Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land Bounded By Sincil Street, Waterside South, Melville Street, Tentercroft Street And High Street, Lincoln
Last published check: 10 Oct 2026, 04:23. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceDemolition of existing bus station buildings, existing pedestrian footbridge between St Mary's Street and the Tentercroft Street car park and the existing station footbridge connecting the platforms within Lincoln Central railway station. Erection of a new bus station, multi-storey public car park, new pedestrian footbridge over the railway connecting the areas north and south of the railway station as well as the platforms; change of use of number 18-20 Sincil Street and a four storey extension to provide ground floor retail space totalling 265sqm with 9 residential apartments over (Block A); landscaping of the public realm; revised layout of roads and accesses including stopping up parts of Norman Street, Oxford Street and Melville Street (Resubmission).
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLand Bounded By Sincil Street, Waterside South, Melville Street, Tentercroft Street And High Street, Lincoln
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| DECISION NOTICEDecision Notice · PDF | 27 Nov 2018 | View |
| COMMENTS FROM A M WADDINGTONWritten Representation · PDF | 15 Sept 2016 | View |
| REVISED WRITTEN SCHEME OF INVESTIGATIONOther · PDF | 21 Apr 2016 | View |
| 1519 MELVILLE STREET LANDSCAPING 2 OF 2 - AOther · PDF | 31 Mar 2016 | View |
| VISUALISATIONSOther · PDF | 30 Mar 2016 | View |
| VIEW ON CORNHILL PAVEMENT LOOKING EAST (SANTANDER)Other · PDF | 24 Mar 2016 | View |
| PROPOSED MASTERPLAN - BARRIERS TO PEDESTRIAN MOVEMOther · PDF | 24 Mar 2016 | View |
| CONSTRUCTION PHASESOther · PDF | 24 Mar 2016 | View |
| PROPOSED MASTERPLAN ROAD NETWORK FIGURE/GROUNDOther · PDF | 24 Mar 2016 | View |
| VIEW FROM PIAZZA LOOKING WESTOther · PDF | 24 Mar 2016 | View |
| EXTERNAL WORKS PROPOSALS OXFORD STREET SURFACE CAROther · PDF | 24 Mar 2016 | View |
| PROPOSED ELEVATIONS AND SECTIONS, 18-20 SINCIL STROther · PDF | 24 Mar 2016 | View |
| TEMPORARY CO-OP ACCESS RIGID HGV VEHICLE SWEPT PATOther · PDF | 24 Mar 2016 | View |
| ARBORICULTURAL SURVEYOther · PDF | 24 Mar 2016 | View |
| VIEW FROM PELHAM BRIDGE LOOKING NORTHOther · PDF | 24 Mar 2016 | View |
| VIEW FROM PIAZZA PLINTH LOOKING NORTHOther · PDF | 24 Mar 2016 | View |
| ANALYSIS OF EXISTING BARRIERS TO PEDESTRIAN MOVEMEOther · PDF | 24 Mar 2016 | View |
| BUS STATION PROPOSED SECTIONS SHEET 2 OF 2Other · PDF | 24 Mar 2016 | View |
| NON TECHNICAL SUMMARYOther · PDF | 24 Mar 2016 | View |
| WASTE REDUCTION AND BEST PRACTICE WASTE MANAGEMENTOther · PDF | 24 Mar 2016 | View |
| VIEW ON LINDUM HILL LOOKING SOUTHOther · PDF | 24 Mar 2016 | View |
| VIEW AT LINDUM TERRACE LOOKING SOUTHOther · PDF | 24 Mar 2016 | View |
| VIEW ON SCORER STREET LOOKING NORTHOther · PDF | 24 Mar 2016 | View |
| EXISTING BUS STATION PLANOther · PDF | 24 Mar 2016 | View |
| OBJECTIVES REINFORCE ? ENCOURAGE PEDESTRIAN FLOW TOther · PDF | 24 Mar 2016 | View |
| NOISE MONITORING RESULTSOther · PDF | 24 Mar 2016 | View |
| BIRDS EYE VIEW PUBLIC REALMOther · PDF | 24 Mar 2016 | View |
| VIEW FROM THE BARBICAN LOOKING SOUTH EASTOther · PDF | 24 Mar 2016 | View |
| VIEW FROM THE PIAZZA LOOKING NORTHOther · PDF | 24 Mar 2016 | View |
| MSCP GROUND FLOOROther · PDF | 24 Mar 2016 | View |
| EXTERNALS WORKS PROPOSALS RAILWAY FORECOURTOther · PDF | 24 Mar 2016 | View |
| 1519 - NEW PIAZZA LANDSCAPING - PHASE 1 - COther · PDF | 24 Mar 2016 | View |
| ANALYSIS OF EXISTING PEDESTRIAN MOVEMENTSOther · PDF | 24 Mar 2016 | View |
| PROPOSED ELEVATIONS AND SECTIONS, 18-20 SINCIL STROther · PDF | 24 Mar 2016 | View |
| VIEW FROM NORMAN PLACE LOOKING WESTOther · PDF | 24 Mar 2016 | View |
| PRELIMINARY MSCP PLANS ROOF PLANOther · PDF | 24 Mar 2016 | View |
| VIEW FROM MELVILLE STREET LOOKING SOUTHOther · PDF | 24 Mar 2016 | View |
| ANALYSIS OF EXISTING SHORT RANGE VIEWSOther · PDF | 24 Mar 2016 | View |
| BUS STATION GROUND FLOOR PLANOther · PDF | 24 Mar 2016 | View |
| TRANSPORT HUB ASSESSMENTOther · PDF | 24 Mar 2016 | View |
| HERITAGE ASSESSMENTOther · PDF | 24 Mar 2016 | View |
| BUS STATION ELEVATIONS SOUTH AND WESTOther · PDF | 24 Mar 2016 | View |
| CONSTRUCTION TRAFFICOther · PDF | 24 Mar 2016 | View |
| VIEW AT LIQURICE PARK LOOKING SOUTH EASTOther · PDF | 24 Mar 2016 | View |
| VIEW FROM PIAZZA LOOKING NORTH WESTOther · PDF | 24 Mar 2016 | View |
| ARCHAEOLOGICAL INVESTIGATIONS - WRITTEN SCHEME OFOther · PDF | 24 Mar 2016 | View |
| EXTERNAL WORKS PROPOSALS OXFORD STREET SURFACE CAROther · PDF | 24 Mar 2016 | View |
| PROPOSED MASTERPLAN SOFT LANDSCAPEOther · PDF | 24 Mar 2016 | View |
| BIRDS EYE VIEW PUBLIC REALMOther · PDF | 24 Mar 2016 | View |
| HERITAGE DESIGNATION EXTRACTSOther · PDF | 24 Mar 2016 | View |
| LINCOLN CENTRAL EXISTING PLATFORM FOOTBRIDGEOther · PDF | 24 Mar 2016 | View |
| VIEW ON ST MARY'S LOOKING WESTOther · PDF | 24 Mar 2016 | View |
| VIEW ON RIPON STREET LOOKING NORTHOther · PDF | 24 Mar 2016 | View |
| EXISTING STREET ELEVATIONS COMPARATIVE DEVELOPMENTOther · PDF | 24 Mar 2016 | View |
| ANALYSIS OF EXISTING STREET FRONTAGES DEFINED/UNDEOther · PDF | 24 Mar 2016 | View |
| ANALYSIS OF EXISTING ROAD NETWORK FIGURE/GROUNDOther · PDF | 24 Mar 2016 | View |
| MSCP DETAILED ELEVATION PEDESTRIAN ENTRANCES SOUTHOther · PDF | 24 Mar 2016 | View |
| PRELIMINARY MSCP PLANS LEVEL 5 PLANOther · PDF | 24 Mar 2016 | View |
| 1519 - PLANTING DESCRIPTIONOther · PDF | 24 Mar 2016 | View |
| EXISTING ELEVATIONS BUS STATIONOther · PDF | 24 Mar 2016 | View |
| PROPOSED MASTERPLANOther · PDF | 24 Mar 2016 | View |
| VIEW FROM THE TRAIN STATION ENTRANCE LOOKING NORTHOther · PDF | 24 Mar 2016 | View |
| BUS STATION ELEVATIONS SOUTH AND WESTOther · PDF | 24 Mar 2016 | View |
| VIEW FROM TRAIN STATION FORECOURT LOOKING NORTH EAOther · PDF | 24 Mar 2016 | View |
| EXTERNAL WORKS PROPOSALS NEW PIAZZAOther · PDF | 24 Mar 2016 | View |
| TEMPORARY CO-OP ACCESS ARTICULATED HGV VEHICLE SWEOther · PDF | 24 Mar 2016 | View |
| VIEW FROM OXFORD STREET LOOKING NORTH WESTOther · PDF | 24 Mar 2016 | View |
| PROPOSED PLINTH DETAIL TO PUBLIC REALMOther · PDF | 24 Mar 2016 | View |
| SITE LOCATION PLAN, DEVELOPMENT SITE EXTENTOther · PDF | 24 Mar 2016 | View |
| PROPOSED ELEVATIONS AND SECTIONS, 18-20 SINCIL STROther · PDF | 24 Mar 2016 | View |
| BUS STATION FIRST FLOOR PLANOther · PDF | 24 Mar 2016 | View |
| DESIGN AND ACCESS STATEMENTOther · PDF | 24 Mar 2016 | View |
| NCP CAR PARK EVALUATIONOther · PDF | 24 Mar 2016 | View |
| PROPOSED ELEVATIONS NORTH AND WESTOther · PDF | 24 Mar 2016 | View |
| ANALYSIS OF EXISTING PEDESTRIAN DESIRE LINES FROMOther · PDF | 24 Mar 2016 | View |
| SITE LOCATION PLANPlan · PDF | 24 Mar 2016 | View |
| NULLOther · PDF | 24 Mar 2016 | View |
| PLATESOther · PDF | 24 Mar 2016 | View |
| BIRDEYE VIEW PROPOSALS OVERVIEWOther · PDF | 24 Mar 2016 | View |
| HERITAGE IMPACT ASSESSMENTOther · PDF | 24 Mar 2016 | View |
| MODEL VERIFICATION PROCEDUREOther · PDF | 24 Mar 2016 | View |
| VIEW AT BISHOPS PALACE LOOKING SOUTHOther · PDF | 24 Mar 2016 | View |
| PROPOSED ELEVATIONS SOUTH AND EASTOther · PDF | 24 Mar 2016 | View |
| VIEW ON CANWICK HILL AT WASHINGBOROUGH ROAD LOOKINOther · PDF | 24 Mar 2016 | View |
| BUS STATION ELEVATIONS SOUTH AND WESTOther · PDF | 24 Mar 2016 | View |
| MSCP GROUND FLOOROther · PDF | 24 Mar 2016 | View |
| EXISTING TREES TO BE REMOVEDOther · PDF | 24 Mar 2016 | View |
| VIEW FROM THE TRAIN STATION ENTRANCE LOOKING EASTOther · PDF | 24 Mar 2016 | View |
| ANALYSIS OF EXISTING LONG RANGE VIEWSOther · PDF | 24 Mar 2016 | View |
| PROPOSED PLANS 18-20 SINCIL STREET AND BLOCK A, SEOther · PDF | 24 Mar 2016 | View |
| UPDATED HABITAT SURVEYOther · PDF | 24 Mar 2016 | View |
| BUS STATION FIRST FLOOR PLANOther · PDF | 24 Mar 2016 | View |
| 1519 - NEW PIAZZA LANDSCAPING - AOther · PDF | 24 Mar 2016 | View |
| PRELIMINARY MSCP PLANS LEVEL 5 PLANOther · PDF | 24 Mar 2016 | View |
| PROPOSED MASTERPLAN PHASE 1 WORKSOther · PDF | 24 Mar 2016 | View |
| VIEW FROM OXFORD STREET LOOKING WESTOther · PDF | 24 Mar 2016 | View |
| SITE LOCATION PLAN, OVERALL DEMOLITION PLANOther · PDF | 24 Mar 2016 | View |
| BUS STATION GROUND FLOOR PLANOther · PDF | 24 Mar 2016 | View |
| EXTERNAL WORKS PROPOSALS MELVILLE STREETOther · PDF | 24 Mar 2016 | View |
| OBJECTIVES LINKING PARK WARDOther · PDF | 24 Mar 2016 | View |
| VIEW ON PORTLAND STREET LOOKING NORTHOther · PDF | 24 Mar 2016 | View |
| BIRDS EYE VIEW PUBLIC REALMOther · PDF | 24 Mar 2016 | View |
| PRELIMINARY MSCP PLANS LEVELS 1-4 PLANOther · PDF | 24 Mar 2016 | View |
| MSCP DETAILED ELEVATION PEDESTRIAN ENTRANCES SOUTHOther · PDF | 24 Mar 2016 | View |
| EXTENDED PHASE 1 HABITAT SURVEYOther · PDF | 24 Mar 2016 | View |
| VIEW ON CITY SQUARE LOOKING SOUTH EASTOther · PDF | 24 Mar 2016 | View |
| PHASE I ENVIRONMENTAL SITE ASSESSMENTOther · PDF | 24 Mar 2016 | View |
| 1519 MELVILLE STREET LANDSCAPING 1 OF 2 - AOther · PDF | 24 Mar 2016 | View |
| ENVIRONMENTAL STATEMENTOther · PDF | 24 Mar 2016 | View |
| ANALYSIS OF EXISTING HISTORIC/LISTED PROPERTIESOther · PDF | 24 Mar 2016 | View |
| PROPOSED ELEVATIONS SOUTH AND EASTOther · PDF | 24 Mar 2016 | View |
| MAP OF THE CATHEDRAL AND CITY CENTRE CONSERVATIONOther · PDF | 24 Mar 2016 | View |
| BUS STATION ELEVATIONS NORTH AND EASTOther · PDF | 24 Mar 2016 | View |
| VIEW FROM PELHAM BRIDGE LOOKING WESTOther · PDF | 24 Mar 2016 | View |
| PROPOSED PLANS 18-20 SINCIL STREETOther · PDF | 24 Mar 2016 | View |
| BLOCK PLAN AS EXISTINGOther · PDF | 24 Mar 2016 | View |
| 1519 - RAILWAY FORECOURT LANDSCAPINGOther · PDF | 24 Mar 2016 | View |
| VIEW FROM SINCIL STREET LOOKING SOUTHOther · PDF | 24 Mar 2016 | View |
| PROPOSED MASTERPLAN - VEHICULAR MOVEMENTSOther · PDF | 24 Mar 2016 | View |
| EXISTING ELEVATIONS RAILWAY BOUNDARY WALLOther · PDF | 24 Mar 2016 | View |
| PROPOSED MASTERPLAN PEDESTRIAN ZONESOther · PDF | 24 Mar 2016 | View |
| GEO-ENVIRONMENTAL ASSESSMENTOther · PDF | 24 Mar 2016 | View |
| VIEW FROM THE PIAZZA LOOKING TO THE ENTRANCE OF SIOther · PDF | 24 Mar 2016 | View |
| VIEW FROM PELHAM BRIDGE LOOKING NORTH WESTOther · PDF | 24 Mar 2016 | View |
| BUS STATION ROOF PLANOther · PDF | 24 Mar 2016 | View |
| OBJECTIVES INTEGRATED TRASNPORT SOLUTIONOther · PDF | 24 Mar 2016 | View |
| DRAWINGSOther · PDF | 24 Mar 2016 | View |
| EXTERNAL WORKS PROPOSALS TENTERCROFT STREET POCKETOther · PDF | 24 Mar 2016 | View |
| VIEW AT SINCIL STREET LOOKING SOUTHOther · PDF | 24 Mar 2016 | View |
| 1519 - SOUTHERN CAR PARK LANDSCAPINGOther · PDF | 24 Mar 2016 | View |
| PROPOSED ELEVATIONS NORTH AND WESTOther · PDF | 24 Mar 2016 | View |
| PROPOSED PLANS 18-20 SINCIL STREET AND BLOCK A, SEOther · PDF | 24 Mar 2016 | View |
| BS5837 TREE SURVEYOther · PDF | 24 Mar 2016 | View |
| INITIAL CONCEPTSOther · PDF | 24 Mar 2016 | View |
| SITE WASTE MANAGEMENT PLANOther · PDF | 24 Mar 2016 | View |
| VIEW FROM MELVILLE STREET EXIT LOOKING WESTOther · PDF | 24 Mar 2016 | View |
| ANALYSIS OF EXISTING TRANSPORT NODESOther · PDF | 24 Mar 2016 | View |
| MSCP PROPOSED SECTIONS SHEET 1 OF 2Other · PDF | 24 Mar 2016 | View |
| VIEW ON CANWICK HILL AT HALL DRIVE JUNCTION LOOKINOther · PDF | 24 Mar 2016 | View |
| VIEW ON ST MARY'S LOOKING EASTOther · PDF | 24 Mar 2016 | View |
| FLOOR RISK ASSESSMENTOther · PDF | 24 Mar 2016 | View |
| OBJECTIVES FACILITATE ELECTRIFICATION OF RAILWAYOther · PDF | 24 Mar 2016 | View |
| PLANNING STATEMENTOther · PDF | 24 Mar 2016 | View |
| TRANSPORT ASSESSMENTOther · PDF | 24 Mar 2016 | View |
| VIEW ON CORNHILL PAVEMENT LOOKING EAST (WH SMITH)Other · PDF | 24 Mar 2016 | View |
| BUS STATION PROPOSED SECTIONS SHEET 1 OF 2Other · PDF | 24 Mar 2016 | View |
| VIEW FROM PELHAM BRIDGE LOOKING NORTH WESTOther · PDF | 24 Mar 2016 | View |
| VIEW FROM THE PIAZZA LOOKING NORTH EASTOther · PDF | 24 Mar 2016 | View |
| EXTERNAL WORKS PROPOSALS MELVILLE STREET SHEET 1 OOther · PDF | 24 Mar 2016 | View |
| 1519 - NEW PIAZZA LANDSCAPING - PHASE 2 - AOther · PDF | 24 Mar 2016 | View |
| PROPOSED MASTERPLAN PEDESTRIAN MOVEMENTSOther · PDF | 24 Mar 2016 | View |
| EXTERNAL WORKS PROPOSALS NEW PIAZZA PHASE 1 WORKSOther · PDF | 24 Mar 2016 | View |
| VIEW FROM SINCIL STREET LOOKING SOUTH WESTOther · PDF | 24 Mar 2016 | View |
| GEO-ENVIRONMENTAL ASSESSMENT CD VERSION 290216Other · PDF | 24 Mar 2016 | View |
| OBJECTIVES REPAIR STREET FRONTAGES OXFORD STREET /Other · PDF | 24 Mar 2016 | View |
| EXTERNAL WORKS PROPOSALS TENTERCROFT STREET SURFACOther · PDF | 24 Mar 2016 | View |
| 1519 - OXFORD STREET LANDSCAPING - BOther · PDF | 24 Mar 2016 | View |
| PRELIMINARY MSCP PLANS LEVELS 1-4 PLANOther · PDF | 24 Mar 2016 | View |
| VIEW ON BRAYFORD WAY BRIDGE LOOKING EASTOther · PDF | 24 Mar 2016 | View |
| AIR QUALITY ASSESSMENT RESULTSOther · PDF | 24 Mar 2016 | View |
| VIEW ON ST MARY'S LOOKING SOUTH WESTOther · PDF | 24 Mar 2016 | View |
| MSCP PROPOSED SECTIONS SHEET 2 OF 2Other · PDF | 24 Mar 2016 | View |
| EXISTING SENSITIVE RECEPTORS LOCATORSOther · PDF | 24 Mar 2016 | View |
| ANALYSIS OF EXISTING PEDESTRIANISED AREASOther · PDF | 24 Mar 2016 | View |
| DEMOLITION PLAN UNDER CURTILAGE OF LISTED STRUCTUROther · PDF | 24 Mar 2016 | View |
| OBJECTIVES - TRAFFIC CALMING/PEDESTRIAN PRIORITY OOther · PDF | 24 Mar 2016 | View |
| EXTERNAL WORKS PROPOSALS PIAZZAOther · PDF | 24 Mar 2016 | View |
| 1519 - PLANTING SCHEDULE - 18-03-2016Other · PDF | 24 Mar 2016 | View |
| VIEW FROM SINCIL STREET LOOKING SOUTHOther · PDF | 24 Mar 2016 | View |
| ANALYSIS OF EXISTING VEHICULAR MOVEMENTSOther · PDF | 24 Mar 2016 | View |
| VIEW FROM NORMAN PLACE LOOKING WESTOther · PDF | 24 Mar 2016 | View |
| VIEW ON TENTERCROFT STREET LOOKING NORTHOther · PDF | 24 Mar 2016 | View |
| VIEW ON ST MARY'S LOOKING EASTOther · PDF | 24 Mar 2016 | View |
| EXISTING PLAN RAILWAY STATIONOther · PDF | 24 Mar 2016 | View |
| TRAFFIC FLOW INFORMATIONOther · PDF | 24 Mar 2016 | View |
| PROPOSED PLANS - 18-20 SINCIL STREET AND BLOCK A GOther · PDF | 24 Mar 2016 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.