Council planning record

Retention of pair of dwellings, construction of boundary structures, vehicular accesses, parking and other hard surfaced areas and engineering operations including works on the public highway, alteration of watercourse containment and alteration of land levels

Land adjacent to Brookland Terrace Nantymoel CF32 7SY

Under considerationReference: P/25/492/FULBridgend County Borough Council

Last published check: 15 Oct 2026, 09:18. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Expires

    Published milestoneCouncil source

Application summary

Status
Under consideration
Application type
Full Planning Application
Received
8 Aug 2025
Validated
23 Sept 2025
Determination deadline
Not published
Local authority
Bridgend County Borough Council

Application overview

Retention of pair of dwellings, construction of boundary structures, vehicular accesses, parking and other hard surfaced areas and engineering operations including works on the public highway, alteration of watercourse containment and alteration of land levels

Proposal details

Reference
P/25/492/FUL

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land adjacent to Brookland Terrace Nantymoel CF32 7SY

This record has no verified map location.

Documents 56 of 56

DocumentPublishedAction
PLA Response - 1003502_Final_ver1and1_Redline_ver1and1.pdfConsultation responses30 Sept 2026View
Email-P_25_492_FUL - Land adjacent to Brookland Terrace NANTYMOEL (Minor) - NRW Response NRW_05910818.msgConsultation responses11 Sept 2026View
Coal Authority Response 09-09-2026 153355637.pdfConsultation responses9 Sept 2026View
PLA0090309.docConsultation responses15 Oct 2025View
2517-100-L Drainage Layout.pdfPlans26 Aug 2026View
2517-102-A Section 104 Construction Details.pdfPlans26 Aug 2026View
2517-103-1-A Plot 1 SuDS Construction Details Sheet 1.pdfPlans26 Aug 2026View
2517-103-2-B Plot 1 SuDS Construction Details Sheet 2.pdfPlans26 Aug 2026View
2517-104-1-A Plot 2 SuDS Construction Details Sheet 1.pdfPlans26 Aug 2026View
2517-104-2-B Plot 2 SuDS Construction Details Sheet 2.pdfPlans26 Aug 2026View
2517-109-A Watercourse Sections.pdfPlans26 Aug 2026View
2517-110-H Highway Layout.pdfPlans26 Aug 2026View
2517-119 Access and Parking Layout.pdfPlans26 Aug 2026View
CCF20082026.pdfPlans20 Aug 2026View
CCF20082026_0001.pdfPlans20 Aug 2026View
CCF20082026_0002.pdfPlans20 Aug 2026View
CCF20082026_0003.pdfPlans20 Aug 2026View
CCF20082026_0004.pdfPlans20 Aug 2026View
CCF20082026_0005.pdfPlans20 Aug 2026View
CCF20082026_0006.pdfPlans20 Aug 2026View
CCF15062026_0002.pdfPlans15 Jun 2026View
2517-103-2-A Plot 1 SuDS Construction Details Sheet 2(2).pdfPlans23 Sept 2025View
2517-104-1 Plot 2 SuDS Construction Details Sheet 1(2).pdfPlans23 Sept 2025View
2517-112-B Highway Construction Details.pdfPlans26 Aug 2025View
2517-105 Pre Development Exceedance.pdfPlans26 Aug 2025View
2517-117-A Site Clearance.pdfPlans26 Aug 2025View
2517-116 Site Plans Overlay.pdfPlans26 Aug 2025View
2517-115-D Section 111 Agreement Plan.pdfPlans26 Aug 2025View
2517-114-B Vehicle Tracking.pdfPlans26 Aug 2025View
2517-113-B Access Visibility Layout.pdfPlans26 Aug 2025View
2517-111-A Existing Highway Layout.pdfPlans26 Aug 2025View
2517-110-F Highway Layout.pdfPlans26 Aug 2025View
2517-109 Watercourse Sections.pdfPlans26 Aug 2025View
2517-108 Construction Surface Water Management.pdfPlans26 Aug 2025View
2517-107 Site Location Plan.pdfPlans26 Aug 2025View
2517-106 Post Development Exceedance.pdfPlans26 Aug 2025View
2517-104-2-A Plot 2 SuDS Construction Details Sheet 2.pdfPlans26 Aug 2025View
2517-103-1 Plot 1 SuDS Construction Details Sheet 1.pdfPlans26 Aug 2025View
2517-102 Section 104 Construction Details.pdfPlans26 Aug 2025View
2517-101-B Section 104 Agreement.pdfPlans26 Aug 2025View
2517-100-H Engineering Layout.pdfPlans26 Aug 2025View
boundary and parapet detail.pdfPlans20 Aug 2025View
external works.pdfPlans20 Aug 2025View
front boundary wall.pdfPlans20 Aug 2025View
gabion basket detail.pdfPlans20 Aug 2025View
loc.pdfPlans8 Aug 2025View
plans.pdfPlans8 Aug 2025View
Redacted Notice No 1 under Art 10.pdfSubmission documents15 Jun 2026View
Redacted ownership Cert B dated 15.06.2026.pdfSubmission documents15 Jun 2026View
Site Notice_P25492FUL.docxSubmission documents25 Sept 2025View
SAB approval notice.pdfSubmission documents20 Aug 2025View
silt control.pdfSubmission documents20 Aug 2025View
Coal mining report.pdfSubmission documents20 Aug 2025View
gabion basket method statement.pdfSubmission documents20 Aug 2025View
FCA(1).pdfSubmission documents20 Aug 2025View
form - redacted.pdfSubmission documents8 Aug 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

-
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.