Council planning record

Details to discharge Condition 30 (Water Supply Infrastructure) of planning permission 2022/2359/P dated 20/12/22: Before the relevant phase e) phase 4; f) phase 5; g) phase 6) of the development commences, impact studies of the existing water supply infrastructure have been submitted to, and approved in writing by, the local planning authority (in consultation with Thames Water). The studies should determine the magnitude of any new additional capacity required in the system and a suitable connection point. For phases a) phase 0; b) phase 1; c) phase 2; d) phase 3; details must be implemented in accordance with application ref 2015/4260/P dated 18/09/2015; 2021/2862/P dated 28/11/2022. Reason: To ensure that the water supply infrastructure has sufficient capacity to cope with the additional demand, in order to safeguard the amenities of the area generally, in accordance with the requirements of policies CC3 and A1 of the London Borough of Camden Local Plan 2017.

Block B Agar Grove Estate Agar Grove London NW1 9SS

Final DecisionReference: 2023/4658/PLondon Borough of Camden

Last published check: 25 Oct 2026, 02:02. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. validated

    Published milestoneCouncil source
  2. received

    Published milestoneCouncil source
  3. decision

    Published milestoneCouncil source
  4. source_updated

    Published milestoneCouncil source

Application summary

Status
Final Decision
Application type
Approval of Details
Received
11 Dec 2023
Validated
31 Oct 2023
Determination deadline
Not published
Local authority
London Borough of Camden

Application overview

Details to discharge Condition 30 (Water Supply Infrastructure) of planning permission 2022/2359/P dated 20/12/22: Before the relevant phase e) phase 4; f) phase 5; g) phase 6) of the development commences, impact studies of the existing water supply infrastructure have been submitted to, and approved in writing by, the local planning authority (in consultation with Thames Water). The studies should determine the magnitude of any new additional capacity required in the system and a suitable connection point. For phases a) phase 0; b) phase 1; c) phase 2; d) phase 3; details must be implemented in accordance with application ref 2015/4260/P dated 18/09/2015; 2021/2862/P dated 28/11/2022. Reason: To ensure that the water supply infrastructure has sufficient capacity to cope with the additional demand, in order to safeguard the amenities of the area generally, in accordance with the requirements of policies CC3 and A1 of the London Borough of Camden Local Plan 2017.

Proposal details

Reference
2023/4658/P
Ward
Camden Square

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Block B Agar Grove Estate Agar Grove London NW1 9SS

Location point supplied by the council.

View location map

Documents 1 of 1

DocumentPublishedAction
Council application recordPublic record linkNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Granted
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.