Council planning record

Repairs to and restoration of Crystal Palace Subway; partial deconstruction and rebuilding of existing retaining walls; construction of new parapet walls and roof structure (LISTED BUILDING CONSENT).

Pedestrian Subway Under Crystal Palace Parade, Crystal Palace Parade, Anerley, London

Decision MadeReference: 21/02649/LBCLondon Borough of Bromley

Last published check: 23 Oct 2026, 20:52. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Valid date

    Published milestoneCouncil source
  3. Scheduled Decision Date

    Published milestoneCouncil source
  4. Consultation Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Earliest Decision Date

    Published milestoneCouncil source
  6. Date of committee

    Published milestoneCouncil source
  7. Decision notice sent date

    Published milestoneCouncil source
  8. Decision date

    Published milestoneCouncil source

Application summary

Status
Decision Made
Application type
Listed building consent (Alt/Ext)
Received
20 May 2021
Validated
21 May 2021
Determination deadline
Not published
Local authority
London Borough of Bromley

Application overview

Repairs to and restoration of Crystal Palace Subway; partial deconstruction and rebuilding of existing retaining walls; construction of new parapet walls and roof structure (LISTED BUILDING CONSENT).

Proposal details

Reference
21/02649/LBC
Alternative references
PP-09824041
Ward
Crystal Palace & Anerley
Agent
Clive England

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Pedestrian Subway Under Crystal Palace Parade, Crystal Palace Parade, Anerley, London

This record has no verified map location.

Documents 132 of 132

DocumentPublishedAction
LOWER GROUND FLOOR REFLECTED CEILING - AS PROPOSEDDrawing · PDF20 May 2021View
ELEVATIONS 10, 11, 12 AND 13 NORTH LEVEL STAR AS EXISTINGDrawing · PDF20 May 2021View
DETAIL ELEVATION AS PROPOSEDDrawing · PDF20 May 2021View
ELEVATIONS 50, 51 AND 52 AS EXISTINGDrawing · PDF20 May 2021View
TOWNSCAPE AND VISUAL IMPACT ASSESSMENT PART 3Supporting Document · PDF21 Jun 2021View
ELEVATION 2 AS PROPOSEDDrawing · PDF3 Aug 2021View
THE EAST COURTYARDDrawing · PDF18 Jun 2021View
NOISE ASSESSMENT PART 3Supporting Document · PDF21 Jun 2021View
DETAIL ELEVATION AS PROPOSEDDrawing · PDF20 May 2021View
TOWNSCAPE AND VISUAL IMPACT ASSESSMENT PART 5Supporting Document · PDF21 Jun 2021View
ELEVATION 2 AS PROPOSEDDrawing · PDF20 May 2021View
EAST COURTYARD - ROOF 3D IMAGES AS PROPOSEDDrawing · PDF20 May 2021View
EAST COURTYARD - ROOF 3D IMAGES AS PROPOSEDDrawing · PDF3 Aug 2021View
AIR QUALITY ASSESSMENT MODEL VERIFICATIONSupporting Document · PDF18 Jun 2021View
ELEVATION 3 AS PROPOSEDDrawing · PDF20 May 2021View
EAST COURTYARD - ROOF 3D IMAGES AS PROPOSEDDrawing · PDF3 Aug 2021View
ELEVATIONS 14, 15, 16, 17, 26 AND 27 AS EXISTINGDrawing · PDF20 May 2021View
ELEVATION 2 AS PROPOSEDDrawing · PDF20 May 2021View
UPPER GROUND FLOOR PLAN AS PROPOSED REFERENCE PLANDrawing · PDF20 May 2021View
DETAIL ELEVATION AS PROPOSEDDrawing · PDF20 May 2021View
LIGHTING SPECIFICATIONSupporting Document · PDF20 May 2021View
EAST COURTYARD ROOF PLAN AND CROSS SECTION AS PROPOSEDDrawing · PDF20 May 2021View
UPPER GROUND FLOOR PLAN AS PROPOSED REFERENCE PLANDrawing · PDF3 Aug 2021View
ECOLOGY, HABITAT AND BAT HIBERNATION SURVEY REPORTSupporting Document · PDF20 May 2021View
SITE LOCATION PLANDrawing · PDF3 Dec 2021View
STAIRSDrawing · PDF18 Jun 2021View
ELEVATIONS 14, 15, 16, 17, 26 AND 27 AS PROPOSEDDrawing · PDF20 May 2021View
DETAIL ELEVATION AS PROPOSEDDrawing · PDF20 May 2021View
NOISE ASSESSMENT PART 2Supporting Document · PDF18 Jun 2021View
ELEVATIONS 10, 11, 12 AND 13 NORTH LEVEL STAIR AS PROPOSEDDrawing · PDF20 May 2021View
CULTURAL VENUE INDICATIVE FLOOR PLANS AND CROSS SECTIONDrawing · PDF18 Jun 2021View
ELEVATION 1 AS PROPOSEDDrawing · PDF3 Aug 2021View
TREE CONSTRAINTS PLAN (SHEET 1 OF 14)Drawing · PDF20 May 2021View
NEIGHBOUR COMMENT (SUPPORT) SUBMITTED ONLINESupport Comment · PDF2 Jul 2021View
EAST COURTYARD ROOF PLAN AND CROSS SECTION AS PROPOSEDDrawing · PDF3 Aug 2021View
SITE LOCATION PLAN CONTRACTORS COMPOUND AND ACCESSDrawing · PDF3 Aug 2021View
LOWER GROUND FLOOR REFLECTED CEILING - AS PROPOSEDDrawing · PDF20 May 2021View
PROPOSED DOORS DOORS 3 AND 4Drawing · PDF18 Jun 2021View
ELEVATION 4 AS PROPOSEDDrawing · PDF20 May 2021View
DETAIL ELEVATION AS PROPOSEDDrawing · PDF20 May 2021View
LAND CONTAMINATION ASSESSMENT PART 2Supporting Document · PDF21 Jun 2021View
LOWER GROUND FLOOR REFLECTED CEILING PLAN AS EXISTINGDrawing · PDF20 May 2021View
SITE LOCATION PLAN AS EXISTINGSuperseded · PDF20 May 2021View
EAST COURTYARD ROOF PLAN AND LONG SECTION AS PROPOSEDDrawing · PDF3 Aug 2021View
TREE CONSTRAINTS PLANDrawing · PDF18 Jun 2021View
DETAIL ELEVATION AS PROPOSEDDrawing · PDF20 May 2021View
SITE PLAN AS PROPOSEDDrawing · PDF20 May 2021View
TREE IMPACT PLANDrawing · PDF18 Jun 2021View
LOWER GROUND FLOOR REFLECTED CEILING - AS PROPOSEDDrawing · PDF20 May 2021View
ELEVATION 53 AS EXISTINGDrawing · PDF20 May 2021View
LOWER GROUND FLOOR PLAN - RCP AS PROPOSEDDrawing · PDF20 May 2021View
ELEVATION 4 AS PROPOSEDDrawing · PDF3 Aug 2021View
TREE REPORTSupporting Document · PDF18 Jun 2021View
TOWNSCAPE AND VISUAL IMPACT ASSESSMENT PART 9Supporting Document · PDF18 Jun 2021View
ELEVATION 53 AS PROPOSEDDrawing · PDF3 Aug 2021View
UPDATED CONDITION SURVEYSupporting Document · PDF20 May 2021View
LOWER GROUND FLOOR PAVING AS PROPOSEDDrawing · PDF20 May 2021View
LAND CONTAMINATION ASSESSMENT PART 3Supporting Document · PDF21 Jun 2021View
ELEVATIONS 5, 6 AND 7 AS EXISTINGDrawing · PDF20 May 2021View
LAND CONTAMINATION ASSESSMENT PART 4Supporting Document · PDF21 Jun 2021View
NOISE ASSESSMENT PART 1Supporting Document · PDF18 Jun 2021View
ELEVATIONS 50, 51 AND 52 AS PROPOSEDDrawing · PDF20 May 2021View
VAULTS CUSTOM LUMINAIRE D1Drawing · PDF18 Jun 2021View
PROPOSED DOORS 1 AND 2Drawing · PDF20 May 2021View
ELEVATIONS 5, 6 AND 7 AS PROPOSEDDrawing · PDF3 Aug 2021View
ELECTRICAL SERVICES SITE PLANDrawing · PDF20 May 2021View
UPPER GROUND FLOOR PLAN AS PROPOSED REFERENCE PLANDrawing · PDF20 May 2021View
DETAIL ELEVATION AS PROPOSEDDrawing · PDF20 May 2021View
ELEVATION 1 AS PROPOSEDDrawing · PDF20 May 2021View
ELEVATION 2 AS EXISTINGDrawing · PDF20 May 2021View
DRAINAGE CHANNEL TYPICAL DETAIL AS PROPOSEDDrawing · PDF3 Aug 2021View
PHOTOSDrawing · PDF20 May 2021View
TOWNSCAPE AND VISUAL IMPACT ASSESSMENT PART 11Supporting Document · PDF21 Jun 2021View
TOWNSCAPE AND VISUAL IMPACT ASSESSMENT PART 2Supporting Document · PDF21 Jun 2021View
UPPER GROUND FLOOR PLAN AS PROPOSEDDrawing · PDF20 May 2021View
EAST COURTYARD DWARF WALLS TO STEPS AS PROPOSEDDrawing · PDF20 May 2021View
Decision NoticeDecision Notice · PDF31 Jan 2022View
ELEVATIONS 8 AND 9 AS EXISTINGDrawing · PDF20 May 2021View
LOWER GROUND FLOOR REFLECTED CEILING - AS PROPOSEDDrawing · PDF20 May 2021View
UPPER GROUND FLOOR PLAN AS EXISTINGDrawing · PDF20 May 2021View
EAST COURTYARD - ROOF 3D IMAGES AS PROPOSEDDrawing · PDF20 May 2021View
NEIGHBOUR COMMENT (OBJECTION) SUBMITTED ONLINEObjection Comment · PDF14 Jul 2021View
PROPOSED DOORS DOORS 1 AND 2Drawing · PDF18 Jun 2021View
ELEVATION 53 AS PROPOSEDDrawing · PDF20 May 2021View
THE SUBWAYDrawing · PDF18 Jun 2021View
LOWER GROUND FLOOR REFLECTED CEILING - AS PROPOSEDDrawing · PDF20 May 2021View
ELEVATIONS 8 AND 9 AS PROPOSEDDrawing · PDF20 May 2021View
AIR QUALITY ASSESSMENT METHODOLOGYSupporting Document · PDF18 Jun 2021View
SITE PLAN REBUILDING AND REPAIRS AS PROPOSEDDrawing · PDF3 Aug 2021View
AIR QUALITY ASSESSMENT PART 1Supporting Document · PDF18 Jun 2021View
LOWER GROUND FLOOR PLAN AS PROPOSEDDrawing · PDF20 May 2021View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form No Personal Data · PDF20 May 2021View
TOWNSCAPE AND VISUAL IMPACT ASSESSMENT PART 7Supporting Document · PDF18 Jun 2021View
LOWER GROUND FLOOR REFLECTED CEILING - AS PROPOSEDDrawing · PDF20 May 2021View
DETAIL ELEVATION AS PROPOSEDDrawing · PDF20 May 2021View
LAND CONTAMINATION ASSESSMENT PART 1Supporting Document · PDF18 Jun 2021View
ELEVATION 4 AS EXISTINGDrawing · PDF20 May 2021View
TOWNSCAPE AND VISUAL IMPACT ASSESSMENT PART 8Supporting Document · PDF18 Jun 2021View
TOWNSCAPE AND VISUAL IMPACT ASSESSMENT PART 4Supporting Document · PDF21 Jun 2021View
AIR QUALITY ASSESSMENT PART 2Supporting Document · PDF18 Jun 2021View
LAND CONTAMINATION ASSESSMENT PART 5Supporting Document · PDF21 Jun 2021View
ELEVATION 1 AS PROPOSEDDrawing · PDF20 May 2021View
TOWNSCAPE AND VISUAL IMPACT ASSESSMENT PART 10Supporting Document · PDF18 Jun 2021View
EAST COURTYARD DWARF WALLS TO STEPS AS PROPOSEDDrawing · PDF3 Aug 2021View
ENERGY STRATEGYSupporting Document · PDF18 Jun 2021View
LOWER GROUND FLOOR REFLECTED CEILING PLAN AS EXISTINGDrawing · PDF20 May 2021View
DETAIL ELEVATION AS PROPOSEDDrawing · PDF20 May 2021View
NEIGHBOUR COMMENT (SUPPORT) SUBMITTED ONLINESupport Comment · PDF9 Jul 2021View
ELEVATIONS 50, 51 AND 52 AS EXISTINGDrawing · PDF3 Aug 2021View
DRAINAGE STRATEGYDrawing · PDF20 May 2021View
ELEVATION 4 AS PROPOSEDDrawing · PDF4 Jun 2021View
ELEVATION 1 AS EXISTINGDrawing · PDF20 May 2021View
TOWNSCAPE AND VISUAL IMPACT ASSESSMENT PART 1Supporting Document · PDF21 Jun 2021View
ELEVATION 3 AS EXISTINGDrawing · PDF20 May 2021View
DETAIL ELEVATION AS PROPOSEDDrawing · PDF20 May 2021View
NEIGHBOUR COMMENT (SUPPORT) SUBMITTED ONLINESupport Comment · PDF26 Jun 2021View
GATES AS PROPOSEDDrawing · PDF20 May 2021View
LOWER GROUND FLOOR PLAN NEW STONE GA DRAWING AS PROPOSEDDrawing · PDF20 May 2021View
DETAIL ELEVATION AS PROPOSEDDrawing · PDF20 May 2021View
LOWER GROUND FLOOR PLAN AS EXISTINGDrawing · PDF20 May 2021View
ELEVATIONS 5, 6 AND 7 AS PROPOSEDDrawing · PDF20 May 2021View
DRAINAGE LAYOUT GENERAL ARRANGEMENTDrawing · PDF3 Aug 2021View
NEIGHBOUR COMMENT (SUPPORT) SUBMITTED ONLINESupport Comment · PDF7 Jul 2021View
HANDRAILS TO NORTH AND SOUTH STAIRWELLS AS PROPOSEDDrawing · PDF20 May 2021View
TREE CONSTRAINTS PLAN (SHEET 4 OF 14)Drawing · PDF20 May 2021View
TOWNSCAPE AND VISUAL IMPACT ASSESSMENT PART 6Supporting Document · PDF21 Jun 2021View
ELEVATIONS 5, 6 AND 7 AS PROPOSEDDrawing · PDF20 May 2021View
UPPER GROUND FLOOR PLAN AS PROPOSED REFERENCE PLANDrawing · PDF3 Aug 2021View
EAST COURTYARD ROOF PLAN AND LONG SECTION AS PROPOSEDDrawing · PDF20 May 2021View
Acknowledgement LetterAcknowledgement Letter · PDF23 Jun 2021View
NEIGHBOUR COMMENT (SUPPORT) SUBMITTED ONLINESupport Comment · PDF28 Jun 2021View
SITE PLAN AS EXISTINGDrawing · PDF20 May 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

GRANTED
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.