Council planning record

Demolition of the existing gym/lecture theatre block and the erection of a part four/part five-storey building (2,625 square metres GIA) to host a new Construction and Engineering Centre at the College.

College Of North East London Tottenham Centre, High Road, Tottenham, London, N15 4RU

Under ConsultationReference: HGY/2024/0464London Borough of Haringey

Last published check: 12 Oct 2026, 04:36. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid Date

    Published milestoneCouncil source
  2. End of Consultation Period

    Published milestoneCouncil source
  3. Date of Committee

    Published milestoneCouncil source
  4. Target Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Under Consultation
Application type
Full planning permission
Received
Not published
Validated
14 Mar 2024
Determination deadline
19 Nov 2024
Local authority
London Borough of Haringey

Application overview

Demolition of the existing gym/lecture theatre block and the erection of a part four/part five-storey building (2,625 square metres GIA) to host a new Construction and Engineering Centre at the College.

Proposal details

Reference
HGY/2024/0464
Alternative references
PP-12682012
Ward
Tottenham Central
Agent
Ms Louise Morton

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

College Of North East London Tottenham Centre, High Road, Tottenham, London, N15 4RU

This record has no verified map location.

Documents 118 of 118

DocumentPublishedAction
Noise Impact Assessment prepared by 24 Acoustics R9985-2 Rev 1 · PDF22 Feb 2024View
Location/block/site plans, existing floor and demolition plans · PDF13 Mar 2024View
Geo-environmental and geotechnical assessment 1922791-01(00) May 23 prepared by RSK pt 3 · PDF13 Mar 2024View
Transport Statement by Ardent Consulting Engineers 2301780-R03 Pt 4 · PDF13 Mar 2024View
Proposed site, floor plans, external finishes plan · PDF13 Mar 2024View
Consultation response documents from London Fire Brigade · PDF7 Oct 2024View
5219901-ATK-01-00-D-A-021003 P1 DEN pipe routePlans · PDF7 Aug 2024View
Appendix 6. Quality Review Panel report 17.01.24 · PDF30 Aug 2024View
CCCG Tottenham Energy Assessment Report P 02 Feb 2024 · PDF22 Feb 2024View
Microclimate Analysis prepared by AtkinsRealis P1 Volume 3 of 4 · PDF13 Mar 2024View
Draft Travel Plan by Ardent 2301780-R04 Part 3 · PDF13 Mar 2024View
form_1_cil_additional_information.pdf · PDF22 Feb 2024View
5219901/ATK/01/ZZ/D/A/021000 P1 · PDF22 Feb 2024View
Microclimate Analysis prepared by AtkinsRealis P1 Volume 1 of 4 · PDF13 Mar 2024View
Appendix 2. Images of site and proposed scheme · PDF30 Aug 2024View
ApplicationFormRedacted.pdf · PDF22 Feb 2024View
Daylight and Sunlight Report prepared by Right of Light 6 February 2024 · PDF13 Mar 2024View
Transport Statement by Ardent Consulting Engineers 2301780-R03 Pt 3 · PDF13 Mar 2024View
BREEAM Pre Assessment prepared by SRE Version 1 E · PDF22 Feb 2024View
Transport Statement by Ardent Consulting Engineers 2301780-R03 Pt 1 · PDF13 Mar 2024View
Air Quality Assessment prepared by Redmore Environmental 7689r3 · PDF22 Feb 2024View
Waste Management Plan prepared by KaNect V02 08/02/2024 · PDF13 Mar 2024View
Proposed facade studies sheets 1 - 4 · PDF22 Aug 2024View
Appendix 4. Minutes from planning sub committee 05.02.24 · PDF30 Aug 2024View
Sustainable Design and Construction Statement P02, prepared by Introba · PDF22 Feb 2024View
Planning Statement prepared by Quadrant Town Planning 9th Feb 2024 · PDF22 Feb 2024View
ApplicationFormRedacted.pdf · PDF13 Mar 2024View
Appendix 1 - Planning Conditions CONEL · PDF30 Aug 2024View
Appendix 5. Quality Review Panel report 18.10.23 · PDF30 Aug 2024View
Introba Energy Assessment Report Appendix A · PDF13 Mar 2024View
Design & Access Statement prepared by AtkinsRealis February 2024 no. 5219901 Volume 6 of 8 · PDF13 Mar 2024View
Urban Greening Factor Assessment PRJ0009776 – UGF (rev 02) prepared by Assystem · PDF13 Mar 2024View
Fire Statement and strategy for planning 10440 Rev 1 prepared by Introba · PDF13 Mar 2024View
Microclimate Analysis prepared by AtkinsRealis P1 Volume 4 of 4 · PDF13 Mar 2024View
Geo-environmental and geotechnical assessment 1922791-01(00) May 23 prepared by RSK pt 6 · PDF13 Mar 2024View
Planning Committee Report · PDF30 Aug 2024View
Geo-environmental and geotechnical assessment 1922791-01(00) May 23 prepared by RSK pt 4 · PDF13 Mar 2024View
QRP report 18.10.23Report · PDF14 Aug 2024View
QRP report 17.1.24Report · PDF14 Aug 2024View
Design & Access Statement prepared by AtkinsRealis February 2024 no. 5219901 Volume 4 of 8 · PDF13 Mar 2024View
Tottenham Centre Bird and Bat Box Plan 8.7.24Plans · PDF7 Aug 2024View
CCCG Tottenham Centre Contamination Part 5.pdf · PDF22 Feb 2024View
Layout Plan - Proposed_included_in_Block plan of the site.pdf · PDF13 Mar 2024View
CCCG Tottenham - FINAL Architectural Drawings 02 Proposed Plans.pdf · PDF22 Feb 2024View
Transport Statement by Ardent Consulting Engineers 2301780-R03 Pt 2 · PDF13 Mar 2024View
Draft Travel Plan by Ardent 2301780-R04 Part 2 · PDF13 Mar 2024View
Comments from the War Memorials Trust · PDF4 Apr 2024View
Proposed north, east, south, west elevations · PDF13 Mar 2024View
Tottenham Centre Relocation of Gym Showers Lockers July 2024Other plans · PDF6 Aug 2024View
Geo-environmental and geotechnical assessment 1922791-01(00) May 23 prepared by RSK pt 1 · PDF13 Mar 2024View
Geo-environmental and geotechnical assessment 1922791-01(00) May 23 prepared by RSK pt 2 · PDF13 Mar 2024View
- Draft Travel Plan by Ardent 2301780-R04 Part 4 · PDF13 Mar 2024View
CCCG Tottenham - FINAL Architectural Drawings 05 Proposed Sections and Site Sections.pdf · PDF22 Feb 2024View
form_1_cil_additional_information.pdf · PDF13 Mar 2024View
Design & Access Statement prepared by AtkinsRealis February 2024 no. 5219901 Volume 1 of 8 · PDF22 Feb 2024View
Archaeological Desk Based Assessment 794-PLN-HER-0001-00281 8 Feb 2024 prepared by RPS · PDF13 Mar 2024View
Proposed Sections and Site Sections · PDF13 Mar 2024View
Preliminary Ecological Appraisal by assystem PRJ0009776 – PEA (Rev-002) · PDF13 Mar 2024View
2301780 - R03 Transport Statement - Part 4.pdf · PDF22 Feb 2024View
- Outline Construction Logistics Plan by Ardent 2301780-R05 · PDF13 Mar 2024View
CCCG Tottenham Centre Proposed Site Plan.pdf · PDF22 Feb 2024View
CCCG Tottenham Centre Fire Statement and Strategy.pdf · PDF22 Feb 2024View
CCCG Tottenham Centre Energy Assessment Report Appendices.pdf · PDF22 Feb 2024View
Section 106 agreement (unsealed) · PDF12 Feb 2026View
Design & Access Statement prepared by AtkinsRealis February 2024 no. 5219901 Volume 5 of 8 · PDF13 Mar 2024View
BREEAM Report for Credits ENE01, ENE04, HEA01 and HEA04 · PDF13 Mar 2024View
CCCG Tottenham Centre Contamination Part 1.pdf · PDF22 Feb 2024View
CCCG Tottenham - FINAL Architectural Drawings 03 Proposed Elevations.pdf · PDF22 Feb 2024View
Consultation response documents from London Fire Brigade · PDF7 Oct 2024View
Comments from Historic Enland · PDF2 Apr 2024View
CCCG Tottenham Centre Contamination Part 4.pdf · PDF22 Feb 2024View
Transport Technical Note Response to Highways July 2024 by Ardent 2301780-R07A July 2024 · PDF6 Aug 2024View
CCCG Tottenham Centre Contamination Part 6.pdf · PDF22 Feb 2024View
Microclimate Analysis prepared by AtkinsRealis P1 Volume 2 of 4 · PDF13 Mar 2024View
Design & Access Statement prepared by AtkinsRealis February 2024 no. 5219901 Volume 3 of 8 · PDF13 Mar 2024View
CCCG Tottenham - FINAL Architectural Drawings 01 Existing and Demo.pdf · PDF22 Feb 2024View
2301780-R06 - Delivery Servicing Management Plan.pdf · PDF22 Feb 2024View
CCCG Tottenham Centre Contamination Part 8.pdf · PDF22 Feb 2024View
Layout Plan - Proposed_included_in_Block plan of the site.pdf · PDF22 Feb 2024View
CCCG Tottenham Centre Outline Site Waste Management Plan.pdf · PDF22 Feb 2024View
CCCG Tottenham - FINAL Design and Access Statement Volume 3 of 8.pdf · PDF22 Feb 2024View
CCCG Tottenham Centre Heritage Statement 07 February 2024.pdf · PDF22 Feb 2024View
Geo-environmental and geotechnical assessment 1922791-01(00) May 23 prepared by RSK pt 9 · PDF13 Mar 2024View
CCCG Tottenham Centre BREEAM Credits ENE01 and 04 HEA 01 and 04.pdf · PDF22 Feb 2024View
2301780 - R03 Transport Statement - Part 2.pdf · PDF22 Feb 2024View
Heritage Statement prepared by Steven Bee Urban Counsel 07.02.24 · PDF13 Mar 2024View
CCCG Tottenham - FINAL Microclimate Analysis Volume 3 of 4.pdf · PDF22 Feb 2024View
CCCG Tottenham Centre Preliminary Ecology Appraisal.pdf · PDF22 Feb 2024View
2301780 - R03 Transport Statement - Part 1.pdf · PDF22 Feb 2024View
CCCG Tottenham Centre Contamination Part 7.pdf · PDF22 Feb 2024View
CCCG Tottenham Centre Daylight and Sunlight Report (Neighbouring Properties).pdf · PDF22 Feb 2024View
Design & Access Statement prepared by AtkinsRealis February 2024 no. 5219901 part 2 of 8 · PDF13 Mar 2024View
CCCG Tottenham Centre Contamination Part 3.pdf · PDF22 Feb 2024View
Geo-environmental and geotechnical assessment 1922791-01(00) May 23 prepared by RSK pt 7 · PDF13 Mar 2024View
Comments from the Greater London Archaeological Advisory Service ( · PDF11 Apr 2024View
Tottenham Centre Phase 2 Residential Options 15.8.24Report · PDF16 Aug 2024View
Geo-environmental and geotechnical assessment 1922791-01(00) May 23 prepared by RSK pt 5 · PDF13 Mar 2024View
CCCG Tottenham Centre Drainage Design Report.pdf · PDF22 Feb 2024View
Draft Travel Plan by Ardent 2301780-R04 Part 1 · PDF13 Mar 2024View
CCCG Tottenham - FINAL Microclimate Analysis Volume 4 of 4.pdf · PDF22 Feb 2024View
2301780 - R04 Travel Plan - Part 1.pdf · PDF22 Feb 2024View
2301780 - R04 Travel Plan - Part 2.pdf · PDF22 Feb 2024View
CCCG Tottenham - FINAL Design and Access Statement Volume 6 of 8.pdf · PDF22 Feb 2024View
Biodiversity net gain assessment prepared by Assystem PRJ0009776-BNG · PDF13 Mar 2024View
CCCG Tottenham - FINAL Design and Access Statement Volume 4 of 8.pdf · PDF22 Feb 2024View
Addendum Report CONEL 2024.0464 · PDF9 Sept 2024View
CCCG Tottenham Centre Contamination Part 2.pdf · PDF22 Feb 2024View
CCCG Tottenham Centre Contamination Part 9.pdf · PDF22 Feb 2024View
Drainage Design Report prepared by AtkinsRealis 5219902-ATK-XX-XX-RP-C-00001 · PDF13 Mar 2024View
Design & Access Statement prepared by AtkinsRealis February 2024 no. 5219901 Volume 7 of 8 · PDF13 Mar 2024View
Design & Access Statement prepared by AtkinsRealis February 2024 no. 5219901 Volume 8 of 8 · PDF13 Mar 2024View
Geo-environmental and geotechnical assessment 1922791-01(00) May 23 prepared by RSK pt 8 · PDF13 Mar 2024View
Proposed Ext Finishes Plan with Proposed Location for Movable Planters 021004 P2 · PDF22 Aug 2024View
Appendix 7. CONEL drawing.report list · PDF30 Aug 2024View
Appendix 3 Internal and External Consultee representations CONEL · PDF30 Aug 2024View
CCCG Tottenham Centre Archaeological DBA.pdf · PDF22 Feb 2024View
CCCG Tottenham - FINAL Design and Access Statement Volume 7 of 8.pdf · PDF22 Feb 2024View
Delivery and Servicing Management Plan by Ardent Consulting 2301780-R06 Feb 24 · PDF13 Mar 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.