Council planning record

Function room and new accessible entrance extension with adapted car park spaces and kitchen extension

The Gateway Inn, Crook Road, Kendal, LA8 8LX

DeterminedReference: 7/2026/5428Lake District National Park Authority

Last published check: 3 Oct 2026, 23:42. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Dispatch date

    Published milestoneCouncil source
  8. Decision date

    Published milestoneCouncil source
  9. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Determined
Application type
Full Planning application
Received
30 Jul 2026
Validated
18 Aug 2026
Determination deadline
23 Sept 2026
Local authority
Lake District National Park Authority

Application overview

Function room and new accessible entrance extension with adapted car park spaces and kitchen extension

Proposal details

Reference
7/2026/5428
Ward
Upper Kent Ward
Parish
Burneside
Agent
Fish
UPRN
MAN000000000011889

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

The Gateway Inn, Crook Road, Kendal, LA8 8LX

This record has no verified map location.

Documents 14 of 14

DocumentPublishedAction
Aboricultural impact assessmentEcological survey (other)12 Aug 2026View
Aboricultural method statementEcological survey (other)12 Aug 2026View
Application form (redacted)Application form12 Aug 2026View
Covering letter (redacted)Other correspondence12 Aug 2026View
Design and access statementDesign & access statement12 Aug 2026View
Existing site plan, ground floor plan and elevationsPlan12 Aug 2026View
Preliminary bat roost asssessmentBat survey12 Aug 2026View
Proposed site plan, ground floor plan and elevationsPlan12 Aug 2026View
Site location planSite location plan12 Aug 2026View
Revised heritage statement (redacted) (07.08.2026)Other supporting information13 Aug 2026View
Reply by Highways & LLFAConsultee response7 Sept 2026View
Reply by Parish CouncilConsultee response17 Sept 2026View
Officer's reportDelegated report23 Sept 2026View
Decision noticeDecision notice2 Oct 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approved with Conditions
Decision notice
Planning conditions
  1. The development hereby permitted shall be commenced before the expiration of THREE years from the date hereof. REASON: Imposed in accordance with the provisions of Section 91 of the Town and Country Planning Act, 1990.
  2. The development hereby permitted shall not be carried out otherwise than in conformity with the following submitted plans and details: -Promap Location Plan -Proposed site plan, ground floor plan & elevations 1063.PL.02 -Arboricultural Impact Assessment Report No. 2982_AlA.02 -Arboricultural Method Statement Report No. 2982 AMS.02 REASON: For the avoidance of doubt.
  3. Notwithstanding the approved plans and prior to the commencement of the development hereby permitted, a tree protection method statement in respect of the beech hedge identified as H10 in the approved Arboricultural Impact Assessment shall be submitted to and approved in writing by the Local Planning Authority. Such method statement shall provide details and plans of the measures and working practices to be employed to prevent damage to the hedge during construction and as part of the complete development. The development shall thereafter take place in accordance with the approved details. REASON: To minimise the risk of damage to the idenfitied hedge, protection measures need to be in place before work starts on site and maintained during the construction period in accordance with Policies 04, 05 and 06 of the Lake District National Park Local Plan 2020-2035.
  4. Prior to the commencement of the development hereby permitted, tree protection measures shall be put in place in accordance with the approved details. All tree protection measures shall be retained for the duration of works. REASON: To minimise the risk of damage to nearby trees, protection measures need to be in place before work starts on site and maintained during the construction period in accordance with Policies 04, 05 and 06 of the Lake District National Park Local Plan 2020-2035.
  5. Town and Country Planning (Development Management Procedure) (England) Order 2015 Article 35(2) statement. The Local Planning Authority did not identify problems arising in relation to dealing with the application.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.