Mrs R Abunassar - Hanley Castle Parish Council09. Response - Statutory Consultee24 Jan 2018View
Confirmation of withdrawal11. Decision Information25 Apr 2018View
Site Inspection NotesSite Inspection Notes25 Apr 2018View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Withdrawn
Confirmation of withdrawal
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.