Council planning record

Installation of Solar Panels to the property roof The solar panels will be connected to a 25 kW three phase inverter. The panel array will be connected to separate MPP Trackers** in order to effectively optimise the orientation of the building and minimise the effects of any shading elements. The batteries and other controls will be located in the electrical switch room and all cable, containment and mounting materials will be provided. The four 5.8 kWh batteries will be configured in an â¿¿AC Coupledâ¿¿ setup and would be charged from a designated charge controller. We estimate that the installation will be completed in approximately 3-4 days by our installation team. We may be required to store some components on site during the work, providing this can be done securely and without undue inconvenience. We will erect scaffolding at eaves height and edge protection where required to provide safe access to the roof in order to complete the installation. We will notify the District Network Operator (DNO) of the installation to ensure it is correctly registered on the network.

Marine Park, Marine House Gapton Hall Road Bradwell NR31 0NB

Not proceeded withReference: 06/24/0066/PADGreat Yarmouth Borough Council

Last published check: 22 Oct 2026, 00:34. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decided

    Published milestoneCouncil source

Application summary

Status
Not proceeded with
Application type
Not published
Received
25 Jan 2024
Validated
25 Jan 2024
Determination deadline
21 Mar 2024
Local authority
Great Yarmouth Borough Council

Application overview

Installation of Solar Panels to the property roof The solar panels will be connected to a 25 kW three phase inverter. The panel array will be connected to separate MPP Trackers** in order to effectively optimise the orientation of the building and minimise the effects of any shading elements. The batteries and other controls will be located in the electrical switch room and all cable, containment and mounting materials will be provided. The four 5.8 kWh batteries will be configured in an â¿¿AC Coupledâ¿¿ setup and would be charged from a designated charge controller. We estimate that the installation will be completed in approximately 3-4 days by our installation team. We may be required to store some components on site during the work, providing this can be done securely and without undue inconvenience. We will erect scaffolding at eaves height and edge protection where required to provide safe access to the roof in order to complete the installation. We will notify the District Network Operator (DNO) of the installation to ensure it is correctly registered on the network.

Proposal details

Reference
06/24/0066/PAD
Parish
Bradwell North
Agent
Mr Andrew Jarvis Kestrel Court, Waterwells Drive Gloucester Gloucestershire GL2 2AT

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Marine Park, Marine House Gapton Hall Road Bradwell NR31 0NB

This record has no verified map location.

Documents 4 of 4

DocumentPublishedAction
PV Layout - PV06634-INS-DG-GA-0004 Unit 3Planning App - Plans21 Feb 2024View
61021_1 Roof LayoutsPlanning App - Plans21 Feb 2024View
PV Layout - PV06623-INS-DG-GA-0005 Unit 4Planning App - Plans21 Feb 2024View
DC Planning App - New App & PlansDC Planning App - New App & Plans21 Feb 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Not proceeded with
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.