Council planning record

External alterations to the roofs of the West Wing of the Tower and Lab Block including the partial replacement of failed roofing at 15th and 16th floor roof levels; installation of a structural steel frame platform at 15th floor roof level to accommodate one GRP enclosure to house two switch rooms and two steel enclosures to house UPS batteries; provision of cable containment at both 15th floor roof level and 16th floor plant room level, installation of an external riser to accommodate cabling routed along the building facade; replacement of existing glazed doors and windows on the west elevation at 15th floor level with new fire-rated windows and a solid door with a glazed panel, and infill of the remaining openings with brick.

Charing Cross Hospital Fulham Palace Road, London, W6 8RF

Decided: APPLICATION APPROVEDReference: P/2026/01093/FULLondon Borough of Hammersmith & Fulham

Last published check: 21 Oct 2026, 05:22. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Registered

    Published milestoneCouncil source
  4. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided: APPLICATION APPROVED
Application type
Not published
Received
22 Apr 2026
Validated
30 Apr 2026
Determination deadline
25 Jun 2026
Local authority
London Borough of Hammersmith & Fulham

Application overview

External alterations to the roofs of the West Wing of the Tower and Lab Block including the partial replacement of failed roofing at 15th and 16th floor roof levels; installation of a structural steel frame platform at 15th floor roof level to accommodate one GRP enclosure to house two switch rooms and two steel enclosures to house UPS batteries; provision of cable containment at both 15th floor roof level and 16th floor plant room level, installation of an external riser to accommodate cabling routed along the building facade; replacement of existing glazed doors and windows on the west elevation at 15th floor level with new fire-rated windows and a solid door with a glazed panel, and infill of the remaining openings with brick.

Proposal details

Reference
P/2026/01093/FUL
Ward
Fulham Reach
Agent
Ms Fuencisla Yague / Ansell and Bailey LTD

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Charing Cross Hospital Fulham Palace Road, London, W6 8RF

This record has no verified map location.

Documents 58 of 58

DocumentPublishedAction
ApplicationFormRedacted.pdfCouncil documentNot publishedView
CIL Form.pdfCouncil documentNot publishedView
CXH-P8766-ETA-XX-XX-E-DAS-00000_R1 Info for Design and Access Statement.pdfCouncil documentNot publishedView
45062-1 GA-B.pdfCouncil documentNot publishedView
Custom 6.0m Electrovault Depiction Rev3.pdfCouncil documentNot publishedView
15th Floor Elevation alterations. Existing and proposed Elevation.pdfCouncil documentNot publishedView
Metador-Defender-Fireshield-Datasheet.pdfCouncil documentNot publishedView
IG55 - Coventional - Simple User Guide - KIDDE 400 copy 2.pdfCouncil documentNot publishedView
KDS 38-41XXX1-055 REV-AC_tcm1137-190098.pdfCouncil documentNot publishedView
KDS 38-400000-000 REV-AB_tcm1137-236235.pdfCouncil documentNot publishedView
Strategic Flood Risk Assessment.pdfCouncil documentNot publishedView
CXH-P8766-ETA-01-14-E-DR-80001_C4 14th Cable Layout.pdfCouncil documentNot publishedView
CXH-P8766-ETA-01-15-E-DR-80001_C3 Equipment Location Plan.pdfCouncil documentNot publishedView
CXH-P8776-ETA-01-XX-DR-E-70002_C2 SS7 and MSG Cable Route and Containment to 15th Floor.pdfCouncil documentNot publishedView
CXH-P8766-ETA-01-15-E-DR-70001-(C7).pdfCouncil documentNot publishedView
0529113 - Charing Cross Hospital Technical Specifications-1-18.pdfCouncil documentNot publishedView
RBM-MW-01-02 (Roof details-drainage outlet).pdfCouncil documentNot publishedView
RBM-MW-03-02 (Roof details-parapet).pdfCouncil documentNot publishedView
RBM-MW-03-08 (Roof details-threshold).pdfCouncil documentNot publishedView
RBM-MW-03-13 (Roof details-plinth).pdfCouncil documentNot publishedView
24-2540-RC-001-C4.pdfCouncil documentNot publishedView
3921-001-(G)1 - UPS SWITCH ROOM PLATFORM 3D VIEW - Rev C02.pdfCouncil documentNot publishedView
3921-001-(G)2 - UPS SWITCH ROOM PLATFORM PLAN SECTION DETAILS - Rev C02.pdfCouncil documentNot publishedView
242540-20-0100-C05_PROPOSED PLATFORM SUPPORT STRUCTURE ON 15th FLOOR.pdfCouncil documentNot publishedView
242540-21-0100-C02_SECTIONS and DETAILS.pdfCouncil documentNot publishedView
242540-21-0102-C02_BASEPLATE DETAILS.pdfCouncil documentNot publishedView
BBS-24-2540-RC-001-01-C4.pdfCouncil documentNot publishedView
25-2737-ST-001-C_East Wing Cable Riser Typical Upper Lvl.pdfCouncil documentNot publishedView
25-2737-ST-002-C_East Wing Cable Riser Typical Low Lvl.pdfCouncil documentNot publishedView
25-2737-ST-003-B_East Wing Cable Riser Top Lvl.pdfCouncil documentNot publishedView
25043(00)001-Site Location Plan.pdfCouncil documentNot publishedView
25043(00)002-Site Block Plan.pdfCouncil documentNot publishedView
25043(01)006-Level 15 Existing Plan.pdfCouncil documentNot publishedView
25043(01)008-Level 15 Proposed Plan.pdfCouncil documentNot publishedView
25043(01)010-Level 16 Existing Plan.pdfCouncil documentNot publishedView
25043(01)011-Level 16 Proposed Plan.pdfCouncil documentNot publishedView
25043(02)001-Existing West Elevation.pdfCouncil documentNot publishedView
25043(02)002-Existing South Elevation.pdfCouncil documentNot publishedView
25043(02)003-Proposed West Elevation.pdfCouncil documentNot publishedView
25043(02)004-Proposed South Elevation.pdfCouncil documentNot publishedView
25043(03)001-Existing Section A-A.pdfCouncil documentNot publishedView
25043(03)002-Proposed Section A-A.pdfCouncil documentNot publishedView
25043(09)001-Existing Site Photos.pdfCouncil documentNot publishedView
25043-Drawing Issue Sheets 20260420.pdfCouncil documentNot publishedView
ACK_VALID_APPLICATIONCouncil documentNot publishedView
Press ListCouncil documentNot publishedView
Existing North ElevationCouncil documentNot publishedView
Proposed North ElevationCouncil documentNot publishedView
25043(02)003-Proposed West ElevationCouncil documentNot publishedView
25043(02)004-Proposed South ElevationCouncil documentNot publishedView
25043(02)005-Proposed North ElevationCouncil documentNot publishedView
25043(03)002-Proposed Section A-ACouncil documentNot publishedView
25043(02)004A-Proposed South ElevationCouncil documentNot publishedView
25043(02)003A-Proposed West ElevationCouncil documentNot publishedView
25043(03)002A-Proposed Section A-ACouncil documentNot publishedView
25043(02)005A-Proposed North ElevationCouncil documentNot publishedView
DELEGATED_REPORT_OFFICER_ONLYCouncil documentNot publishedView
DECISION_NOTICECouncil documentNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decided: APPLICATION APPROVED
DECISION_NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.