Council planning record

Demolition of existing single storey office and proposed 2 storey office replacement P1901.18 Conditions(s) Condition No. 5 No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. a) parking of vehicles of site personnel and visitors; b) storage of plant and materials; c) dust management controls; d) measures for minimising the impact of noise and, if appropriate, vibration arising from construction activities; e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority; f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities; g) sitting and design of temporary buildings; h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies; i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded. And the development shall be carried out in accordance with the approved scheme and statement. Condition No. 6 No works shall take place in relation to any of the development hereby approved until an assessment is undertaken of the impact of road noise emanating from Marsh Way upon the development in accordance with the methodology contained in the Department of Transport/Welsh office memorandum, "Calculation of Road Traffic Noise", 1988. Following this, a scheme detailing measures, which are to protect occupants from road traffic noise shall be submitted to, and approved in writing by the Local Planning Authority and shall be implemented prior to occupation. Condition No. 7 Before the development hereby permitted is first commenced, a detailed energy assessment shall be submitted to and approved in writing by the Local Planning Authority and thereafter implemented accordingly.

Estates Office Fairview Industrial Estate Marsh Way Rainham RM13 8UH

ALL DECISIONS ISSUEDReference: Q0196.19London Borough of Havering

Last published check: 3 Oct 2026, 06:43. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decided

    Published milestoneCouncil source
  4. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
ALL DECISIONS ISSUED
Application type
Not published
Received
23 Jul 2019
Validated
23 Jul 2019
Determination deadline
17 Sept 2019
Local authority
London Borough of Havering

Application overview

Demolition of existing single storey office and proposed 2 storey office replacement P1901.18 Conditions(s) Condition No. 5 No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. a) parking of vehicles of site personnel and visitors; b) storage of plant and materials; c) dust management controls; d) measures for minimising the impact of noise and, if appropriate, vibration arising from construction activities; e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority; f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities; g) sitting and design of temporary buildings; h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies; i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded. And the development shall be carried out in accordance with the approved scheme and statement. Condition No. 6 No works shall take place in relation to any of the development hereby approved until an assessment is undertaken of the impact of road noise emanating from Marsh Way upon the development in accordance with the methodology contained in the Department of Transport/Welsh office memorandum, "Calculation of Road Traffic Noise", 1988. Following this, a scheme detailing measures, which are to protect occupants from road traffic noise shall be submitted to, and approved in writing by the Local Planning Authority and shall be implemented prior to occupation. Condition No. 7 Before the development hereby permitted is first commenced, a detailed energy assessment shall be submitted to and approved in writing by the Local Planning Authority and thereafter implemented accordingly.

Proposal details

Reference
Q0196.19
Ward
South Hornchurch
Agent
Mr Steven Higgon 6 Proctor Way Marks Tey Colchester CO6 1XE

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Estates Office Fairview Industrial Estate Marsh Way Rainham RM13 8UH

This record has no verified map location.

Documents 10 of 10

DocumentPublishedAction
Decision Letter - doc_decpomDecision Letter - doc_decpom16 Sept 2019View
Decision Notice - DOC_COMP2Decision Notice - DOC_COMP216 Sept 2019View
Decision Letter - doc_decpomDecision Letter - doc_decpom16 Sept 2019View
Decision Letter - doc_decpomDecision Letter - doc_decpom12 Sept 2019View
APPLICATION ACKNOWLEDGEMENTAPPLICATION ACKNOWLEDGEMENT9 Aug 2019View
PlansPlans24 Jul 2019View
safety methodEnvironmental Statement24 Jul 2019View
Energy statementEnergy/Sustainability24 Jul 2019View
Environmental noise assessmentEnvironmental Statement24 Jul 2019View
Application FormApplication Form24 Jul 2019View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

ALL DECISIONS ISSUED
Decision Letter - doc_decpom Decision Notice - DOC_COMP2 Decision Letter - doc_decpom Decision Letter - doc_decpom
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.