Council planning record

Hybrid planning application for a four-phased redevelopment to deliver a data centre campus comprising of: Phase 1 - Full planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) site access and internal roads including a vehicular and pedestrian link between Uxbridge Road and Bullsbrook Road; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development; Phase 2 - Outline planning permission for (a) an Innovation Hub; (b) hard and soft, green and blue, infrastructure; and (c) other ancillary and auxiliary forms of development (all matters reserved); Phase 3 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved); and Phase 4 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved).

Hayes Bridge Retail Park and Heathrow Interchange UXBRIDGE ROAD HAYES UB4 0RH

ApprovalReference: 78343/APP/2025/719London Borough of Hillingdon

Last published check: 14 Oct 2026, 11:16. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Consultation Started

    Published milestoneCouncil source
  4. Comments Due

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decided

    Published milestoneCouncil source
  6. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Approval
Application type
Not published
Received
17 Mar 2025
Validated
28 Mar 2025
Determination deadline
20 May 2026
Local authority
London Borough of Hillingdon

Application overview

Hybrid planning application for a four-phased redevelopment to deliver a data centre campus comprising of: Phase 1 - Full planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) site access and internal roads including a vehicular and pedestrian link between Uxbridge Road and Bullsbrook Road; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development; Phase 2 - Outline planning permission for (a) an Innovation Hub; (b) hard and soft, green and blue, infrastructure; and (c) other ancillary and auxiliary forms of development (all matters reserved); Phase 3 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved); and Phase 4 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved).

Proposal details

Reference
78343/APP/2025/719
Ward
WOOD END 2022
Agent
Nick Heard 2 Kinsway Cardiff CF10 3FD

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Hayes Bridge Retail Park and Heathrow Interchange UXBRIDGE ROAD HAYES UB4 0RH

This record has no verified map location.

Documents 219 of 219

DocumentPublishedAction
Application Form Hybrid Application for Full Planning Permission and Outline Planning Permission (Redacted) AMENDEDAPPLICATION FORM AMENDED28 Mar 2025View
LONUX-NWA-SW-ZZ-DR-A-10200 Rev. P01 Site Location PlanLOCATION PLAN24 Mar 2025View
LONUX-NWA-PL-ZZ-DR-A-12201 Rev. P01 Site Plan - Roof Level SUPERSEDEDBLOCK PLAN24 Mar 2025View
LONUX-NWA-SW-ZZ-DR-A-10201 Rev. P01 Site Plan - ExistingSITE LAYOUT - EXISTING24 Mar 2025View
LON6-NWA-PL-ZZ-DR-A-12220 Rev. P01 LON6 Site Plan SUPERSEDEDSITE LAYOUT - PROPOSED24 Mar 2025View
LONUX-ARUP-SW-LP-DR-C-10205 Rev. P01.02 Uxbridge Road S278 Works Proposed General Arrangement (Resurfacing Option) SUPERSEDEDSITE LAYOUT - PROPOSED26 Aug 2025View
LON6-MWL-DC-ZZ-DR-LD-10200 P01.03 LON6 Landscape Masterplan SUPERSEDEDSITE LAYOUT - LANDSCAPING24 Mar 2025View
LON6-MWL-DC-ZZ-DR-LD-10202 P01.03 LON6 Metro Bank Landscape VignetteSITE LAYOUT - LANDSCAPING24 Mar 2025View
LON6-MWL-DC-ZZ-DR-LD-10203 P01.02 LON6 Yeading Brook Landscape Vignette SUPERSEDEDSITE LAYOUT - LANDSCAPING24 Mar 2025View
LON6-MWL-DC-ZZ-DR-LD-10204 P01.02 LON6 Landscape Vignette - Staff Amenity GardensSITE LAYOUT - LANDSCAPING24 Mar 2025View
12157 TCP 01 (1/4), (2/4), (3/4) and (4/4) Tree Constraints Plan (4 plans together)SITE LAYOUT - LANDSCAPING24 Mar 2025View
LONUX-CDL-ZZ-XX-RP-Z-00005 Rev. P01 Noise Impact Assessment (Dated 14th March 2025)NOISE ASSESSMENT24 Mar 2025View
LONUX-CDL-PL-XX-TI-YA-00001 Rev. P01 Technical Note - Outline noise planning condition comment (Dated 6th June 2025)NOISE ASSESSMENT10 Jun 2025View
LON6-MWL-DC-ZZ-DR-LD-10201 Rev. P01.03 LON6 Urban Greening Factor SUPERSEDEDPROPOSED PLAN24 Mar 2025View
LON6-NWA-PL-ZZ-DR-A-12222 Rev. P01 LON6 Basement & Ground Floor PlansPROPOSED FLOOR PLANS24 Mar 2025View
LON6-NWA-PL-ZZ-DR-A-12223 Rev. P01 LON6 First & Second Floor PlansPROPOSED FLOOR PLANS24 Mar 2025View
LON6-NWA-PL-ZZ-DR-A-12224 Rev. P01 LON6 Third & Fourth Floor PlansPROPOSED FLOOR PLANS24 Mar 2025View
LON6-NWA-PL-ZZ-DR-A-12225 Rev. P01 LON6 Fifth & Sixth Floor Plans SUPERSEDEDPROPOSED FLOOR PLANS24 Mar 2025View
LONUX-CDL-ZZ-XX-RP-E-00001 Rev. P01 External Lighting PlanPROPOSED PLAN24 Mar 2025View
LON6-NWA-PL-ZZ-DR-A-12421 Rev. P01 LON6 Elevations - South & West SUPERSEDEDPROPOSED ELEVATIONS24 Mar 2025View
LON6-NWA-PL-ZZ-DR-A-12422 Rev. P01 LON6 Elevations - North & East SUPERSEDEDPROPOSED ELEVATIONS24 Mar 2025View
LON6-NWA-PL-ZZ-DR-A-12423 Rev. P01 LON6 Detailed Elevation - East SUPERSEDEDPROPOSED ELEVATIONS24 Mar 2025View
LON6-NWA-PL-ZZ-DR-A-12424 Rev. P01 LON6 Detailed Elevation - North SUPERSEDEDPROPOSED ELEVATIONS24 Mar 2025View
LON6-NWA-PL-ZZ-DR-A-12425 Rev. P01 LON6 Detailed Elevation - West SUPERSEDEDPROPOSED ELEVATIONS24 Mar 2025View
LON6-NWA-PL-ZZ-DR-A-12430 Rev. P01 LON6 Sections SUPERSEDEDPROPOSED SECTIONS24 Mar 2025View
LONUX-MWL-SW-ZZ-DR-LD-10200 P01.03 Illustrative Site Wide Landscape Principles Plan SUPERSEDEDPLAN24 Mar 2025View
LONUX-MWL-SW-ZZ-DR-LD-10201 Rev. P01.03 Site Wide Urban Greening Factor Potential Plan SUPERSEDEDPLAN24 Mar 2025View
LONUX-NWA-PL-00-DR-A-12230 Rev. P01 LON6 Transformers SUPERSEDEDPLAN24 Mar 2025View
LONUX-NWA-PL-00-DR-A-12231 Rev. P01 Gate House SUPERSEDEDPLAN24 Mar 2025View
LONUX-NWA-PL-ZZ-DR-A-12400 Rev. P01 Site Context Elevations SUPERSEDEDPLAN24 Mar 2025View
LONUX-NWA-PL-ZZ-DR-A-12801 Rev. P01 Parameter Site Plan - Plots/Blocks SUPERSEDEDPLAN24 Mar 2025View
LONUX-NWA-PL-ZZ-DR-A-12802 Rev. P01 Parameter Site Plan - Heights (Site Plan) SUPERSEDEDPLAN24 Mar 2025View
LONUX-NWA-PL-ZZ-DR-A-12803 Rev. P01 Parameter Site Section - Heights (Longitudinal Section) SUPERSEDEDPLAN24 Mar 2025View
LONUX-NWA-PL-ZZ-DR-A-12806 Rev. P01 Parameter Site Plan - Basement SUPERSEDEDPLAN24 Mar 2025View
LONUX-NWA-PL-ZZ-DR-A-12807 Rev. P01 Parameter Site Plan - Land Use SUPERSEDEDPLAN24 Mar 2025View
LONUX-NWA-PL-ZZ-DR-A-12809 Rev. P01 Parameter Site Plan - Landscape SUPERSEDEDPLAN24 Mar 2025View
LONUX-NWA-PL-ZZ-DR-A-12810 Rev. P01 Parameter Site Plan - Roof Plan SUPERSEDEDPLAN24 Mar 2025View
LONUX-NWA-PL-ZZ-DR-A-12840 Rev. P01 Site Plan - Fencing Plan SUPERSEDEDPLAN24 Mar 2025View
LONUX-NWA-PL-ZZ-DR-A-21000 Rev. P01 Site Plan - Building Coordinates (in response to Ministry of Defence (MoD))PLAN8 Jul 2025View
LON6-MWL-DC-ZZ-DR-LD-10200 P02 LON6 Landscape Masterplan AMENDEDPLAN AMENDED12 Aug 2025View
LON6-MWL-DC-ZZ-DR-LD-10201 Rev. P02 LON6 Urban Greening Factor AMENDEDPLAN AMENDED12 Aug 2025View
LON6-MWL-DC-ZZ-DR-LD-10203 P02 LON6 Yeading Brook Landscape Vignette AMENDEDPLAN AMENDED12 Aug 2025View
LON6-NWA-PL-ZZ-DR-A-12220 Rev. P02 LON6 - Site Plan AMENDEDPLAN AMENDED12 Aug 2025View
LON6-NWA-PL-ZZ-DR-A-12225 Rev. P02 LON6 - Fifth & Sixth Floor Plans AMENDEDPLAN AMENDED12 Aug 2025View
LON6-NWA-PL-ZZ-DR-A-12421 Rev. P02 LON6 - Elevations - South & West AMENDEDPLAN AMENDED12 Aug 2025View
LON6-NWA-PL-ZZ-DR-A-12422 Rev. P02 LON6 - Elevations - North & East AMENDEDPLAN AMENDED12 Aug 2025View
LON6-NWA-PL-ZZ-DR-A-12423 Rev. P02 LON6 - Detailed Elevation East AMENDEDPLAN AMENDED12 Aug 2025View
LON6-NWA-PL-ZZ-DR-A-12424 Rev. P02 LON6 - Detailed Elevation North AMENDEDPLAN AMENDED12 Aug 2025View
LON6-NWA-PL-ZZ-DR-A-12425 Rev. P02 LON6 - Detailed Elevation West AMENDEDPLAN AMENDED12 Aug 2025View
LON6-NWA-PL-ZZ-DR-A-12430 Rev. P02 LON6 - Sections AMENDEDPLAN AMENDED12 Aug 2025View
LONUX-MWL-SW-ZZ-DR-LD-10200 P02 Illustrative Site Wide Landscape Principles Plan AMENDEDPLAN AMENDED12 Aug 2025View
LONUX-MWL-SW-ZZ-DR-LD-10201 Rev. P02 Site Wide Urban Greening Factor Potential Plan AMENDEDPLAN AMENDED12 Aug 2025View
LONUX-NWA-PL-00-DR-A-12230 Rev. P02 LON6 Transformers AMENDEDPLAN AMENDED12 Aug 2025View
LONUX-NWA-PL-00-DR-A-12231 Rev. P02 Gate House AMENDEDPLAN AMENDED12 Aug 2025View
LONUX-NWA-PL-ZZ-DR-A-12201 Rev. P02 Site Plan - Roof Level AMENDEDPLAN AMENDED12 Aug 2025View
LONUX-NWA-PL-ZZ-DR-A-12400 Rev. P02 Site Context Elevations AMENDEDPLAN AMENDED12 Aug 2025View
LONUX-NWA-PL-ZZ-DR-A-12801 Rev. P02 Parameter Site Plan - Plots/Blocks AMENDEDPLAN AMENDED12 Aug 2025View
LONUX-NWA-PL-ZZ-DR-A-12802 Rev. P02 Parameter Site Plan - Heights (Site Plan) AMENDEDPLAN AMENDED12 Aug 2025View
LONUX-NWA-PL-ZZ-DR-A-12803 Rev. P02 Parameter Site Section - Heights (Longitudinal Section) AMENDEDPLAN AMENDED12 Aug 2025View
LONUX-NWA-PL-ZZ-DR-A-12806 Rev. P02 Parameter Site Plan - Basement AMENDEDPLAN AMENDED12 Aug 2025View
LONUX-NWA-PL-ZZ-DR-A-12807 Rev. P02 Parameter Site Plan - Land use AMENDEDPLAN AMENDED12 Aug 2025View
LONUX-NWA-PL-ZZ-DR-A-12809 Rev. P02 Parameter Site Plan - Landscape AMENDEDPLAN AMENDED12 Aug 2025View
LONUX-NWA-PL-ZZ-DR-A-12810 Rev. P02 Parameter Site Plan - Roof Plan AMENDEDPLAN AMENDED12 Aug 2025View
LONUX-NWA-PL-ZZ-DR-A-12840 Rev. P02 Site Plan - Fencing Plan AMENDEDPLAN AMENDED12 Aug 2025View
LONUX-ARUP-SW-LP-DR-C-10201 Rev. P02 Proposed North Entrance General Arrangement Layout (For S106 Agreement, relating to S278 Highways Agreement) SUPERSEDEDPLAN AMENDED18 Sept 2025View
LONUX-ARUP-SW-LP-DR-C-10208 Rev. P01.01 LON6 S106 Agreement - S278 ExtentsPLAN AMENDED4 Dec 2025View
LONUX-NWA-SW-XX-RP-A-00002 Rev. P01 Design Code (Dated 21st March 2024) SUPERSEDEDDESIGN AND ACCESS STATEMENT25 Mar 2025View
Design and Access Statement Rev. P01 Part 1 of 4 (Dated 18th March 2025) SUPERSEDEDDESIGN AND ACCESS STATEMENT25 Mar 2025View
Design and Access Statement Rev. P01 Part 2 of 4 (Dated 18th March 2025) SUPERSEDEDDESIGN AND ACCESS STATEMENT25 Mar 2025View
Design and Access Statement Rev. P01 Part 3 of 4 (Dated 18th March 2025) SUPERSEDEDDESIGN AND ACCESS STATEMENT25 Mar 2025View
Design and Access Statement Rev. P01 Part 4 of 4 (Dated 18th March 2025) SUPERSEDEDDESIGN AND ACCESS STATEMENT25 Mar 2025View
LONUX-NWA-SW-XX-RP-A-00002 Rev. P02 Design Code (Dated 8th August 2025) AMENDEDDESIGN AND ACCESS STATEMENT12 Aug 2025View
Design and Access Statement Rev. P02 Part 1 of 4 (Dated 8th August 2025) AMENDEDDESIGN AND ACCESS STATEMENT12 Aug 2025View
Design and Access Statement Rev. P02 Part 2 of 4 (Dated 8th August 2025) AMENDEDDESIGN AND ACCESS STATEMENT12 Aug 2025View
Design and Access Statement Rev. P02 Part 3 of 4 (Dated 8th August 2025) AMENDEDDESIGN AND ACCESS STATEMENT12 Aug 2025View
Design and Access Statement Rev. P02 Part 4 of 4 (Dated 8th August 2025) AMENDEDDESIGN AND ACCESS STATEMENT12 Aug 2025View
Environmental Statement (Dated March 2025) Appendix 1.1 Assessor Information (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 1.2 Glossary of Abbreviations and Terms (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 1.3 LBH Screening Opinion (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 3.1 Framework Travel Plan (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 3.10 Outline Construction Management Plan (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 3.2 Delivery, Servicing and Waste Management Plan (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 3.3 Site Wide Landscape Design Statement (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 3.4 Outline Landscape Maintenance and Management Plan (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 3.5 Drainage Strategy - Appendix A-E (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 3.5 Drainage Strategy - Appendix F-I (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 3.5 Drainage Strategy (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 3.6 Energy and Sustianability Statement (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 3.7 Circular Economy Statement (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 3.8 Utility Statement (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 3.9 External Lighting design (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 6.1 Air Quality Appendix (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 7.1 Contextualisation of GHG Emissions with Local and National Carbon Budgets (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 7.2 - Gas and Electricity Consumption (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 7.3 - Summary of Estimated Energy Use and Associated Operational GHG Emissions (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Appendix 7.4 - Annual Estimated Operational GHG Emissions Accounting for Grid Decarbonisation (Volume 2)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Chapter 00 Cover and Contents (Volume 1a)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Chapter 01 Introduction (Volume 1a)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Chapter 02 Site and Local Context (Volume 1a)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Chapter 03 Proposed Development (Volume 1a)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Chapter 04 Consultation, Alternatives and Design Evolution (Volume 1a)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Chapter 05 Approach to Assessment (Volume 1a)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Chapter 06 Air Quality (Volume 1a)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Chapter 07 GHG and Climate Change (Volume 1a)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Chapter 08 Summary of mitigation, residual and interaction effects (Volume 1a)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Figure 2.1 Site Location Plan (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Figure 3.2 - Parameter Site Plan - Plots Blocks (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Figure 3.3 Parameter Site Plan - Heights (Site Plan) (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Figure 3.4 - Parameter Site Section - Heights (Longitudinal Section) (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Figure 3.5 - Parameter Site Plan - Land use (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Figure 3.6 - Parameter Site Plan - Landscape (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Figure 3.7 - Parameter Site Plan - Roof plan (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Figure 3.8 - Parameter Site Plan - Basement (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
EIA Non-Technical Summary (Dated March 2025)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 Landscape Masterplan (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 Urban Greening Factor Plan (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 Metro Bank Landscape Vignette (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 Yeading Brook Landscape Vignette (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 Staff Garden Landscape Vignette (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 - Site Plan (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 - Basement & Ground Floor Plans (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 - First & Second Floor Plans (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 - Third & Fourth Floor Plans (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 - Fifth & Sixth Floor Plans (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 - Elevations - South & West (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 - Elevations - North & East (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 - Detailed Elevation East (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 - Detailed Elevation North (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 - Detailed Elevation West (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 - Sections (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Drainage Strategy Plan (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Lighting Layout (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Landscape Masterplan (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Urban Greening Factor (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Landscape Sections (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Proposed Ground Floor Plan (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Proposed Roof Plan (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Proposed Site Plan (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Proposed Aerial View (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Proposed Fence Plan (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Existing and Proposed West Elevations (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Existing and Proposed East Elevation (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Existing and Proposed South Elevations (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Existing and Proposed North Elevations (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Proposed Control Room Elevations (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Substation 2 Proposed Transformer Elevations (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Illustrative Site Wide Landscape Plan (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) LON6 Transformers (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Gate House (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Site Plan - Roof Level (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Site Context Elevations (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
Environmental Statement (Dated March 2025) Site Plan - Fencing Plan (Volume 1b)ENVIRONMENTAL ASSESSMENT STATEMENT25 Mar 2025View
LONUX-ARUP-PL-XX-RP-Z-00001 Rev. P01 Outline Construction Management Plan (Dated 14th March 2025)SUPPORTING INFORMATION24 Mar 2025View
LONUX-ARUP-PL-XX-RP-Z-00003 Rev. P01 Delivery, Servicing and Waste Management Plan (Dated 14th March 2025)SUPPORTING INFORMATION24 Mar 2025View
Biodiversity Net Gain Assessment (Dated March 2025)SUPPORTING INFORMATION24 Mar 2025View
Biodiversity Calculation Metric SpreadsheetSUPPORTING INFORMATION24 Mar 2025View
LONUX-CDL-ZZ-XX-RP-Y-00001 Rev. P01 LON6 Fire Statement (Dated 14th March 2025)SUPPORTING INFORMATION24 Mar 2025View
LONUX-CDL-ZZ-XX-RP-Y-00002 Rev. P01 LON6 Utility Statement (Dated 14th March 2025)SUPPORTING INFORMATION24 Mar 2025View
LONUX-CDL-ZZ-XX-RP-Z-00004 Rev. P01 LON6 Microclimate & Wind Assessment (Dated 14th March 2025)SUPPORTING INFORMATION24 Mar 2025View
Statement of Community InvolvementSUPPORTING INFORMATION24 Mar 2025View
CL-6159-RPT-002 V1.0 Technical Safeguarding Assessment (Dated 11th March 2025)SUPPORTING INFORMATION24 Mar 2025View
CL-6159-RPT-003 V1.0 OLS Safeguarding Assessment (Dated 11th March 2025)SUPPORTING INFORMATION24 Mar 2025View
6599 Daylight and Sunlight Report (Dated 18th February 2025)SUPPORTING INFORMATION24 Mar 2025View
Heritage, Townscape, and Visual Impact Assessment (Dated March 2025) (Part 1)SUPPORTING INFORMATION24 Mar 2025View
Heritage, Townscape, and Visual Impact Assessment (Dated March 2025) (Part 2)SUPPORTING INFORMATION24 Mar 2025View
Heritage, Townscape, and Visual Impact Assessment (Dated March 2025) (Part 3)SUPPORTING INFORMATION24 Mar 2025View
Heritage, Townscape, and Visual Impact Assessment (Part 4) (Dated March 2025)SUPPORTING INFORMATION24 Mar 2025View
Archaeological Desk-Based Assessment (Dated February 2025)SUPPORTING INFORMATION24 Mar 2025View
LONUX-MWL-SW-ZZ-RP-LD-12000 P01.03 Outline Landscape Maintenance and Management Plan (Dated 21st March 2025) SUPERSEDEDSUPPORTING INFORMATION24 Mar 2025View
Infrastructure Statement (Dated February 2025)SUPPORTING INFORMATION24 Mar 2025View
Economic Impact Assessment (Dated March 2025)SUPPORTING INFORMATION24 Mar 2025View
Hayes Digital Park Innovation Hub Outline Strategy (Dated March 2025)SUPPORTING INFORMATION24 Mar 2025View
Health Impact Assessment Rev. 3 (Dated March 2025)SUPPORTING INFORMATION25 Mar 2025View
Planning Statement (Dated March 2025)SUPPORTING INFORMATION25 Mar 2025View
Applicant Response to Flood and Water Management (Metis) CommentsSUPPORTING INFORMATION14 May 2025View
Response to Design Officer Comments Rev. P01 (Dated 29th April 2025)SUPPORTING INFORMATION10 Jun 2025View
Supplementary HTVIA Technical Note (Dated July 2025)SUPPORTING INFORMATION21 Jul 2025View
NWA-0522-XX-XX-REP-A-XXX Rev. P01 Planning Design Meeting (Dated 23rd July 2025)SUPPORTING INFORMATION21 Jul 2025View
LONUX-MWL-PL-XX-RP-LD-12003 P02 Site Wide Landscape Design Statement (Dated 6th August 2025)SUPPORTING INFORMATION12 Aug 2025View
LONUX-MWL-SW-ZZ-RP-LD-12000 P02 Outline Landscape Maintenance and Management Plan (Dated 6th August 2025) AMENDEDSUPPORTING INFORMATION12 Aug 2025View
Site Phasing Plan Pages 6 and 7 of document LONUX-NWA-SW-XX-RP-A-00002 Rev. P02 Design Code (Dated 8th August 2025)SUPPORTING INFORMATION2 Sept 2025View
Applicant Response to GLA on PowerSUPPORTING INFORMATION4 Sept 2025View
West London Gazette 09.04.2025ADVERTISEMENT NOTICE10 Apr 2025View
LIH1-CDL-B-XX-RP-Z-00001 Rev. P01 Innovation Hub - BREEAM New Construction V6 - Pre-Assessment (Dated 14th March 2025)SUSTAINABILITY REPORT24 Mar 2025View
LONUX-ARUP-PL-XX-RP-Z-00004 Rev. P01 Framework Travel Plan (Dated 14th March 2025)TRANSPORT ASSESSMENT24 Mar 2025View
LONUX-ARUP-PL-XX-RP-Z-00005 Rev. P01 Transport Assessment (Dated 14th March 2025) SUPERSEDEDTRANSPORT ASSESSMENT24 Mar 2025View
LONUX-ARUP-PL-XX-RP-Z-00006 Rev. P01 Geotechnical Desk Study Report (Dated 14th March 2025)LAND ASSESSMENT24 Mar 2025View
LONUX-ARUP-PL-XX-RP-Z-00007 Rev. P01 Ground Contamination Preliminary Risk Assessment (Dated 14th March 2025)LAND ASSESSMENT24 Mar 2025View
LONUX-ARUP-PL-XX-RP-Z-00007 Rev. P01 Appendix A: Groundsure report - Ground Contamination Preliminary Risk Assessment (Dated 14th March 2025)LAND ASSESSMENT24 Mar 2025View
LONUX-ARUP-PL-XX-RP-Z-00008 Rev. P01 Flood Risk Assessment (Dated 14th March 2025)FLOOD AND DRAINAGE ASSESSMENT24 Mar 2025View
LONUX-ARUP-SW-LP-RP-C-52001 Rev. P01 Drainage Strategy (Dated 14th March 2025)FLOOD AND DRAINAGE ASSESSMENT24 Mar 2025View
LONUX-ARUP-SW-LP-RP-C-52001 Rev. P01 Appendix A - London Borough of Hillingdon SuDS Pro Forma - Drainage Strategy (Dated 14th March 2025)FLOOD AND DRAINAGE ASSESSMENT24 Mar 2025View
LONUX-ARUP-SW-LP-RP-C-52001 Rev. P01 Appendix F-I Calculations - Drainage Strategy (Dated 14th March 2025)FLOOD AND DRAINAGE ASSESSMENT24 Mar 2025View
12157_AIA.002 Rev A Arboriculture Impact Assessment (Dated March 2025)TREE/LANDSCAPING REPORT24 Mar 2025View
Ecological Appraisal (Dated February 2025)ECOLOGY REPORT24 Mar 2025View
12157 TS 01 BS 5837:2012 Tree ScheduleTREE/LANDSCAPING REPORT24 Mar 2025View
LONUX-CDL-DC-XX-RP-Z-00001 Rev. P01 LON6 - BREEAM 2010 - Data Centre v1.1 (Dated 14th March 2025)SUSTAINABILITY REPORT24 Mar 2025View
LONUX-CDL-ZZ-XX-RP-Z-00008 Rev. P01 LON6 Water Cycle Strategy (Dated 14th March 2025)SUSTAINABILITY REPORT24 Mar 2025View
LONUX-MWL-PL-XX-RP-LD-12003 P01.03 Site Wide Landscape Design Statement (Dated 21st March 2025) SUPERSEDEDTREE/LANDSCAPING REPORT24 Mar 2025View
GLA Circular Economy Statement SpreadsheetSUSTAINABILITY REPORT25 Mar 2025View
Circular Economy Statement Rev. 2 (Dated March 2025)SUSTAINABILITY REPORT25 Mar 2025View
Whole Life Carbon Assessment Rev. 3 (Dated March 2025)SUSTAINABILITY REPORT25 Mar 2025View
LONUX-CDL-ZZ-XX-RP-Z-00002 Rev. P01 Energy and Sustainability Statement (Dated 21st March 2025)ENERGY REPORT25 Mar 2025View
Part l 2021 GLA Detailed LON6 Carbon Emission Reporting Updated SpreadsheetENERGY REPORT25 Mar 2025View
Part l 2021 GLA Outlined Overall Carbon Emission Reporting Updated SpreadsheetENERGY REPORT25 Mar 2025View
Rev2 Innovation Hub LPG Whole Lide Carbon Assessment (WLCA) Template (Dated 25th March 2025)SUSTAINABILITY REPORT25 Mar 2025View
Rev2 LON06 LPG Whole Life Carbon Assessment (WLCA) Template (Dated 25th March 2025)SUSTAINABILITY REPORT25 Mar 2025View
Rev2 LON07 LPG Whole Life Carbon Assessment (WLCA) Template (Dated 25th March 2025)SUSTAINABILITY REPORT25 Mar 2025View
Rev2 LON08 LPG Whole Life Carbon Assessment (WLCA) Template (Dated 25th March 2025)SUSTAINABILITY REPORT25 Mar 2025View
20250508_LONUX-ARUP-SS-SS- Stormwater Catchment Plan - Requested by MetisADDITIONAL DOCUMENTS30 May 2025View
LONUX-ARUP-PL-XX-RP-Z-00005 Rev. P02 Transport Assessment (Dated 5th August 2025) AMENDEDTRANSPORT ASSESSMENT12 Aug 2025View
LONUX-CDL-SW-XX-TI-Y-00001 Rev. P02 Design Note - Air Quality Damage Costs (Dated 8th August 2025)AIR QUALITY REPORT12 Aug 2025View
DECISION NOTICEDECISION NOTICE20 May 2026View
Committee Report AddendumOFFICER REPORT3 Oct 2025View
COMMITTEE REPORTOFFICER REPORT3 Oct 2025View
COMMITTEE REPORT ADDENDUMOFFICER REPORT29 Oct 2025View
COMMITTEE REPORTOFFICERS REPORTS29 Oct 2025View
OFFICERS REPORTSOFFICERS REPORTS20 May 2026View
Section 106 (S106) Legal Agreement - Completed 15th May 2026SECTION 106 AGREEMENT18 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approval
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.