Council planning record

Demolition of existing bus station buildings, existing pedestrian footbridge between St Marys Street and the Tentercroft Street car park, the single storey railway station store/outbuilding and the existing station footbridge connecting the platforms within Lincoln Central railway station. Erection of a new bus station, multi-storey public car park, new pedestrian footbridge over the railway connecting the areas north and south of the railway station as well as the platforms; surface car parking; two four storey buildings comprising 6250sqm of ground floor retailing with residential apartments over (Block A) and Offices (Block B) revised layout of roads and accesses; landscaping of the public realm (REVISED PLANS).

Land Bounded By Sincil Street, Waterside South, Melville Street, Tentercroft Street And High Street, Lincoln

DecidedReference: 2015/0498/FCity of Lincoln Council

Last published check: 10 Oct 2026, 21:17. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Actual Committee Date

    Published milestoneCouncil source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Full Application
Received
5 Jun 2015
Validated
17 Jun 2015
Determination deadline
8 Oct 2015
Local authority
City of Lincoln Council

Application overview

Demolition of existing bus station buildings, existing pedestrian footbridge between St Marys Street and the Tentercroft Street car park, the single storey railway station store/outbuilding and the existing station footbridge connecting the platforms within Lincoln Central railway station. Erection of a new bus station, multi-storey public car park, new pedestrian footbridge over the railway connecting the areas north and south of the railway station as well as the platforms; surface car parking; two four storey buildings comprising 6250sqm of ground floor retailing with residential apartments over (Block A) and Offices (Block B) revised layout of roads and accesses; landscaping of the public realm (REVISED PLANS).

Proposal details

Reference
2015/0498/F
Alternative references
PP-4252545
Ward
Abbey
Agent
Globe Consultants Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land Bounded By Sincil Street, Waterside South, Melville Street, Tentercroft Street And High Street, Lincoln

This record has no verified map location.

View council map

Documents 111 of 111

DocumentPublishedAction
DECISION NOTICEDecision Notice · PDF24 Nov 2015View
VISUALSCorrespondence28 Sept 2015View
APPENDIX C CONSTRUCTION PHASESOther · PDF16 Sept 2015View
PROPOSED ELEVATIONS IN CONTEXT MELVILLE ST/NORMANOther · PDF11 Sept 2015View
APPENDIX E COLOUR PLATESOther · PDF11 Sept 2015View
ROOF PLAN AND SECTIONS UNIT AOther · PDF11 Sept 2015View
BUS STATION GA PLAN GROUNDOther · PDF11 Sept 2015View
PROPOSED MASTERPLAN BARRIERS TO PEDESTRIAN MOVEMENOther · PDF11 Sept 2015View
BUS STATION GA SECTIONS DD_EEOther · PDF11 Sept 2015View
STAIRCASE 2 SECTIONSOther · PDF11 Sept 2015View
EXISTING STREET ELEVATIONS MELVILLE STREET/NORMANOther · PDF11 Sept 2015View
PROPOSED MSCP ENTRANCEOther · PDF11 Sept 2015View
PROPOSED MASTERPLAN PEDESTRIAN ZONESOther · PDF11 Sept 2015View
BUS STATION GA PLAN ROOFOther · PDF11 Sept 2015View
BUS STATION GA PLAN CLERESTORYOther · PDF11 Sept 2015View
GROUND FLOOR AND FIRST FLOOR LAYOUT UNIT AOther · PDF11 Sept 2015View
PROPOSED MASTERPLAN ROAD NETWORK FIGURE/GROUNDOther · PDF11 Sept 2015View
STAIRCASE 1 SECTIONSOther · PDF11 Sept 2015View
BRIDGE GA SECTIONSOther · PDF11 Sept 2015View
SITE LOCATION PLAN DEVELOPMENT SITE EXTENTSOther · PDF11 Sept 2015View
FIRST FLOOR LAYOUT UNIT BOther · PDF11 Sept 2015View
BUS STATION PLANNING ELEVATIONSOther · PDF11 Sept 2015View
GROUND FLOOR LAYOUT UNIT BOther · PDF11 Sept 2015View
BLOCK PLAN AS EXISTINGOther · PDF11 Sept 2015View
PROPOSED MASTERPLAN SOFT LANDSCAPEOther · PDF11 Sept 2015View
APPENDIX A SCREENING AND SCOPING REQUESTOther · PDF11 Sept 2015View
BUS STATION GA ELEVATIONSOther · PDF11 Sept 2015View
SECOND FLOOR LAYOUT UNIT BOther · PDF11 Sept 2015View
PROPOSED STREET SCENES UNITS A AND BOther · PDF11 Sept 2015View
STAIRCASE 4 SECTIONSOther · PDF11 Sept 2015View
BRIDGE PLANNING ELEVATIONSOther · PDF11 Sept 2015View
BRIDGE GA PLAN DECK LEVELOther · PDF11 Sept 2015View
APPENDIX B SCREENING AND SCOPING OPINIONOther · PDF11 Sept 2015View
REAR ELEVATIONS UNIT AOther · PDF11 Sept 2015View
PROPOSED SITE LAYOUT OPTION 18Other · PDF11 Sept 2015View
ELEVATIONS UNIT B SHEET 1Other · PDF11 Sept 2015View
THIRD FLOOR LAYOUT UNIT BOther · PDF11 Sept 2015View
BUS STATION GA SECTIONS AA_BBOther · PDF11 Sept 2015View
BRIDGE GA PLAN ROOF LEVELOther · PDF11 Sept 2015View
PROPOSED ELEVATIONS SOUTH AND EASTOther · PDF11 Sept 2015View
SECOND FLOOR AND THIRD FLOOR LAYOUT UNIT AOther · PDF11 Sept 2015View
PROPOSED KIOSK TO SW TOWER OF MSCPOther · PDF11 Sept 2015View
PROPOSED ELEVATIONS NORTH AND WESTOther · PDF11 Sept 2015View
ROOF LAYOUT UNIT BOther · PDF11 Sept 2015View
APPENDIX D LIST OF LHER ENTRIESOther · PDF11 Sept 2015View
BUS STATION GA SECTION CCOther · PDF11 Sept 2015View
PROPOSED MASTERPLAN PEDESTRIAN MOVEMENTSOther · PDF11 Sept 2015View
EXISTING TREES TO BE REMOVEDOther · PDF11 Sept 2015View
STAIRCASE 3 SECTIONSOther · PDF11 Sept 2015View
BRIDGE GA ELEVATIONSOther · PDF11 Sept 2015View
FRONT AND SIDE ELEVATIONS UNIT AOther · PDF11 Sept 2015View
BRIDGE GA PLAN PLATFORM LEVELOther · PDF11 Sept 2015View
PROPOSED MASTERPLAN VEHICULAR MOVEMENTSOther · PDF11 Sept 2015View
ELEVATIONS UNIT B SHEET 2Other · PDF11 Sept 2015View
APPENDIX H MAP OF CATHEDRAL AND CITY CENTRE CONSEROther · PDF10 Sept 2015View
APPENDIX P EA SCOPING RESPONSEOther · PDF10 Sept 2015View
APPENDIX M TRAVEL PLANOther · PDF10 Sept 2015View
APPENDIX S WIND ROSE FOR WADDINGTONOther · PDF10 Sept 2015View
APPENDIX I PLATESOther · PDF10 Sept 2015View
APPENDIX J EXTENDED PHASE 1 HABITAT SURVEYOther · PDF10 Sept 2015View
APPENDIX F SPECIFICATION FOR AN ARCHAEOLOGICAL EVAOther · PDF10 Sept 2015View
APPENDIX Q EXISTING SENSITIVE RECEPTORS LOCATIONSOther · PDF10 Sept 2015View
APPENDIX L TRANSPORT ASSESSMENTOther · PDF10 Sept 2015View
APPENDIX G HERITAGE DESIGNATION EXTRACTSOther · PDF10 Sept 2015View
APPENDIX R TRAFFIC FLOW INFORMATIONOther · PDF10 Sept 2015View
APPENDIX T MODEL VERIFICATION PROCEDUREOther · PDF10 Sept 2015View
APPENDIX Z PHASE 1 ENVIRONMENTAL SITE ASSESSMENTOther · PDF10 Sept 2015View
APPENDIX X SITE WASTE MANAGEMENT PLANOther · PDF10 Sept 2015View
APPENDIX W DRAWINGSOther · PDF10 Sept 2015View
APPENDIX N CONSTRUCTION TRAFFICOther · PDF10 Sept 2015View
APPENDIX U AIR QUALITY ASSESSMENT RESULTSOther · PDF10 Sept 2015View
APPENDIX Y WASTE REDUCTION AND BEST PRACTICE WASTEOther · PDF10 Sept 2015View
APPENDIX K ARBORICULTURAL SURVEY REPORTOther · PDF10 Sept 2015View
APPENDIX O CAPACITY ASSESSMENT MOVEMENTSOther · PDF10 Sept 2015View
APPENDIX V NOISE MONITORING RESULTSOther · PDF10 Sept 2015View
16.1 ENVIRONMENTAL SITE ASSESSMENT APPENDIX XOther · PDF6 Jul 2015View
SCHEME VISUALS - PROPOSED CG1'SOther · PDF19 Jun 2015View
PROPOSED ELEVATIONS IN CONTEXT MELVILLE ST/NORMANOther · PDF17 Jun 2015View
BS5837 TREE SURVEYOther · PDF17 Jun 2015View
SCHEME VISUALS MODELLEDOther · PDF17 Jun 2015View
HERITAGE IMPACT ASSESSMENTOther · PDF17 Jun 2015View
ANALYSIS OF EXISTING SOFT LANDSCAPEOther · PDF6 Jun 2015View
EXISTING ELEVATIONS BUS STATIONOther · PDF5 Jun 2015View
PROPOSED MASTERPLAN APPROVED LINDONGATEOther · PDF5 Jun 2015View
ANALYSIS OF EXISTING STREET FRONTAGES DEFINED/UNDEOther · PDF5 Jun 2015View
ANALYSIS OF EXISTING PEDESTRIAN DESIRE LINES FROMOther · PDF5 Jun 2015View
EXISTING ELEVATIONS RAILWAY PLATFORM BUILDINGOther · PDF5 Jun 2015View
DESIGN AND ACCESS STATEMENTOther · PDF5 Jun 2015View
PROPOSED PLINTH DESIGNS TO PUBLIC REALMOther · PDF5 Jun 2015View
TRAIN AND BUS STATION PIAZZAOther · PDF5 Jun 2015View
EXISTING PLAN RAILWAY STATIONOther · PDF5 Jun 2015View
ANALYSIS OF EXISTING BARRIERS TO PEDESTRIAN MOVEMEOther · PDF5 Jun 2015View
EXISTING BUS STATION PLANOther · PDF5 Jun 2015View
EXISTING ELEVATIONS RAILWAY STATION FRONTAGEOther · PDF5 Jun 2015View
PROPOSED DRAINAGEOther · PDF5 Jun 2015View
ANALYSIS OF EXISTING ROAD NETWORK FIGURE/GROUNDOther · PDF5 Jun 2015View
EXTERNAL WORKS PROPOSAL RAILWAY FORECOURTOther · PDF5 Jun 2015View
ANALYSIS OF EXISTING HISTORIC/LISTED PROPERTIESOther · PDF5 Jun 2015View
PROPOSED HIGHWAY GENERAL ARRANGEMENTOther · PDF5 Jun 2015View
EXISTING ELEVATIONS RAILWAY BOUNDARY WALLOther · PDF5 Jun 2015View
EXTERNAL WORKS PROPOSALS MELVILLE STREETOther · PDF5 Jun 2015View
ANALYSIS OF EXISTING VEHICULAR MOVEMENTSOther · PDF5 Jun 2015View
EXTERNAL WORKS PROPOSALS MELVILLE STREET SHEET 2 OOther · PDF5 Jun 2015View
ANALYSIS OF EXISTING LONG RANGE VIEWSOther · PDF5 Jun 2015View
ANALYSIS OF EXISTING PEDESTRIANISED AREASOther · PDF5 Jun 2015View
PROPOSED MASTERPLAN INTEGRATED TRANSPORT NODESOther · PDF5 Jun 2015View
EXTERNAL WORKS PROPOSAL TENTERCROFT STREET "POCKETOther · PDF5 Jun 2015View
ANALYSIS OF EXISTING PEDESTRIAN MOVEMENTSOther · PDF5 Jun 2015View
ANALYSIS OF EXISTING TRANSPORT NODESOther · PDF5 Jun 2015View
SITE LOCATION PLAN OVERALL DEMOLITION PLANOther · PDF5 Jun 2015View
FINAL DECISION F GRANTDecision Notice1 Jan 1900View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Granted Conditionally
DECISION NOTICE FINAL DECISION F GRANT
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.