The development hereby permitted shall be commenced before the expiration of THREE years from the date hereof. REASON: Imposed in accordance with the provisions of Section 91 of the Town and Country Planning Act, 1990.
The development hereby permitted shall not be carried out otherwise than in conformity with the following submitted plans and details received by the Local Planning Authority: - Drawing no. DWF 01 04 - Location Plan - Application Form - Drawing no. DWF 01 03 A - Proposed Plan and Elevation - Drawing no. DWF 01 02 A - Site Plan with Tree Protection Measures REASON: For the avoidance of doubt.
Prior to the commencement of the development hereby permitted, tree protection measures shall be put in place in accordance with Drawing no. DWF 01 02 A. All tree protection measures shall be retained for the duration of works. REASON: To minimise the risk of damage to nearby trees, protection measures need to be in place before work starts on site and maintained during the construction period in accordance with Policies 04, 05 and 06 of the Lake District National Park Local Plan 2020-2035.
Details of any external lighting shall be submitted to, and agreed in writing by, the Local Planning Authority prior to installation. Such lighting shall be maintained in accordance with the approved details thereafter. REASON: In order to minimise the effects of external lighting upon the special qualities of the Lake District National Park, including the tranquillity and intrinsically dark landscape of the open countryside in accordance with Plan Policies 01 (national and international significance of the Lake District), 05 (protecting the spectacular landscape) and 06 (design and development) of the Lake District National Park Local Plan 2020-2035.
Prior to the first use of the development hereby permitted, the approved solar panels as shown on drawing no. DWF 01 03 A with respect to the provision of renewable/low carbon energy shall be implemented and retained as operational thereafter. REASON: In the interests of increasing the proportion of energy generated through renewable and low carbon sources in accordance with Policy 20 of the Lake District National Park Local Plan 2020-2035.
Town and Country Planning (Development Management Procedure) (England) Order 2015 Article 35(2) statement. The Local Planning Authority did not identify problems arising in relation to dealing with the application.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.