Council planning record

Details in part compliance with condition 5, parts iii) (external colours), iv) (works to windows), v) (works to doors), xiii) (walkways) and xvii) (internal partitions), 8 (Revised Car Parking Layout) and 9 (Car Parking Allocation/Management Plan) of planning permission dated 06/10/14, Ref. 11623/APP/2013/3606: Erection of extensions at roof level, erection of external bridge links on the rear elevation and internal works associated with the change of use of part of Enterprise House to create 96 residential units (class C3) and associated car parking, retention of approximately 4,500 sq.m. of employment use (class B1 and B8) at ground and first floor levels and cafe and corresponding Parts of Condition 3 of Listed Building Consent Application 11623/APP/2013/3592 - (iii), (iv), (v), (xviii), (xxii).

ENTERPRISE HOUSE, 133 BLYTH ROAD HAYES

ApprovalReference: 11623/APP/2015/4536London Borough of Hillingdon

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decided

    Published milestoneCouncil source
  4. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Approval
Application type
Not published
Received
10 Dec 2015
Validated
14 Dec 2015
Determination deadline
26 Jul 2017
Local authority
London Borough of Hillingdon

Application overview

Details in part compliance with condition 5, parts iii) (external colours), iv) (works to windows), v) (works to doors), xiii) (walkways) and xvii) (internal partitions), 8 (Revised Car Parking Layout) and 9 (Car Parking Allocation/Management Plan) of planning permission dated 06/10/14, Ref. 11623/APP/2013/3606: Erection of extensions at roof level, erection of external bridge links on the rear elevation and internal works associated with the change of use of part of Enterprise House to create 96 residential units (class C3) and associated car parking, retention of approximately 4,500 sq.m. of employment use (class B1 and B8) at ground and first floor levels and cafe and corresponding Parts of Condition 3 of Listed Building Consent Application 11623/APP/2013/3592 - (iii), (iv), (v), (xviii), (xxii).

Proposal details

Reference
11623/APP/2015/4536
Ward
BOTWELL
Agent
Mr Andrew Forman College House Inglesham Swindon Wiltshire SN6 7QU

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

ENTERPRISE HOUSE, 133 BLYTH ROAD HAYES

This record has no verified map location.

Documents 121 of 121

DocumentPublishedAction
Application Form - Without Personal DataAPPLICATION FORM11 Dec 2015View
Enterprise House Site Plan The location planLOCATION PLAN11 Dec 2015View
1504 C(9)01 Rev. A Parking Designation Plan received 20/1/17SITE LAYOUT - ACCESS/PARKING15 Mar 2017View
1504 C(9)01 Rev. B Parking Designation Plan received 17.3.17SITE LAYOUT - ACCESS/PARKING AMENDED22 Mar 2017View
1504 C(9)01 Rev. C Parking Designation Layout received 10/4/17SITE LAYOUT - ACCESS/PARKING AMENDED4 May 2017View
1504 LA(--)311 (P3) Proposed North Elevation (window types) received 2/3/16PROPOSED ELEVATIONS9 Dec 2016View
1504 LA(--)312 (P2) Proposed North Elevation (window types)PROPOSED ELEVATIONS9 Dec 2016View
1504 LA(--)313 (P3) Proposed Internal Elevations (window types)PROPOSED ELEVATIONS9 Dec 2016View
1504 L-(--)602 Northlight Penthouse Elevations received 28/2/17PROPOSED ELEVATIONS15 Mar 2017View
1504 LA(--)310 P4 Rev. A Proposed South Elevation (window types) received 28/2/17PROPOSED ELEVATIONS15 Mar 2017View
1504 L(--)304 Rev. A Proposed Internal Elevations M, N and P received 16.6.17PROPOSED ELEVATIONS21 Jul 2017View
1504 L(--)304 Proposed Internal Elevations M, N, P received 23.5.17PROPOSED ELEVATIONS21 Jul 2017View
1504 L(--)303 Rev. D Proposed Internal Elevations received 16.6.17PROPOSED ELEVATIONS21 Jul 2017View
1504 L-(--)631 Rev. A Flat Roof Penthouse Elevations (East and West and Part North and Part South Elevations) received 13/3/17PROPOSED ELEVATIONS AMENDED15 Mar 2017View
1504 L-(--)630 Rev. B Flat Roof Penthouse Elevations (South and North Elevations) received 13/3/17PROPOSED ELEVATIONS AMENDED15 Mar 2017View
HAG 'C' Series Door - Generic Details Sections received 28/2/17PROPOSED SECTIONS15 Mar 2017View
5.v Internal Door Residential - Howdens Additional plansPLAN11 Dec 2015View
C(5.iii)01 External Paint Additional plansPLAN11 Dec 2015View
C(5.iv)01 South Elevation proposed Additional plansPLAN11 Dec 2015View
C(5.iv)02 North Elevation proposed Additional plansPLAN11 Dec 2015View
C(5.iv)03 East and West Elevations proposed Additional plansPLAN11 Dec 2015View
C(5.iv)04 Internal Elevations proposed Additional plansPLAN11 Dec 2015View
C(5.v)01 Doors Additional plansPLAN11 Dec 2015View
C(5.v)02 Roller Shutters Additional plansPLAN11 Dec 2015View
C(5.xiii)01 External Walkways Additional plansPLAN11 Dec 2015View
C(5.xiii)02 21168 SK_W01 (1) Walkway structure Additional plansPLAN11 Dec 2015View
C(8)01 Parking Scheme Layout1 (1). Additional plansPLAN11 Dec 2015View
C(9)01 Parking Designation Layout1 (1 Additional plansPLAN11 Dec 2015View
CE.91429-01 Elevations and Details Additional plansPLAN11 Dec 2015View
L(0-) 300 Existing south elevation Layout1 Additional plansPLAN11 Dec 2015View
L(0-) 301Existing north elevation Layout1 Additional plansPLAN11 Dec 2015View
L(0-) 302Existing elevations east and west L Additional plansPLAN11 Dec 2015View
L(0-) 303 Existing internal elevations Lay Additional plansPLAN11 Dec 2015View
1504 C(5.iii)01 Rev. A External Paint Colours received 10.6.16PLAN9 Dec 2016View
1504 A(31)100 Proposed Steel Framed Windows received 2/3/16PLAN9 Dec 2016View
CE.91429-01 Proposed Elevations and Details of Replacement W20 Section Steel Windows received 7/3/16PLAN9 Dec 2016View
CE.91429-01 Proposed Elevations and Details of Replacement W20 Section Steel Windows received 7/3/16PLAN9 Dec 2016View
CE.91429-03 Proposed Elevations and Details of Replacement W20 Section Steel Windows received 7/3/16PLAN9 Dec 2016View
CE.91429-04 Proposed Elevations and Details of Replacement W20 Section Steel Windows received 7/3/16PLAN9 Dec 2016View
CE.91429-05 Proposed Elevations and Details of Replacement W20 Section Steel Windows received 7/3/16PLAN9 Dec 2016View
CE.91429-06 Proposed Elevations and Details of Replacement W20 Section Steel Windows received 7/3/16PLAN9 Dec 2016View
CE.91429-07 Proposed Elevations and Details of Replacement W20 Section Steel Windows received 7/3/16PLAN9 Dec 2016View
CE.91429-08 Proposed Elevations and Details of Replacement W20 Section Steel Windows received 7/3/16PLAN9 Dec 2016View
Doorset Examples\G15-G20-RX15-AC15.DRW Rev. A Shee G15-G20-RX15-AC15 doorsetPLAN12 Dec 2016View
G15-G20-RX15-AC15-G15.DRW Rev. A Sheet 3 of 3 G15/G20/RX20/AC15 doorsetPLAN12 Dec 2016View
Doorset Examples\G15-G20-RX15-AC15.DRW A 1 of 3 G15/G20/RX15/AC15 doorset received 2/3/16PLAN13 Dec 2016View
Doorset Examples\SG20.dwg SG20 - Norm DAD received 2/3/16PLAN13 Dec 2016View
Doorset Examples\SG20,drg Rev. A Sheet 1 of 4 SG20 - Presto 50-1 received 2/3/16PLAN13 Dec 2016View
Doorset Examples\SG20.dwg Rev. A Sheet 2 of 4 SG20 - Presto 50-2 received 2/3/16PLAN13 Dec 2016View
1504 C(5.v)01 Rev. A Doors - Residential received 2/3/16PLAN13 Dec 2016View
1504 C(5.v) 03 Rev. A Doors - Steel Frame (South Elev) received 10.6.16PLAN13 Dec 2016View
1504 C(5.v)03 Rev. B Doors - Steel Frame (South Elev) received 22/8/16PLAN13 Dec 2016View
1504 C(5.v)02 Rev. A Roller Shutters received 2/3/16PLAN13 Dec 2016View
1504 C(5.v)03 Rev. C Doors - Steel Frame (South Elev) received 5/10/16PLAN13 Dec 2016View
1504 C(5.v)03 Doors - Steel Frame received 10.6.16PLAN13 Dec 2016View
1504 C(5.v)03 Doors - Steel Frame received 2/3/16PLAN13 Dec 2016View
1504 C(5.v)04 Doors - Aluminium received 10.6.16PLAN13 Dec 2016View
1504 C(5.v)04 Doors - Aluminium received 2/3/16PLAN13 Dec 2016View
1504 C(5.v)04 Rev. B Steel Sliding Folding Door - Jansen System received 22.8.16PLAN13 Dec 2016View
1504 C(5.v)05 Doors - Steel Frame (North Elev) received 10.6.16PLAN13 Dec 2016View
1504 C(5.v)05 Doors - Steel Frame (North Elev) received 22.8.16PLAN13 Dec 2016View
1504 C(5.v)05 Doors - Steel Frame (North Elev) received 5.10.16PLAN13 Dec 2016View
1504 C(5.v)06 Rev. A Doors - Steel Frame East and West Elev received 5.10.16PLAN13 Dec 2016View
1504 C(5.v)06 Doors - Steel Frame East and West Elev received 10.6.16PLAN13 Dec 2016View
1504 C(5.v)06 Doors - Steel Frame East and West Elev. received 22/8/16PLAN13 Dec 2016View
HAG 'C' Series Door received 10.6.16PLAN13 Dec 2016View
1504 C(5.xvii)02 Rev. A Internal Partition and Glazed Screens received 2/3/16PLAN13 Dec 2016View
Example of SG20 Double Doorset with Round Vision Panel received 5/10/16PLAN13 Dec 2016View
SG20PM260907 Rev. A Sheet 1 of 1 Example of SG20 Double Doorset with Rebated Frame received 5/10/16PLAN13 Dec 2016View
WS15 Dual Swing Double Door with Round Vision Panel received 5/10/16PLAN13 Dec 2016View
21168_SK01 W01 A Structural Details of New External Walkway received 2/3/16PLAN13 Dec 2016View
1504 C(5.xvii)01 Rev. A Internal Partition and Glazed Screens received 22/8/16PLAN13 Dec 2016View
1504 L(--)303 Rev. A Proposed East and Internal Elevations received 10/6/16PLAN13 Dec 2016View
1504 L(--)303 Rev. B Proposed Internal Elevations received 22/8/16PLAN13 Dec 2016View
1504 L(24)01 Typical Access Walkway received 2/3/16PLAN13 Dec 2016View
1504 L(24)01 Rev. A Typical Access Walkway and Construction received 10/6/16PLAN13 Dec 2016View
1504 L-(24)02 Sixth Floor Bridge Access Walkway received 10.6.16PLAN13 Dec 2016View
L(--)303 Rev. C Proposed Internal Elevations received 5/10/16PLAN6 Jan 2017View
1504 C(5.v)03 Rev. D Doors - Steel Frame (South Elevation) received 28/2/17PLAN15 Mar 2017View
1504 C(5.iii)01 Rev. B External Paint Colours Plan received 28/2/17PLAN15 Mar 2017View
1504 C(5.v)02 Rev. A Roller Shutters Plan received 28/2/17PLAN15 Mar 2017View
1504 A(31) 100 Steel Framed Windows Plan received 28/2/17PLAN15 Mar 2017View
1504 C(5.v)04 Rev. C Steel Sliding Folding Doors - Jansen System received 28/2/17PLAN15 Mar 2017View
C(5.v)03-12 SG20PM260907 Door Technik SG20 Double Doorset with rebated Frame received 17/3/17PLAN4 May 2017View
C(5.v)03-10 Door Technik SG20 Double Doorset with Round Vision Panel received 17/3/17PLAN4 May 2017View
C(5.v)07 - 1 HAG 'C' Series Door received 17/3/17PLAN4 May 2017View
1504 A(24)01 Opague Glass Screens - 6th Floor received 17/3/17PLAN4 May 2017View
CE.91429-09 Proposed Elevations and Details of Replacement W20 Section Steel Windows received 29.6.17PLAN21 Jul 2017View
CE.91429-10 Proposed Elevations and Details of Replacement W20 Section Steel Windows received 29.6.17PLAN21 Jul 2017View
CE.91429-11 Proposed Elevations and Details of Replacement W20 Section Steel Windows received 29.6.17PLAN21 Jul 2017View
CE.91429-12 Proposed Elevations and Details of Replacement W20 Section Steel Windows received 29.6.17PLAN21 Jul 2017View
CE.91429-07 Rev. A Proposed Elevations and Details of Replacement W20 Section Steel Windows received 29.6.17PLAN21 Jul 2017View
1504 A(31)100 Rev. B Proposed Steel Framed Windows received 16.6.17PLAN21 Jul 2017View
1504 A(31)100 Rev. A Proposed Steel Frame Windows received 23/5/17PLAN21 Jul 2017View
A summary of the attachments in the proposalSUPPORTING INFORMATION11 Dec 2015View
C(5.xiii)03 Walkway Installation Procedure User Defined AttachmentSUPPORTING INFORMATION11 Dec 2015View
C(5.xvii)01 Internal Partition and Glazed Screens Additional plansSUPPORTING INFORMATION11 Dec 2015View
C(5.xvii)02 Internal Partition and Glazed Screens Additional plansSUPPORTING INFORMATION11 Dec 2015View
Manufacturer's Specification Sheet - Internal Flush Doors received 2/3/16SUPPORTING INFORMATION13 Dec 2016View
Manufacturer's Specification Sheet - Cube FD60 Fire Door received 2/3/16SUPPORTING INFORMATION13 Dec 2016View
Manufacturer's Specification Sheet - Plywood Door received 10.6.16SUPPORTING INFORMATION13 Dec 2016View
Manufacturer's Specification Brochure - G15 Steel Doorset received 10.6.16SUPPORTING INFORMATION13 Dec 2016View
Manufacturer's Specification Brochure - G20 Steel Doorset received 10.6.16SUPPORTING INFORMATION13 Dec 2016View
Manufacturer's Specification Brochure - C Door Technical Specification received 10.6.16SUPPORTING INFORMATION13 Dec 2016View
Doors - List of Drawings dated 2/3/16 received 2/3/16SUPPORTING INFORMATION13 Dec 2016View
Doors - List of Drawings Rev. B dated 22/8/16 received 22/8/16SUPPORTING INFORMATION13 Dec 2016View
Doors - Door Schedule for Ground Floor dated 3/10/15 received 5/10/16SUPPORTING INFORMATION13 Dec 2016View
Doors - Manufacturer's Details dated 10/5/16 received 10/5/16SUPPORTING INFORMATION13 Dec 2016View
C Door Manufacturer's Technical Specifications SheetSUPPORTING INFORMATION15 Mar 2017View
Cube FD60 Fire Door Manufacturer's Specification Sheet received 28/2/17SUPPORTING INFORMATION15 Mar 2017View
Schedule of Drawings, Rev. B received 10/4/17SUPPORTING INFORMATION4 May 2017View
Door Schedule for Ground Floor received 5/10/16SUPPORTING INFORMATION4 May 2017View
C(5.v)03-8 Door Technik SG15 received 17/3/17SUPPORTING INFORMATION4 May 2017View
C(5.v)03-9 Door Technik SG20 received 17/3/17SUPPORTING INFORMATION4 May 2017View
C(5.v)01-1 Rev. A Howdens Internal Flush Plywood Door FD30 received 17/3/17SUPPORTING INFORMATION4 May 2017View
C(5.v)07-2 C Door Technical Specifications received 17/3/17SUPPORTING INFORMATION4 May 2017View
Revised Schedule of Drawings received 7.7.17SUPPORTING INFORMATION21 Jul 2017View
C(5.v) 01-2 Manufacturer's Leaflet - Cube FD60 Fire Door received 25.7.19SUPPORTING INFORMATION25 Jul 2017View
DECISION NOTICEDECISION NOTICE26 Jul 2017View
DECISION NOTICEDECISION NOTICE26 Jul 2017View
OFFICER REPORTOFFICER REPORT26 Jul 2017View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approval
DECISION NOTICE DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.