Council planning record

Grade II listed building application for repairs to the existing brick chimney stacks, remedial work to cracks in an internal fireplace, refurbishment and redecoration of existing windows ( with some sills and casements replaced) to rear and side facade, refurbishment and redecoration of existing external timber panelled doors with some lower parts of frames and sills replaced to rear facade only and associated works to these existing grade 2 listed buildings which comprise two ground floor shops and residential apartments above.

151-153, High Street, Ongar, CM5 9JD

Decision MadeReference: EPF/0987/24Epping Forest District Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received Date

    Published milestoneCouncil source
  2. Valid Date

    Published milestoneCouncil source
  3. Consultation Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decision Made
Application type
Listed building consent (Alt/Ext)
Received
13 May 2024
Validated
13 May 2024
Determination deadline
Not published
Local authority
Epping Forest District Council

Application overview

Grade II listed building application for repairs to the existing brick chimney stacks, remedial work to cracks in an internal fireplace, refurbishment and redecoration of existing windows ( with some sills and casements replaced) to rear and side facade, refurbishment and redecoration of existing external timber panelled doors with some lower parts of frames and sills replaced to rear facade only and associated works to these existing grade 2 listed buildings which comprise two ground floor shops and residential apartments above.

Proposal details

Reference
EPF/0987/24
Ward
Ongar
Parish
Ongar

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

151-153, High Street, Ongar, CM5 9JD

This record has no verified map location.

Documents 14 of 14

DocumentPublishedAction
DM Decision Notice.pdf · PDF13 Sept 2024View
REVISED - 2878_18A Joinery details 1 · PDF10 Jun 2024View
Structural Method StatementSupporting Statement/Documents · PDF7 Aug 2024View
Existing & Proposed Elevations With Site PhotographsPlans · PDF13 May 2024View
DM Neighbour Letter.docx16 May 2024View
Joinery Details 2Plans · PDF13 May 2024View
Window & Door ElevationsPlans · PDF13 May 2024View
Application Form - Without Personal DataSupporting Statement/Documents · PDF13 May 2024View
Design & Access StatementSupporting Statement/Documents · PDF13 May 2024View
REVISED - RG MP Ongar, High Street 151-153 HS vSeptember.10.1.Supporting Statement/Documents · PDF13 Sept 2024View
Existing Floor Plans, Site Plan & Location PlanPlans · PDF13 May 2024View
Ongar Town Council · PDF3 Jul 2024View
Cover LetterSupporting Statement/Documents · PDF16 May 2024View
Structural ReportSupporting Statement/Documents · PDF16 May 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve with Conditions
DM Decision Notice.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.