Council planning record

Erection of rear dormer including the insertion of 3x front, and 2x rear rooflights. Installation of photovoltaic panels on roof. Installation of an external staircase from first floor to private ground floor side/rear garden (plus creation of secondary means of escape), replacement of 2x rear windows including lowering of sill levels.

First Floor Flat, 51 Abbotsford Avenue, Tottenham, London, N15 3BT

Decision MadeReference: HGY/2023/3359London Borough of Haringey

Last published check: 2 Oct 2026, 10:16. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Decision Date

    Published milestoneCouncil source

Application summary

Status
Decision Made
Application type
Householder planning permission
Received
Not published
Validated
Not published
Determination deadline
Not published
Local authority
London Borough of Haringey

Application overview

Erection of rear dormer including the insertion of 3x front, and 2x rear rooflights. Installation of photovoltaic panels on roof. Installation of an external staircase from first floor to private ground floor side/rear garden (plus creation of secondary means of escape), replacement of 2x rear windows including lowering of sill levels.

Proposal details

Reference
HGY/2023/3359
Alternative references
PP-12683059
Ward
St Ann's
Agent
Mr Sergio Cavadas

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

First Floor Flat, 51 Abbotsford Avenue, Tottenham, London, N15 3BT

This record has no verified map location.

Documents 18 of 18

DocumentPublishedAction
51ABT-SC-DR-A-1000-P01 – Location Plan · PDF20 Dec 2023View
51ABT-SC-DR-A-1003 - Existing and Proposed First Floor Plan.pdf · PDF20 Dec 2023View
51 Abbotsford Avenue_Design and access statement.pdf · PDF20 Dec 2023View
51ABT-SC-DR-A-1008-P01 – Existing and Proposed Rear Elevation · PDF20 Dec 2023View
ApplicationFormRedacted.pdf · PDF20 Dec 2023View
51ABT-SC-DR-A-1009-P01 – Existing and Proposed Section · PDF20 Dec 2023View
DM Decision.pdf · PDF28 Feb 2024View
51ABT-SC-DR-A-1006-P01 – Existing and Proposed Front Elevation · PDF20 Dec 2023View
51ABT-SC-DR-A-1005-P01 – Existing and Proposed Roof Plan · PDF20 Dec 2023View
51ABT-SC-DR-A-1002-P01 – Existing and Proposed Ground Floor Plan · PDF20 Dec 2023View
51 Abbotsford Avenue_Design and access statement.pdf · PDF20 Dec 2023View
51ABT-SC-DR-A-1003-P02 – Existing and Proposed First Floor Plan · PDF20 Dec 2023View
Notice under Article 13 of Application for Planning Permission (20.12.23) · PDF20 Dec 2023View
51ABT-SC-DR-A-1007-P01 – Existing and Proposed Side (South) Elevation · PDF20 Dec 2023View
51ABT-SC-DR-A-1004-P01 – Existing and Proposed Loft Plan · PDF20 Dec 2023View
DM Final Officer Report.pdf · PDF28 Feb 2024View
51ABT-SC-DR-A-1001-P01 – Site Plan · PDF20 Dec 2023View
ApplicationFormRedacted.pdf · PDF20 Dec 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve with Conditions
DM Decision.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.