Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
115 - 119 Goldhurst Terrace London NW6 3BR
Council milestones and published deadlines. A deadline passing does not confirm a decision.
FRONT GARDEN: 1 x Oak (Quercus sp.) (T1) - Fell to ground level. 1 x Rowan (Sorbus aucuparia) (T2) - Crown reduction of a minimum 30%, 1.5m to achieve a crown volume reduction in line with BRE Digest IP7/06 guidance.: Maintain at the reduced dimensions by re-pruning back to previous reduction points on a maximum 3-year cycle. 1 x Privet Hedge (Ligustrum sp.) (T3) - Reduce hedge height to approx. 1.8ms and trim all faces to form a neat, uniform boundary line. 1 x Oak Stump (T4) - Grind out the oak stump completely below ground level. All works to be carried out in accordance with BS 3998:2010 - Tree Work Recommendations.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details115 - 119 Goldhurst Terrace London NW6 3BR
Location point supplied by the council.
View location map| Document | Published | Action |
|---|---|---|
| Council application recordPublic record link | Not published | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.