Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
36-46 Albert Embankment London SE1 7TL
Last published check: 16 Oct 2026, 01:38. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceNon-Material Amendment Following a Grant of Planning Permission ref: 24/04003/FUL (Redevelopment of the site comprising demolition of all structures associated with the petrol filling station, and development of two linked towers, in addition to basement levels, consisting of student accommodation with associated amenity space (Use Class Sui Generis) together with cafe and flexible incubator (Use Class E) / cultural space (Use Class Sui Generis), with provision of associated cycle parking, access and other associated works; and the retention, refurbishment and vertical extension to Vintage House (Use Class E) and other associated works, on a phased basis) granted on 21.11.2025.Amendment sought : Revisions to the approved student accommodation room mix, including the conversion of 35 studio rooms to twin occupancy rooms within the South Tower, alongside a series of minor design development changes to the approved building facades, landscaping and servicing arrangements. Plus revised wording of conditions 19, 23, 27 and 63 to reflect the approved phasing strategy, approved fire documentation and the agreed approach to future district heat network connections.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details36-46 Albert Embankment London SE1 7TL
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| Delegated RegisterDelegated Register · PDF | 15 Oct 2026 | View |
| Decision NoticeDecision Notice · PDF | 15 Oct 2026 | View |
| PROPOSED L20 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| TOWERS TYPICAL FLANK FACADEPlans · PDF | 7 Sept 2026 | View |
| NON MATERIAL AMENDMENT - PART 3Supporting Docs · PDF | 7 Sept 2026 | View |
| SOUTH TOWER TYPICAL WEST FACADEPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L07 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L08-19 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L23 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L25 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED GROUND FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L06 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| NON MATERIAL AMENDMENT - PART 2Supporting Docs · PDF | 7 Sept 2026 | View |
| PROPOSED SOUTH ELEVATIONPlans · PDF | 7 Sept 2026 | View |
| PROPOSED EAST ELEVATIONPlans · PDF | 7 Sept 2026 | View |
| PROPOSED SECTION DD & EEPlans · PDF | 7 Sept 2026 | View |
| PROPOSED SOUTH ELEVATIONPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L07 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L08-19 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L20 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L22 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L21 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L22 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| TOWERS TYPICAL FLANK FACADEPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L01 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L26-28 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED SECTIN DD & EEPlans · PDF | 7 Sept 2026 | View |
| APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF | 7 Sept 2026 | View |
| SOUTH TOWER TYPICAL WEST FACADEPlans · PDF | 7 Sept 2026 | View |
| PROPOSED EAST ELEVATIONPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L06 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| NORTH TOWER TYPICAL WEST FACADEPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L25 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L02-03 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED WEST ELEVATIONPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L02-03 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L26-28 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| NORTH TOWER TYPICAL EAST FACADEPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L04-05 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED WEST ELEVATIONPlans · PDF | 7 Sept 2026 | View |
| NORTH TOWER TYPICAL WEST FACADEPlans · PDF | 7 Sept 2026 | View |
| PROPOSED NORTH ELEVATIONPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L24 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| NON MATERIAL AMENDMENT - PART 1Supporting Docs · PDF | 7 Sept 2026 | View |
| CENTRAL LINK TYPICAL FACADEPlans · PDF | 7 Sept 2026 | View |
| PROPOSED GROUND FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED NORTH ELEVATIONPlans · PDF | 7 Sept 2026 | View |
| CENTRAL LINK TYPICAL FACADEPlans · PDF | 7 Sept 2026 | View |
| NORTH TOWER TYPICAL EAST FACADEPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L04-05 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L01 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L21 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L23 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| PROPOSED L24 FLOOR PLANPlans · PDF | 7 Sept 2026 | View |
| COVERING LETTERSupporting Docs · PDF | 7 Sept 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.