Council planning record

Approval of details pursuant to condition 3 Design Details and Material (parts B,E,G,H,I) attached to planning permission HGY/2022/2250

Land Rear Of 2-14, Kerswell Close, Tottenham, London

Decision MadeReference: HGY/2024/1054London Borough of Haringey

Last published check: 1 Oct 2026, 17:45. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Decision Date

    Published milestoneCouncil source

Application summary

Status
Decision Made
Application type
Approval of details reserved by a condition
Received
Not published
Validated
Not published
Determination deadline
Not published
Local authority
London Borough of Haringey

Application overview

Approval of details pursuant to condition 3 Design Details and Material (parts B,E,G,H,I) attached to planning permission HGY/2022/2250

Proposal details

Reference
HGY/2024/1054
Alternative references
PP-12971425
Ward
Seven Sisters

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land Rear Of 2-14, Kerswell Close, Tottenham, London

This record has no verified map location.

Documents 46 of 46

DocumentPublishedAction
Arethusa Multi - Technical Data - 1-1-21.pdf · PDF15 Apr 2024View
23-1116-242_Block B Side Elevation_T2.pdf · PDF15 Apr 2024View
23-1116-201-Block-B-Ground-Floor-Rev.P4.pdf · PDF15 Apr 2024View
23-1116-142_Block A Rear Elevation_T2.pdf · PDF15 Apr 2024View
23-1116-203.0-Block-B-Second-Floor---Sheet-1-of-2-Rev.T1.pdf · PDF15 Apr 2024View
DM Decision.pdf · PDF23 Jul 2024View
23-1116-101-Block-A-Ground-Floor-Rev.T1.pdf · PDF15 Apr 2024View
23-1116-205_ Block B Roof Plan Rev.T1.pdf · PDF15 Apr 2024View
DM Final Officer Report.pdf · PDF23 Jul 2024View
23-1116-244_Block B Rear Elevation_T2.pdf · PDF15 Apr 2024View
PC3 G I External Material Pallet.pdf · PDF15 Apr 2024View
23-1116-245_Block B Side Elevation_T2.pdf · PDF15 Apr 2024View
23-1116-100-Block-A-Substructure-Plan-Rev.T1.pdf · PDF15 Apr 2024View
23-1116-143Block A Side Elevation__T2.pdf · PDF15 Apr 2024View
23-1116-102-Block-A-First-Floor-Rev.T1.pdf · PDF15 Apr 2024View
23-1116-240_Block B Front Elevation_T2.pdf · PDF15 Apr 2024View
23-1116-106-Block-A-Roof-Plan-Rev.T1.pdf · PDF15 Apr 2024View
23-1116-141_Block A Side Elevation_T2.pdf · PDF15 Apr 2024View
ApplicationForm.pdf · PDF15 Apr 2024View
ApplicationFormRedacted.pdf · PDF15 Apr 2024View
Material-Specifications-2019.pdf · PDF15 Apr 2024View
23-1116-202-Block-B-First-Floor-Rev.P3.pdf · PDF15 Apr 2024View
23-1116-103-Block-A-Second-Floor-Rev.T1.pdf · PDF15 Apr 2024View
23-1116-200-Block-B-Substructure-Plan-Rev.T1.pdf · PDF15 Apr 2024View
23-1116-010-Site-Plan-Rev.T1.pdf · PDF15 Apr 2024View
Condition 3 Material covering letter.pdf · PDF15 Apr 2024View
23144-A-E-100_ BLOCK A GROUND FLOOR ELECTRICAL SERVICES LAYOUT Rev.C2.pdf · PDF15 Apr 2024View
23-1116-241_Block B Front Elevation_T2.pdf · PDF15 Apr 2024View
AttachmentSummary.pdf · PDF15 Apr 2024View
23-1116-243_Block B Rear Elevation_T2.pdf · PDF15 Apr 2024View
23-1116-104-Block-A-Third-Floor-Rev.T1.pdf · PDF15 Apr 2024View
23-1116-204.0-Block-B-Third-Floor---Sheet-1-of-2-Rev.T1.pdf · PDF15 Apr 2024View
23-1116-640-Typical-Roof-Parapet-Details.-Rev.0.pdf · PDF15 Apr 2024View
23-1116-203.1-Block-B-Second-Floor---Sheet-2-of-2-Rev.T1.pdf · PDF15 Apr 2024View
FeeCalculation.pdf · PDF15 Apr 2024View
23-1116-202.0-Block-B-First-Floor---Sheet-1-of-2-Rev.T1.pdf · PDF15 Apr 2024View
Product Data Sheet Burwell White.pdf · PDF15 Apr 2024View
23-1116-201.1-Block-B-Ground-Floor---Sheet-2-of-2-Rev.T1.pdf · PDF15 Apr 2024View
23-1116-105-Block-A-Fourth-Floor-Rev.T1.pdf · PDF15 Apr 2024View
23144-B-E-100_ BLOCK B GROUND FLOOR ELECTRICAL SERVICES LAYOUT Rev.C1.pdf · PDF15 Apr 2024View
23-1116-199-Block-B-Substructure-Plan-Rev.T1.pdf · PDF15 Apr 2024View
23-1116-202.1-Block-B-First-Floor---Sheet-2-of-2-Rev.T1.pdf · PDF15 Apr 2024View
23-1116-204-Block-B-Third-Floor-Rev.P4.pdf · PDF15 Apr 2024View
23-1116-203-Block-B-Second-Floor-Rev.P3.pdf · PDF15 Apr 2024View
050 Kerswell Close Material List post SV · PDF23 Jul 2024View
23-1116-140_Block A Front Elevation_T2.pdf · PDF15 Apr 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
DM Decision.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.