Council planning record

DEMOLITION OF EXISTING SEA WALL, REVETMENT AND MINATURE RAILWAY SHED, AND REPLACEMENT WITH NEW COASTAL PROTECTION SCHEME CONSISTING OF A STEPPED REVETMENT, INCLUDING PUBLIC REALM IMPROVEMENTS TO PROMENADE, CONSTRUCTION OF TEMPORARY COMPOUND AREAS AT FAIRHAVEN ROAD CAR PARK/ THE ISLAND CAR PARK, TEMPORARY INFILL OF LAKE FOR USE AS TEMPORARY CAR PARK/ TEMPORARY RELOCATION OF BEACH HUTS/ TEMPORARY COMPOUND AREA, TEMPORARY STORAGE CONTAINERS AND TUNNEL FOR MINATURE RAILWAY, THE SITING OF 45 BEACH HUTS, REPLACEMENT RAIL TUNNEL AND ENGINE SHED AND RECONFIGURATION OF PLEASURE ISLAND CAR PARK.

PROMENADE SEA WALL DEFENCE FROM DENFORD ROAD TO ST ANNES PIER SOUTH PROMENADE LYTHAM ST ANNES

PendingReference: 23/0082Fylde Borough Council

Last published check: 13 Oct 2026, 22:37. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Consultation Start Date

    Published milestoneCouncil source
  4. Site Notice Date

    Published milestoneCouncil source
  5. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Advert Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Pending
Application type
Full Planning Permission
Received
1 Feb 2023
Validated
3 Apr 2023
Determination deadline
Not published
Local authority
Fylde Borough Council

Application overview

DEMOLITION OF EXISTING SEA WALL, REVETMENT AND MINATURE RAILWAY SHED, AND REPLACEMENT WITH NEW COASTAL PROTECTION SCHEME CONSISTING OF A STEPPED REVETMENT, INCLUDING PUBLIC REALM IMPROVEMENTS TO PROMENADE, CONSTRUCTION OF TEMPORARY COMPOUND AREAS AT FAIRHAVEN ROAD CAR PARK/ THE ISLAND CAR PARK, TEMPORARY INFILL OF LAKE FOR USE AS TEMPORARY CAR PARK/ TEMPORARY RELOCATION OF BEACH HUTS/ TEMPORARY COMPOUND AREA, TEMPORARY STORAGE CONTAINERS AND TUNNEL FOR MINATURE RAILWAY, THE SITING OF 45 BEACH HUTS, REPLACEMENT RAIL TUNNEL AND ENGINE SHED AND RECONFIGURATION OF PLEASURE ISLAND CAR PARK.

Proposal details

Reference
23/0082
Ward
Fairhaven, Central
Parish
St Anne's on the Sea
Agent
MR CHRIS HARDING, Jacobs

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

PROMENADE SEA WALL DEFENCE FROM DENFORD ROAD TO ST ANNES PIER SOUTH PROMENADE LYTHAM ST ANNES

This record has no verified map location.

Documents 189 of 189

DocumentPublishedAction
Highway CommentsConsultee Comment3 Feb 2026View
Swept Path Analysis-Pleasure Island EntryInitial Drawing28 Nov 2025View
Fairhaven Rd Compound parking layoutInitial Drawing28 Nov 2025View
Swept Path Analysis-Fairhaven Rd Car Park ExitInitial Drawing28 Nov 2025View
Swept Path Analysis-Pleasure Island ExitInitial Drawing28 Nov 2025View
Swept Path Analysis-Fairhaven Rd Car Park EntryInitial Drawing28 Nov 2025View
Environment AgencyConsultee Comment10 Nov 2025View
highway comments.Consultee Comment7 Nov 2025View
GmeuConsultee Comment27 Oct 2025View
Environment agencyConsultee Comment20 Oct 2025View
St Annes Town Council (OCt 2025)Consultee Comment15 Oct 2025View
Natural england commentConsultee Comment6 Oct 2025View
Landscape Masterplan Sheet 2 of 3Amended Plan29 Sept 2025View
Landscape Masterplan Sheet 1 of 3Amended Plan29 Sept 2025View
Hard LandscapingAmended Plan29 Sept 2025View
Environmental Report Figure 1.2 Scheme AreaAmended Plan29 Sept 2025View
RNLI V-Shaped wall elesAmended Plan29 Sept 2025View
Landscape Masperplan Overview PlanAmended Plan29 Sept 2025View
Phase 2 GA 2/2Amended Plan29 Sept 2025View
Phase 1 GA 1/5Amended Plan29 Sept 2025View
Location PlanAmended Plan29 Sept 2025View
Property Level Protection ProposalsBackground Documents29 Sept 2025View
Proposed Construction Site Compound (Fairhaven Road Car Park)Background Documents29 Sept 2025View
Environmental Statement Addendum (September 2025)Background Documents29 Sept 2025View
Environmental Statement Addendum (March 2025)Background Documents25 Mar 2025View
Hard Landscape DetailsSuperseded26 Feb 2025View
Defence Sections 7/8Amended Plan15 Nov 2024View
Defence Sections 8/8Amended Plan15 Nov 2024View
Defence Sections 4/8Amended Plan15 Nov 2024View
Defence Sections 3/8Amended Plan15 Nov 2024View
Phase 2 GA 2/2Superseded15 Nov 2024View
Phase 1 GA 1/5Superseded15 Nov 2024View
Temp compound layout for RNLISuperseded15 Nov 2024View
Natural England 04/05/2023Consultee Comment5 Nov 2024View
Natural England 05/11/2024 cover emailConsultee Comment5 Nov 2024View
Applicationform RedactedApplication Form No Personal Data15 Oct 2024View
LLFA commentConsultee Comment21 Mar 2024View
revised Construction Environmental Management Plan CEMPBackground Documents12 Jan 2024View
EAConsultee Comment15 Dec 2023View
Revised BNG Metric November 2023Additional Information17 Nov 2023View
BNG ReportBackground Documents17 Nov 2023View
Landscape Environmental Management Plan (LEMP)Background Documents17 Nov 2023View
Sand Dune AssessmentBackground Documents17 Nov 2023View
Marine and Fisheries AssesmentBackground Documents17 Nov 2023View
Construction Environmental Management Plan (CEMP)Superseded17 Nov 2023View
United Utilities updated responseConsultee Comment3 Oct 2023View
United UtilitiesConsultee Comment21 Sept 2023View
MOD_ResponseConsultee Comment12 Sept 2023View
Art work (Final)Initial Drawing5 Sept 2023View
Phase 2 GA 2/2Superseded31 Aug 2023View
Phase 1 GA 1/5Superseded31 Aug 2023View
Hard landscaping detailsSuperseded23 Aug 2023View
RNLI V-Shaped wall elesSuperseded23 Aug 2023View
united utilitiesConsultee Comment3 Aug 2023View
Gardens TrustConsultee Comment13 May 2023View
Material ScheduleBackground Documents12 May 2023View
Fairhaven Rd compound details (superseded)Background Documents12 May 2023View
Surface Water Outfall example photo (Fairhaven)Background Documents11 May 2023View
BAEConsultee Comment4 May 2023View
Natural EnglandConsultee Comment4 May 2023View
LCC HighwaysConsultee Comment25 Apr 2023View
EAConsultee Comment24 Apr 2023View
LCC ArchaeologyConsultee Comment21 Apr 2023View
St Annes Town CouncilConsultee Comment19 Apr 2023View
Marine ManagementConsultee Comment13 Apr 2023View
Blackpool AirportConsultee Comment10 Apr 2023View
Historic EnglandConsultee Comment6 Apr 2023View
NATS SafeguardingConsultee Comment5 Apr 2023View
Planning, Design and Access Statement March 23Background Documents3 Apr 2023View
Environmental Statement (03 2023)Background Documents3 Apr 2023View
Minature railway shedInitial Drawing2 Mar 2023View
Temporary Flood Barrier Deployment Procedure (removed from submission)Background Documents27 Feb 2023View
signage adjacent to beach huts (north)Initial Drawing13 Feb 2023View
signage adjacent to Salters Wharf (2)Initial Drawing13 Feb 2023View
signage adajcent to RNLI slipway (2)Initial Drawing13 Feb 2023View
signage adjacent to beach huts (south)Initial Drawing13 Feb 2023View
signage boating lake outfallInitial Drawing13 Feb 2023View
signage adjacent to boating lakeInitial Drawing13 Feb 2023View
signage sewall south (2)Initial Drawing13 Feb 2023View
signage seawall north (2)Initial Drawing13 Feb 2023View
signage seawall north (1)Initial Drawing13 Feb 2023View
signage seawall south (1)Initial Drawing13 Feb 2023View
signage adjacent to Salters Wharf (1)Initial Drawing13 Feb 2023View
Signage adjacent to RNLI slipway (1)Initial Drawing13 Feb 2023View
Signage adjacent to Lower swimming pool car aprkInitial Drawing13 Feb 2023View
Signage adjacent to View cafeInitial Drawing13 Feb 2023View
RNLI temporary flood barrier elevations (removed from submision)Superseded13 Feb 2023View
Temporary mini railway storage containers & engine shedInitial Drawing13 Feb 2023View
Pedestrain entrance elevationsInitial Drawing13 Feb 2023View
RNLI V-shaped wall elevationsSuperseded13 Feb 2023View
Street Furniture & signage LayoutInitial Drawing13 Feb 2023View
Seated set back wall corner unitInitial Drawing13 Feb 2023View
Seated set back wall curved end unitInitial Drawing13 Feb 2023View
Seated set back wall standard unit designInitial Drawing13 Feb 2023View
Visual (5)Initial Drawing13 Feb 2023View
Visual (6)Initial Drawing13 Feb 2023View
Visual (7)Initial Drawing13 Feb 2023View
Visual (3) (removed from submission)Superseded13 Feb 2023View
Visual (4) (removed from submission)Superseded13 Feb 2023View
Visual (1) (removed submission)Superseded13 Feb 2023View
Visual (2) (removed from submission)Superseded13 Feb 2023View
RNLI temp flood barrier image (removed from submissoin)Superseded13 Feb 2023View
Pedestrian entrance temp flood barrier imageInitial Drawing13 Feb 2023View
RNLI v shaped wall concrete imprinting & temp barrier (removed from submission)Superseded13 Feb 2023View
Environmental Statement App C Outline Construction Traffic Mgmt PlanBackground Documents13 Feb 2023View
Environmental Report App H UKHAB Survey 3/4Initial Drawing1 Feb 2023View
Environmental Report App H UKHab Survey 4/4Initial Drawing1 Feb 2023View
Topographical surveyInitial Drawing1 Feb 2023View
Environmental Report App K flood risk dataInitial Drawing1 Feb 2023View
Environmental Report App N Env Constraints PlanInitial Drawing1 Feb 2023View
Environmental Report App H OKHAB Survey 1/4Initial Drawing1 Feb 2023View
Environmental Report App H UKHAB Survey 2/4Initial Drawing1 Feb 2023View
Environmental Report App F Landscape 1/3Initial Drawing1 Feb 2023View
Environmental Report App F Landscape 2/3Initial Drawing1 Feb 2023View
Environmental Report App F Landscape 3/3Initial Drawing1 Feb 2023View
Environmental Report App F Landscape overviewInitial Drawing1 Feb 2023View
Environmental Report Figure 11.1 Coastal Geomorphological ReceptorsInitial Drawing1 Feb 2023View
Environmental Report Figure 10.1 Nature Conservation SitesInitial Drawing1 Feb 2023View
Environmental Report Figure 11.2 Surface WatersInitial Drawing1 Feb 2023View
Environmental Report Figure 9.1 Landscape ConstraintsInitial Drawing1 Feb 2023View
Environmental Report Figure 8.1 - Historic EnvironmentInitial Drawing1 Feb 2023View
Environmental Report Figure 7.1 Noise and VibrationInitial Drawing1 Feb 2023View
Environmental Report Figure 6.1 Traffic and TransportInitial Drawing1 Feb 2023View
Environmental Report Figure 3.1 Scheme ProposalsInitial Drawing1 Feb 2023View
Environmental Report Figure 5 Local Community, Leisure and Amenity AssetsInitial Drawing1 Feb 2023View
Environmental Report Figure 1.2 Scheme AreaSuperseded1 Feb 2023View
PDAS Appendix A Fylde Council Sea Wall Consultation Report June 2021Background Documents1 Feb 2023View
Environmental Statement App A Marine Plan Policy ReviewBackground Documents1 Feb 2023View
Environmental Statement App B Options AppraisalBackground Documents1 Feb 2023View
Environmental Statement App D LPA EIA screening opinion decisionBackground Documents1 Feb 2023View
Environmental Statement App D LPA EIA screening opinion reportBackground Documents1 Feb 2023View
Environmental Statement App D MMO Screening DecisionBackground Documents1 Feb 2023View
Environmental Statement App D MMO Screening OpinionBackground Documents1 Feb 2023View
Environmental Statement App E Heritage StatementBackground Documents1 Feb 2023View
Environmental Statement App G Invertebrate desk studyBackground Documents1 Feb 2023View
Environmental Statement App H Uk Hab & biodiversity net gain reportBackground Documents1 Feb 2023View
Environmental Statement App I HRA Appropriate AssessmentBackground Documents1 Feb 2023View
Environmental Statement App I HRA Screening reportBackground Documents1 Feb 2023View
Environmental Statement App J Marine Cons Zone screening assessBackground Documents1 Feb 2023View
Environmental Statement App K flood Risk AssessmentBackground Documents1 Feb 2023View
United Utilities infrastructure planBackground Documents1 Feb 2023View
Environmental Statement App L Water Frame Direct regs AssessBackground Documents1 Feb 2023View
Environmental Statement App M Coastal Processes & Geomorphology Baseline reportBackground Documents1 Feb 2023View
Environmental Statement App N Environmental Action PlanBackground Documents1 Feb 2023View
Car Park Access Steps LayoutInitial Drawing1 Feb 2023View
Salters Wharf Access Ramp LayoutInitial Drawing1 Feb 2023View
Salters Wharf Access Ramp SectionsInitial Drawing1 Feb 2023View
Mini Railway Access StepsInitial Drawing1 Feb 2023View
General Arrangement (GA) and PhasingInitial Drawing1 Feb 2023View
Phase 1 GA 2/5Initial Drawing1 Feb 2023View
Phase 1 GA 3/5Initial Drawing1 Feb 2023View
Phase 1 GA 4/5Initial Drawing1 Feb 2023View
Phase 1 GA 5/5Initial Drawing1 Feb 2023View
Phase 2 GA 1/2Initial Drawing1 Feb 2023View
Defence Sections 1/8Initial Drawing1 Feb 2023View
Defence Sections 2/8Initial Drawing1 Feb 2023View
Defence Sections 5/8Initial Drawing1 Feb 2023View
Defence Sections 6/8Initial Drawing1 Feb 2023View
Mini Railway General ArrangementInitial Drawing1 Feb 2023View
Mini Railway Detailed PlanInitial Drawing1 Feb 2023View
Mini Railway SectionsInitial Drawing1 Feb 2023View
Lighting Column Standard DetailsInitial Drawing1 Feb 2023View
Beach Hut electriciy connection detailsInitial Drawing1 Feb 2023View
Electrical Standard DetailsInitial Drawing1 Feb 2023View
Landscape plan 2/3Initial Drawing1 Feb 2023View
Landscape plan 3/3Initial Drawing1 Feb 2023View
Beach Hut ElevationsInitial Drawing1 Feb 2023View
Boating Lake General ArrangementInitial Drawing1 Feb 2023View
Boating Lake SectionsInitial Drawing1 Feb 2023View
Boating Lake Cross Section (construction phase)Initial Drawing1 Feb 2023View
Boating Lake Enabling Works Layout (construction)Initial Drawing1 Feb 2023View
Boating Lake Existing LayoutInitial Drawing1 Feb 2023View
Boating Lake Proposed Earthworks Contour PlanInitial Drawing1 Feb 2023View
Boating Lake Beach Hut relocation & temporary car aprkInitial Drawing1 Feb 2023View
Existing Seawall Estates PlanInitial Drawing1 Feb 2023View
Existing Seawall Trial Hole Results Fylde Council 02 Dec 20Initial Drawing1 Feb 2023View
Existing Seawall And Boating Lake LevelsInitial Drawing1 Feb 2023View
Existing Seawall Plan And SectionsInitial Drawing1 Feb 2023View
St Annes Proposed Haul Road 221024Initial Drawing1 Feb 2023View
Location PlanSuperseded1 Feb 2023View
Phase 1 GA 1/ 5Superseded1 Feb 2023View
Phase 2 GA 2/2Superseded1 Feb 2023View
Defence Sections 3/8Superseded1 Feb 2023View
Defence Sections 4/8Superseded1 Feb 2023View
Defence Sections 7/8Superseded1 Feb 2023View
Defence Sections 8/8Superseded1 Feb 2023View
RNLI Temporary Lifeboat Compound (removed from submission)Superseded1 Feb 2023View
Landscape Masterplan Overview PlanSuperseded1 Feb 2023View
Landscape plan 1/3Superseded1 Feb 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Environmental Statement App D LPA EIA screening opinion decision Environmental Statement App D MMO Screening Decision
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.