The development hereby permitted shall be commenced before the expiration of THREE years from the date hereof. REASON: Imposed in accordance with the provisions of Section 91 of the Town and Country Planning Act, 1990.
Prior to the commencement of the development hereby permitted, tree protection measures shall be put in place in accordance with the Tree Protection Plan contained at Appendix 8 within the submitted Arboricultural Impact Assessment, Method Statement & Tree Protection Plan dated May 2026. All tree protection measures shall be retained for the duration of works. REASON: To minimise the risk of damage to nearby trees, protection measures need to be in place before work starts on site and maintained during the construction period in accordance with Policies 04, 05 and 06 of the Lake District National Park Local Plan 2020-2035.
The development hereby permitted shall not be undertaken other than strictly in accordance with the mitigation and compensation strategy detailed in Section 7 of the submitted Preliminary Ecological Assessment dtaed 30 January 2026. REASON: To minimise the risk of direct or indirect impacts on the ecological value of the site, in particular the adjacent ASNW, in accordance with Policy 04 of the Lake District National Park Local Plan 2020-2035.
The development hereby permitted shall not be carried out otherwise than in conformity with the following submitted plans and details received by the Local Planning Authority: - Drawings titled Location Plan and Appendix 7 – Proposed Plan - Drawing no. J1657-CD-02 (Construction details sheet) - Arboricultural Impact Assessment, Method Statement & Tree Protection Plan dated May 2026 - Preliminary Ecological Appraisal dated 30 January 2026 - Flood Risk Assessment dated February 2026 - Construction Method Statement dated 5 February 2026 - Manufacture’s (Harlequin) brochure - Non-mains drainage questionnaire supporting statement - Non-main questionnaire REASON: For the avoidance of doubt.
Town and Country Planning (Development Management Procedure) (England) Order 2015 Article 35(2) statement. The Local Planning Authority have worked with the applicant in a positive and proactive manner by seeking solutions to problems arising in relation to dealing with the application by requesting noise data.
Informative The public have the right to pass and repass along the adjacent bridleway at all times, so it must be kept clear during the development works. it should not be obstructed with contractors vehicles or with deposited items such as building materials. Particular care should be taken of the public's health and safety during the works. You should be aware that if you intend to alter the footpath's surface, you need our permission to do so. Any damage caused to the surface of the footpath by the building works must be made good.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.