Council planning record

Alterations, restoration and refurbishment works to facilitate change of use of the public house into a mixed-use premises of restaurant and public house at ground floor, two holiday lets units at first floor, retained public house use at basement level. External alterations to the facades including installation of new windows and doors, replacement windows, installation of external spiral staircase, erection of a single storey extension and first floor balcony above, strengthening works to roof and installation of plant equipment, construction of two raised dining terraces, walls and balustrades, new access ramp. Amendments to the internal layout including removal of existing and installation of new dividing walls. (Amended proposal to replace listed building consent 06/24/0973/LB, introducing: including change in external staircase design, alterations to rear extension, terrace walls and balustrades, installation of plant equipment within service yard, and alterations to landscaping)

The Iron Duke Public House North Drive Great Yarmouth NR30 4HF

UndecidedReference: 06/25/0830/LBGreat Yarmouth Borough Council

Last published check: 26 Oct 2026, 13:57. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Undecided
Application type
Not published
Received
8 Oct 2025
Validated
23 Oct 2025
Determination deadline
23 Mar 2026
Local authority
Great Yarmouth Borough Council

Application overview

Alterations, restoration and refurbishment works to facilitate change of use of the public house into a mixed-use premises of restaurant and public house at ground floor, two holiday lets units at first floor, retained public house use at basement level. External alterations to the facades including installation of new windows and doors, replacement windows, installation of external spiral staircase, erection of a single storey extension and first floor balcony above, strengthening works to roof and installation of plant equipment, construction of two raised dining terraces, walls and balustrades, new access ramp. Amendments to the internal layout including removal of existing and installation of new dividing walls. (Amended proposal to replace listed building consent 06/24/0973/LB, introducing: including change in external staircase design, alterations to rear extension, terrace walls and balustrades, installation of plant equipment within service yard, and alterations to landscaping)

Proposal details

Reference
06/25/0830/LB
Parish
GY Yarmouth North
Agent
Mr N Parker Studio 207, ScreenWorks 22 Highbury Grove, London N5 2ER

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

The Iron Duke Public House North Drive Great Yarmouth NR30 4HF

This record has no verified map location.

Documents 251 of 251

DocumentPublishedAction
AHU Datasheet R7Planning App - Further Information16 Oct 2026View
Drg 22291DDR6 With weights HandedPlanning App - Further Information16 Oct 2026View
1831-RA-701-A (EMAQ+ RA)Planning App - Further Information16 Oct 2026View
14667 Report 2aPlanning App - Further Information16 Oct 2026View
1831-GF-0625-701-F (Ductwork)Planning App - Further Information16 Oct 2026View
TID-BFF-XX-XX-RG-A-0000- PLANNING DRAWING ISSUE SHEET_260930Planning App - Revised Plans7 Oct 2026View
TID-BFF-XX-XX-DN-A-0004 - Flank wall rebuildingPlanning App - Revised Plans7 Oct 2026View
260930 Iron Duke Finishes SchedulePlanning App - Revised Plans7 Oct 2026View
Iron Duke - Planning Documents Relevant Conditions_260930Planning App - Revised Plans7 Oct 2026View
1654-TID-Planning Changes and Documents-260930-RevBPlanning App - Revised Plans7 Oct 2026View
1654-TID-BFF-ZZ-XX-RP-A-5105-HIA_Rev CPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1514-PL2-Typical Flat Bedroom layoutPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1512-PL2-Flat 01 Bedroom layoutPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1513-PL2-Typical Flat Bedroom layoutPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1510-PL2-Flat 02 Kitchen Diner LayoutPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1511-PL2-Flat 01 Bedroom layoutPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1507-PL2-Flat 01 Kitchen Diner LayoutPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1508-PL2-Flat 01 Kitchen Diner LayoutPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1509-PL2-Flat 02 Kitchen Diner LayoutPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1505-PL2-Basement Universal WC PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1506-PL2-Staff Changing Room PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1503-PL2-Universal WC PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1504-PL2-Typical Bathroom LayoutPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1502-PL2-Accessible WC PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1500-PL2-Womens WCs PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1501-PL2-Mens WCs PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-B1-DR-A-0350-PL1-PROPOSED BASEMENT RCPPlanning App - Revised Plans7 Oct 2026View
Iron Duke Luminaire SchedulePlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-0351-PL1-PROPOSED GROUND FLOOR RCPPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-01-DR-A-0352-PL1-PROPOSED FIRST FLOOR RCPPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1650-PL1-SOUTH BAR COLUMN BOXINGPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1641-PL2-BANQUETTE SEATING 2_2Planning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1640-PL2-BANQUETTE SEATING 1_2Planning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1635-PL2-CONDIMENT STANDPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1619-PL1-SOUTH BAR ELEVATIONPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1630-PL2-LIGHTING COLUMNPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1616-PL2-SOUTH BAR FULL SECTION 2_2Planning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1617-PL2-SOUTH BAR SECTIONSPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1618-PL2-SOUTH BAR DETAILSPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1614-PL2-SOUTH BAR ELEVATIONPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1615-PL2-SOUTH BAR FULL SECTION 1_2Planning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1605-PL2-NORTH BACK BAR SECTIONSPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1610-PL2-SOUTH BAR LOWER COUNTER PLANPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1611-PL2-SOUTH BAR UPPER COUNTER PLANPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1601-PL2-NORTH BAR UPPER COUNTER PLANPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1604-PL2-NORTH BAR SECTIONSPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1600-PL2-NORTH BAR LOWER COUNTER PLANPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-RF-DR-A-0125-PL4-Strip-out Roof PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-01-DR-A-0122-PL5-Strip-out First Floor PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-B1-DR-A-0120-PL4-Strip-out Basement PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-0121-PL4-Strip-out Ground Floor PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-0528-PL6-Proposed Section FPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-0526-PL6-Proposed Section DPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-0524-PL6-Proposed Section BPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-0525-PL6-Proposed Section CPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-0522-PL6-Proposed Section APlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-0423-PL5-Proposed South ElevationPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-0422-PL5-Proposed East ElevationPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-0421-PL6-Proposed North ElevationPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-0420-PL6-Proposed West ElevationPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-RF-DR-A-0225-C4-Proposed Roof PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-B1-DR-A-0220-PL5-Proposed Basement PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-01-DR-A-0222-PL6-Proposed First Floor PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-0221-PL5-Proposed Ground Floor PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-0200-PL6-Proposed Site PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-B1-DR-A-0900-PL2-PROPOSED FLOOR FINISHES - BASEMENTPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-B1-DR-A-1000-PL2-PROPOSED CEILING FINISHES - BASEMENTPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-B1-DR-A-0350-PL1-PROPOSED BASEMENT RCPPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-B1-DR-A-0800-PL2-WALL TYPES - BASEMENT PLANPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-01-DR-A-0902-PL2-PROPOSED FLOOR FINISHES - FIRSTPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-01-DR-A-1002-PL2-PROPOSED CEILING FINISHES - FIRSTPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-01-DR-A-0352-PL1-PROPOSED FIRST FLOOR RCPPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-01-DR-A-0802-PL2-WALL TYPES - FIRST FLOOR PLANPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-0901-PL2-PROPOSED FLOOR FINISHES - GROUNDPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-1001-PL2-PROPOSED CEILING FINISHES - GROUNDPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-0351-PL1-PROPOSED GROUND FLOOR RCPPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-0801-PL2-WALL TYPES - GROUND FLOOR PLANPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1230-PL1-Canopy repair detailsPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-2475-PL1-External gatesPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-2495-PL2-External Balustrade Type A DetailsPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-2496-PL2-External Balustrade Type B DetailsPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-2460-PL1-South Terrace Details 01Planning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-2462-PL1-South Terrace Details 02Planning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-2454-PL2-East Terrace Details 05Planning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-2452-PL2-East Terrace Details 03Planning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-2453-PL2-East Terrace Details 04Planning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-2450-PL2-East Terrace Details 01Planning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-2451-PL2-East Terrace Details 02Planning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-2421-PL6-Proposed Landscaping Elevation BPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-2420-PL6-Proposed Landscaping Elevation APlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-2400-PL5-Proposed Landscaping GA PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-2401-PL4-Proposed Hard Landscaping PlanPlanning App - Revised Plans7 Oct 2026View
23185-09A Sections Sheet 3Planning App - Revised Plans7 Oct 2026View
TID-BFF-RS-00-DR-A-2465-PL4-Proposed Refuse Store DetailsPlanning App - Revised Plans7 Oct 2026View
23185-06E - Sections Sheet 2Planning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1128-PL1-STAIR 03 LONG SECTIONPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1130-PL1-STAIR 02 LONG SECTIONPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-01-DR-A-1126-PL1-Rear Courtyard First Floor PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1127-PL1-STAIR 03 ELEVATIONPlanning App - Revised Plans7 Oct 2026View
1831-GF-0625-701-F - Ground Floor Kitchen VentilationPlanning App - Revised Plans7 Oct 2026View
23185-10B - Stair & Landing DetailsPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-00-DR-A-1125-PL1-Rear Courtyard Ground Floor PlanPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1331-T2-METAL EXTERNAL DOOR DETAILSPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-SCH-A-5003-PL2-DOOR SCHEDULEPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1312-T1-PROPOSED TYPICAL EXT METAL DOOR 10Planning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1330-T2-METAL EXTERNAL DOOR DETAILSPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1311-PL1-PROPOSED EXT DOOR TYPICAL DETAILSPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1309-PL1-PROPOSED INT DOOR TYPICAL DETAILSPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1310-PL1-PROPOSED EXT DOUBLE DOOR TYPICAL DETAILSPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1308-PL1-PROPOSED TYPICAL BOH DOORSPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1307-PL2-PROPOSED TYPICAL EXT DOOR 8Planning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1305-PL2-PROPOSED TYPICAL DOORS 6A-FD 6B-FDPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1306-PL1-PROPOSED TYPICAL EXT DOOR 7Planning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1303-PL2-PROPOSED TYPICAL DOORS 3 3-FD 4-FDPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1304-PL1-PROPOSED TYPICAL DOORS 5A 5B 5C-FD 5DPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1301-PL2-PROPOSED DOORS KEY PLANPlanning App - Revised Plans7 Oct 2026View
TID-BFF-ZZ-ZZ-DR-A-1302-PL1-PROPOSED TYPICAL DOORS 1 2A 2BPlanning App - Revised Plans7 Oct 2026View
Development Management Committee Agenda - 11-03-2026DC Committee Report23 Jun 2026View
260512 Stage 4 Finishes SchedulePlanning App - Other Supporting Documents19 May 2026View
Development Management Committee Minutes (11th March 2026)DC Committee Report7 Apr 2026View
ConservationDC Planning App - Consultation Response (statutory)12 Mar 2026View
Committee AddendumPlanning App - Other Supporting Documents11 Mar 2026View
Built HeritageDC Planning App - Consultation Response (statutory)10 Mar 2026View
British Archaeology Comments of supportDC Planning App - Consultation Response (statutory)10 Mar 2026View
Correspondence re heat pump positionPlanning App - Other Supporting Documents9 Mar 2026View
Environmental HealthDC Planning App - Consultation Response (statutory)6 Mar 2026View
Historic Environment ServicesDC Planning App - Consultation Response (statutory)4 Mar 2026View
Historic EnglandDC Planning App - Consultation Response (statutory)4 Mar 2026View
EcologyDC Planning App - Consultation Response (statutory)4 Mar 2026View
Agenda Document Pack - Development Management Committee (11-03-2026)DC Committee Report3 Mar 2026View
1654-TID-Planning Changes and Documents-260227-RevA (27th February 2026)Planning App - Other Supporting Documents2 Mar 2026View
TID-BFF-XX-XX-RG-A-0000H Drawing Issue Sheet (27th February 2026)Planning App - Other Supporting Documents2 Mar 2026View
TID-BFF-ZZ-ZZ-DR-A-1423-PL2-Typical Crittall WindowPlanning App - Revised Plans2 Mar 2026View
TID-BFF-ZZ-ZZ-DR-A-1424-PL2-Typical Crittall Curved WindowPlanning App - Revised Plans2 Mar 2026View
TID-BFF-ZZ-ZZ-DR-A-1425-PL2-Typical Critall Plan detailsPlanning App - Revised Plans2 Mar 2026View
TID-BFF-ZZ-ZZ-DR-A-1426-PL2-Typical Critall Section detailsPlanning App - Revised Plans2 Mar 2026View
TID-BFF-ZZ-ZZ-DR-A-0524-PL5-Proposed Section BPlanning App - Revised Plans2 Mar 2026View
TID-BFF-ZZ-ZZ-DR-A-0525-PL5-Propsoed Section CPlanning App - Revised Plans2 Mar 2026View
TID-BFF-ZZ-ZZ-DR-A-0526-PL5-Proposed Section DPlanning App - Revised Plans2 Mar 2026View
TID-BFF-ZZ-ZZ-DR-A-0528-PL5-Proposed Section FPlanning App - Revised Plans2 Mar 2026View
TID-BFF-ZZ-ZZ-DR-A-0421-PL5-Proposed North ElevationPlanning App - Revised Plans2 Mar 2026View
TID-BFF-ZZ-ZZ-DR-A-0422-PL5-Proposed East ElevationPlanning App - Revised Plans2 Mar 2026View
TID-BFF-ZZ-ZZ-DR-A-0423-PL5-Proposed South ElevationPlanning App - Revised Plans2 Mar 2026View
TID-BFF-ZZ-ZZ-DR-A-0522-PL5-Proposed Section APlanning App - Revised Plans2 Mar 2026View
TID-BFF-ZZ-00-DR-A-2421-PL5-Proposed Landscaping Elevation BPlanning App - Revised Plans2 Mar 2026View
TID-BFF-ZZ-RF-DR-A-0225-PL5-Proposed Roof PlanPlanning App - Revised Plans2 Mar 2026View
TID-BFF-ZZ-ZZ-DR-A-0420-PL5-Proposed West ElevationPlanning App - Revised Plans2 Mar 2026View
TID-BFF-ZZ-00-DR-A-2420-PL5-Proposed Landscaping Elevation APlanning App - Revised Plans2 Mar 2026View
HighwaysDC Planning App - Consultation Response (statutory)20 Feb 2026View
Heritage Impact Assessment Rev B (dated 12th February 2026)Planning App - Heritage Statement17 Feb 2026View
Design & Access Statement Rev A (12th February 2026)Planning App - Design and Access Statement17 Feb 2026View
SUPERSEDED Document Issue Register (dated 12th February 2026)Planning App - Other Supporting Documents17 Feb 2026View
Soft Landscape Supporting Information (report ref 012-JdBLA-R-001-03, 12th February 2026)Planning App - Other Supporting Documents17 Feb 2026View
SUPERSEDED Drawing Issue Sheet (TID-BFF-XX-XX-RG-A-0000, dated 13th February 2026)Planning App - Other Supporting Documents17 Feb 2026View
Health & Safety Exectutive Letter (Final Outcome)Planning App - Other Supporting Documents17 Feb 2026View
012_JDBLA-A1-00-DR-L-0400-04 Planting Plan 01Planning App - Revised Plans17 Feb 2026View
012_JDBLA-A1-00-DR-L-0401-03 Planting Plan 02Planning App - Revised Plans17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-1426-T1-Typical Critall Section detailsPlanning App - Plans Superseded17 Feb 2026View
TID-BFF-ZZ-ZZ-DR-A-1422-T1-Crittall Window type locations - Ground floorPlanning App - Revised Plans17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-1423-T1-Typical Crittall WindowPlanning App - Plans Superseded17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-1424-T1-Typical Crittall Curved WindowPlanning App - Plans Superseded17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-1425-T1-Typical Critall Plan detailsPlanning App - Plans Superseded17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0528-PL4-Proposed Section FPlanning App - Plans Superseded17 Feb 2026View
TID-BFF-ZZ-ZZ-DR-A-1340-T1-Crittall External doorPlanning App - Revised Plans17 Feb 2026View
TID-BFF-ZZ-ZZ-DR-A-1341-T1-Crittall External door detailsPlanning App - Revised Plans17 Feb 2026View
TID-BFF-ZZ-ZZ-DR-A-1420-T1-Crittall Window TypesPlanning App - Revised Plans17 Feb 2026View
TID-BFF-ZZ-ZZ-DR-A-1421-T1-Crittall Window type locations - First floorPlanning App - Revised Plans17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0522-PL4-Proposed Section APlanning App - Plans Superseded17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0524-PL4-Proposed Section BPlanning App - Plans Superseded17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0525-PL4-Propsoed Section CPlanning App - Plans Superseded17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0526-PL4-Proposed Section DPlanning App - Plans Superseded17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0420-PL4-Proposed West ElevationPlanning App - Plans Superseded17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0421-PL4-Proposed North ElevationPlanning App - Plans Superseded17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0422-PL4-Proposed East ElevationPlanning App - Plans Superseded17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0423-PL4-Proposed South ElevationPlanning App - Plans Superseded17 Feb 2026View
TID-BFF-ZZ-B1-DR-A-0120-PL3-Strip-out Basement PlanPlanning App - Revised Plans17 Feb 2026View
TID-BFF-ZZ-B1-DR-A-0220-PL4-Proposed Basement PlanPlanning App - Revised Plans17 Feb 2026View
TID-BFF-ZZ-RF-DR-A-0125-PL3-Strip-out Roof PlanPlanning App - Revised Plans17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-RF-DR-A-0225-PL4-Proposed Roof PlanPlanning App - Plans Superseded17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-00-DR-A-2420-PL4-Proposed Landscaping Elevation APlanning App - Plans Superseded17 Feb 2026View
SUPERSEDED TID-BFF-ZZ-00-DR-A-2421-PL4-Proposed Landscaping Elevation BPlanning App - Plans Superseded17 Feb 2026View
TID-BFF-ZZ-01-DR-A-0122-PL4-Strip-out First Floor PlanPlanning App - Revised Plans17 Feb 2026View
TID-BFF-ZZ-01-DR-A-0222-PL5-Proposed First Floor PlanPlanning App - Revised Plans17 Feb 2026View
TID-BFF-ZZ-00-DR-A-0221-PL4-Proposed Ground Floor PlanPlanning App - Revised Plans17 Feb 2026View
TID-BFF-ZZ-00-DR-A-2400-PL4-Proposed Landscaping GA PlanPlanning App - Revised Plans17 Feb 2026View
TID-BFF-ZZ-00-DR-A-2401-PL3-Proposed Hard Landscaping PlanPlanning App - Revised Plans17 Feb 2026View
TID-BFF-RS-00-DR-A-2465-PL3-Proposed Refuse Store DetailsPlanning App - Revised Plans17 Feb 2026View
TID-BFF-ZZ-00-DR-A-0121-PL3-Strip-out Ground Floor PlanPlanning App - Revised Plans17 Feb 2026View
TID-BFF-ZZ-00-DR-A-0200-PL5-Proposed Site PlanPlanning App - Revised Plans17 Feb 2026View
EcologyDC Planning App - Consultation Response (statutory)24 Nov 2025View
EcologyDC Planning App - Consultation Response (statutory)19 Nov 2025View
Historic EnvironmentDC Planning App - Consultation Response (statutory)17 Nov 2025View
Twentieth Century SocietyDC Planning App - Consultation Response (statutory)14 Nov 2025View
HighwaysDC Planning App - Consultation Response (statutory)14 Nov 2025View
Historic EnglandDC Planning App - Consultation Response (statutory)13 Nov 2025View
Historic EnglandDC Planning App - Consultation Response (statutory)12 Nov 2025View
Environmental ServicesDC Planning App - Consultation Response (statutory)10 Nov 2025View
HighwaysDC Planning App - Consultation Response (statutory)3 Nov 2025View
Historic EnvironmentDC Planning App - Consultation Response (statutory)31 Oct 2025View
DC Planning App - Site NoticeDC Planning App - Site Notice27 Oct 2025View
SUPERSEDED Heritage Impact Assessment rev A 20.10.25Planning App - Heritage Statement22 Oct 2025View
Soft Landscape Supporting InformationPlanning App - Other Supporting Documents9 Oct 2025View
TID-BFF-ZZ-ZZ-DR-A-0527-PL3-Proposed Section EPlanning App - Plans9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0528-PL3-Proposed Section FPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0525-PL3-Propsoed Section CPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0526-PL3-Proposed Section DPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0522-PL3-Proposed Section APlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0524-PL3-Proposed Section BPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0422-PL3-Proposed East ElevationPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0423-PL3-Proposed South ElevationPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0420-PL3-Proposed West ElevationPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-ZZ-DR-A-0421-PL3-Proposed North ElevationPlanning App - Plans Superseded9 Oct 2025View
TID-BFF-ZZ-ZZ-DR-A-0056-PL2-Existing Section BPlanning App - Plans9 Oct 2025View
TID-BFF-ZZ-ZZ-DR-A-0057-PL2-Existing Section CPlanning App - Plans9 Oct 2025View
TID-BFF-ZZ-ZZ-DR-A-0058-PL2-Existing Section DPlanning App - Plans9 Oct 2025View
TID-BFF-ZZ-ZZ-DR-A-0048-PL2-Existing South ElevationPlanning App - Plans9 Oct 2025View
TID-BFF-ZZ-ZZ-DR-A-0054-PL2-Existing Section APlanning App - Plans9 Oct 2025View
TID-BFF-ZZ-ZZ-DR-A-0047-PL2-Existing East ElevationPlanning App - Plans9 Oct 2025View
TID-BFF-ZZ-ZZ-DR-A-0045-PL2-Existing West ElevationPlanning App - Plans9 Oct 2025View
TID-BFF-ZZ-ZZ-DR-A-0046-PL2-Existing North ElevationPlanning App - Plans9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-RF-DR-A-0225-PL3-Proposed Roof PlanPlanning App - Plans Superseded9 Oct 2025View
TID-BFF-ZZ-ZZ-DR-A-0001-PL3-Existing Location PlanPlanning App - Plans9 Oct 2025View
TID-BFF-ZZ-ZZ-DR-A-0005-PL3-Existing Site PlanPlanning App - Plans9 Oct 2025View
TID-BFF-ZZ-RF-DR-A-0025-PL2-Existing RoofPlanning App - Plans9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-RF-DR-A-0125-PL2-Strip-out Roof PlanPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-B1-DR-A-0120-PL2-Strip-out Basement PlanPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-B1-DR-A-0220-PL3-Proposed Basement PlanPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-01-DR-A-0122-PL3-Strip-out First Floor PlanPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-01-DR-A-0222-PL4-Proposed First FloorPlanning App - Plans Superseded9 Oct 2025View
TID-BFF-ZZ-B1-DR-A-0020-PL2-Existing BasementPlanning App - Plans9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-00-DR-A-2421-PL2-Prop Landscaping Elevation BPlanning App - Plans Superseded9 Oct 2025View
TID-BFF-ZZ-01-DR-A-0022-PL2 Existing first floorPlanning App - Plans9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-00-DR-A-2401-PL1-Prop Hard Landscaping PlanPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-00-DR-A-2420-PL2-Prop Landscaping Elevation APlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-00-DR-A-2400-PL2-Prop Landscaping GA PlanPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-00-DR-A-0200-PL4-Proposed Site PlanPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-00-DR-A-0221-PL3-Proposed Ground FloorPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-ZZ-00-DR-A-0121-PL2-Strip-out Ground Floor PlanPlanning App - Plans Superseded9 Oct 2025View
SUPERSEDED TID-BFF-RS-00-DR-A-2465-PL1-Proposed Refuse StorePlanning App - Plans Superseded9 Oct 2025View
TID-BFF-ZZ-00-DR-A-0021PL2Existing Ground FloorPlanning App - Plans9 Oct 2025View
SUPERSEDED 012_JdBLA-A1-00-DR-L-0401_02 Planting02Planning App - Plans Superseded9 Oct 2025View
Prop Roof Level GA 23185-04 APlanning App - Plans9 Oct 2025View
Roof Level 1831-RL-0625-701-APlanning App - Plans9 Oct 2025View
SUPERSEDED 012_JdBLA-A1-00-DR-L-0400_03 Planting 01Planning App - Plans Superseded9 Oct 2025View
Noise Impact AssessmentPlanning App - Other Supporting Documents9 Oct 2025View
SUPERSEDED Drawing Issue SheetPlanning App - Other Supporting Documents9 Oct 2025View
Habitat Management and Monitoring PlanPlanning App - Other Supporting Documents9 Oct 2025View
Biodiversity Gain PlanPlanning App - Other Supporting Documents9 Oct 2025View
SUPERSEDED Design and Access Addendum Pt2Planning App - Design and Access Statement9 Oct 2025View
SUPERSEDED Design and Access Addendum Pt1Planning App - Design and Access Statement9 Oct 2025View
DC Planning App - New Application FormDC Planning App - New Application Form9 Oct 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.