Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
HMP Parc Heol Hopcyn John Coity CF35 6AP
Last published check: 14 Oct 2026, 00:37. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Demolition and redevelopment within the existing secure compound and an extension to the secure compound to the southwest and east to include a new accommodation block, a replacement kitchen/dining block, a new gym/multifaith building, a new industries/education building and new visitor/staff entran...
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsHMP Parc Heol Hopcyn John Coity CF35 6AP
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| Decision Notice_P25417FUL.docxDecision | 29 Jan 2026 | View |
| Craig John_202601291542(1).pdfDecision | 29 Jan 2026 | View |
| Amendment Sheet 13 11 2025.docDecision | 13 Nov 2025 | View |
| 25.417.pdfDecision | 13 Nov 2025 | View |
| P.25.417.FUL.JH.docxConsultation responses | 4 Nov 2025 | View |
| Email-Request to Speak at Meeting on P_25_417_FUL.msgConsultation responses | 18 Sept 2025 | View |
| Email-Planning application consultation P_25_417_FUL HMP Parc Heol Hopcyn John Coity CF35 6AP.msgConsultation responses | 18 Aug 2025 | View |
| 1008aafc-6d57-11f0-a7b6-000000273616 EDIT.docConsultation responses | 4 Aug 2025 | View |
| No Direction Letter HMP Parc Heol Hopcyn John Coity.pdfConsultation responses | 29 Jul 2025 | View |
| CAS-284537-V3W3 - HMP Parc (V1).pdfConsultation responses | 29 Jul 2025 | View |
| Email-Cadw - P_25_417_FUL - 2025-07-18 - Demolition and redevelopment_ HMP Parc_ Heol Hopcyn John_ Coity_ CF35 6AP - Response (A58949509)(1).msgConsultation responses | 18 Jul 2025 | View |
| P25417FUL.docConsultation responses | 17 Jul 2025 | View |
| Email-RE_ Planning application consultation P_25_417_FUL HMP Parc Heol Hopcyn John Coity CF35 6AP.msgConsultation responses | 16 Jul 2025 | View |
| 786173_9559-PEV-106-XX-D-A-9010_Elevations Ext Planning Colour.pdfPlans | 4 Aug 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9000_Site-Location Plan-Existing-PLANNING_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-0304_PCS-Combined_(S3) Suitable for Review and Comment_P05.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-0405_VCS-Combined_(S3) Suitable for Review and Comment_P05.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-1101_Site-Demolition Plan-Proposed_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-1300_Site-Fencing Strategy-Proposed_(S3) Suitable for Review and Comment_P05.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9000_Site-Location Plan-Existing-PLANNING_(S3) Suitable for Review and Comment_P02(1).pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9001_Site-Block Plan-Existing-PLANNING_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9011_Site-Block Plan-Existing- North Parking - PLANNING_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9012_Site-Block Plan-Existing- West and South Parking - PLANNING_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9020_Site-Block Plan-Proposed-PLANNING_(S3) Suitable for Review and Comment_P03.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9021_Site-Block Plan-Car Park-Proposed-West-PLANNING_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9022_Site-Block Plan-Car Park-Proposed-East-PLANNING_(S3) Suitable for Review and Comment_P03.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9200_Site-Site Section AA,BB-Existing-PLANNING_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9201_Site-Site Section CC,DD-Existing-PLANNING_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9202_Site-Site Section EE,FF-Existing-PLANNING_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9210_Site-Site Section AA,BB-Proposed-PLANNING_(S3) Suitable for Review and Comment_P03.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9211_Site-Site Section CC,DD-Proposed-PLANNING_(S3) Suitable for Review and Comment_P03.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9212_Site-Site Section EE,FF-Proposed-PLANNING_(S3) Suitable for Review and Comment_P03.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9300_3D Visuals-Existing-PLANNING_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-A-9301_3D Visuals-Proposed-PLANNING_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-L-0302_Landscape Masterplan_(S3) Suitable for Review and Comment_P04_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-L-0401.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-L-0402.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-L-0403.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-L-0404.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-L-0405.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-L-0406.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-L-0407.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-L-0408.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-L-0408_Landscape Proposal Sheet 8_(S3) Suitable for Review and Comment_P02_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-L-0409.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-L-0410.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-D-L-0411.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0100_Existing Impermeable Area Plan_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0101_Proposed Impermeable Area Plan_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0501_Proposed Surface Water Drainage-Sheet 01_(S3) Suitable for Review and Comment_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0502_Proposed Surface Water Drainage-Sheet 02_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0503_Proposed Surface Water Drainage-Sheet 03_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0504_Proposed Surface Water Drainage-Sheet 04_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0505_Proposed Surface Water Drainage-Sheet 05_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0506_Proposed Surface Water Drainage-Sheet 06_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0507_Proposed Surface Water Drainage - Sheet 07_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0508_Proposed Surface Water Drainage - Sheet 08_(S4) Approval_P03_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0509_Proposed Surface Water Drainage - Sheet 09_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0510_Proposed Surface Water Drainage - Sheet 10_(S4) Approval_P03_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0511_Proposed Surface Water Drainage - Sheet 11_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0512_Proposed Surface Water Drainage - Sheet 12_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0513_Proposed Surface Water Drainage - Sheet 13_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0526_Proposed Foul Drainage-Sheet 01_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0527_Proposed Foul Drainage-Sheet 02_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0528_Proposed Foul Drainage-Sheet 03_(S4) Approval_P04_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0529_Proposed Foul Drainage-Sheet 04_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0530_Proposed Foul Drainage-Sheet 05_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0531_Proposed Foul Drainage-Sheet 06_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0532_Proposed Foul Drainage - Sheet 07_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0533_Proposed Foul Drainage - Sheet 08_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0534_Proposed Foul Drainage - Sheet 09_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0535_Proposed Foul Drainage - Sheet 10_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0545_Proposed Drainage Diversions Layout - Sheet 01_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0546_Proposed Drainage Diversions Layout - Sheet 02_(S4) Approval_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0700_Proposed Hard Landscape Layout-Sheet 01_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0701_Proposed Hard Landscape Layout-Sheet 02_(S4) Approval_P04_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0702_Proposed Hard Landscape Layout-Sheet 03_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0703_Proposed Kerb Layout -Sheet 01_(S4) Approval_P04_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-0704_Proposed Kerb Layout -Sheet 02_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-1100_Proposed Ground-Levels and Contours - Sheet 1_(S4) Approval_P04_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-1101_Proposed Ground-Levels and Contours - Sheet 2_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-1102_Proposed Ground-Levels and Contours - Sheet 03_(S4) Approval_P04_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-2700_Swept Path Analysis-Fire Tender_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-2701_Swept Path Analysis-Heavy Goods Vehicle_(S4) Approval_P03_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-2702_Swept Path Analysis - Electric Tug_(S4) Approval_P03_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-2703_Swept Path Analysis - Standard Design Vehicle_(S4) Approval_P03_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-2704_Swept Path Analysis - MEWP_(S4) Approval_P03_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-2705_Swept Path Analysis - 3.5 Tonne Lorry_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-6501_Drainage Details - Sheet 01_(S4) Approval_P03_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-6502_Drainage Details - Sheet 02_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-6503_Drainage Details - Sheet 03_(S4) Approval_P02_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-C-6700_Pavement Construction Details-Sheet 01_(S4) Approval_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-D-E-0609_External Lighting Lux Plot_(S4) Approval_P02_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0501_Proposed Surface Water Drainage-Schedule 01_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0502_Proposed Surface Water Drainage-Schedule 02_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0503_Proposed Surface Water Drainage-Schedule 03_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0504_Proposed Surface Water Drainage-Schedule 04_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0505_Proposed Surface Water Drainage-Schedule 05_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0506_Proposed Surface Water Drainage-Schedule 06_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0507_Proposed Surface Water Drainage - Schedule 07_(S4) Approval_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0509_Proposed Surface Water Drainage - Schedule 09_(S4) Approval_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0511_Proposed Surface Water Drainage - Schedule 11_(S4) Approval_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0512_Proposed Surface Water Drainage - Schedule 12_(S4) Approval_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0513_Proposed Surface Water Drainage - Schedule 13_(S4) Approval_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0526_Proposed Foul Drainage-Schedule 01_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0527_Proposed Foul Drainage-Schedule 02_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0528_Proposed Foul Drainage-Schedule 03_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0529_Proposed Foul Drainage-Schedule 04_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0530_Proposed Foul Drainage-Schedule 05_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0531_Proposed Foul Drainage-Schedule 06_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0532_Proposed Foul Drainage - Schedule 07_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0533_Proposed Foul Drainage - Schedule 08_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0534_Proposed Foul Drainage - Schedule 09_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-L-C-0535_Proposed Foul Drainage - Schedule 10_(S4) Approval_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-101-00-D-A-9001_Plan-Planning-L00(Ground)_(S3) Suitable for Review and Comment_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-101-01-D-A-9002_Plan-Planning-L01(First)_(S3) Suitable for Review and Comment_P02_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-101-02-D-A-9003_Plan-Planning-L02(Second)_(S3) Suitable for Review and Comment_P02_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-101-03-D-A-9004_Plan-Planning-L03(Plant)_(S3) Suitable for Review and Comment_P02_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-101-R3-D-A-9005_Plan-Planning-LR3(Roof)_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-101-XX-D-A-9100_GEA Plans (Gross External Area Plans)_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-101-XX-D-A-9101_GIA Plans (Gross Internal Area Plans)_(S3) Suitable for Review and Comment_P03_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-101-ZZ-D-A-9010_Elevations-Ext-Planning-Colour_(S3) Suitable for Review and Comment_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-101-ZZ-D-A-9011_Elevations-Ext-Planning-No colour_(S3) Suitable for Review and Comment_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-102-00-D-A-9001_Plan-Planning-L00(Ground)_(S3) Suitable for Review and Comment_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-102-01-D-A-9002_Plan-Planning-L01(First)_(S3) Suitable for Review and Comment_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-102-02-D-A-9003_Plan-Planning-L02(Second)_(S3) Suitable for Review and Comment_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-102-03-D-A-9004_Plan-Planning-L03(Plant)_(S3) Suitable for Review and Comment_P02_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-102-R3-D-A-9005_Plan-Planning-LR3(Roof)_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-102-XX-D-A-9010_Elevations-Ext-Planning-Colour_(S3) Suitable for Review and Comment_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-102-XX-D-A-9011_Elevations-Ext-Planning-No colour_(S3) Suitable for Review and Comment_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-102-ZZ-D-A-9100_GEA Plans (Gross External Area Plans)_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-102-ZZ-D-A-9101_GIA Plans (Gross Internal Area Plans)_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-103-00-D-A-9000_Plan-GA-Level 00(Ground Floor)-Proposed-Planning_(S3) Suitable for Review and Comment_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-103-01-D-A-9001_Plan-Planning-L01(First)-Proposed-Planning_(S3) Suitable for Review and Comment_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-103-02-D-A-9002_Plan-Planning-L02(Second)-Proposed-Planning_(S3) Suitable for Review and Comment_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-103-03-D-A-9003_Plan-Planning-L03(Third)-Proposed-Planning_(S3) Suitable for Review and Comment_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-103-R3-D-A-9004_Plan-Planning-LR3(Roof)-Proposed-Planning_(S3) Suitable for Review and Comment_P02_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-103-ZZ-D-A-9010_Elevation Ext-Proposed-Planning_(S3) Suitable for Review and Comment_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-103-ZZ-D-A-9011_Elevation Ext-Proposed-Planning-Sheet 2_(S3) Suitable for Review and Comment_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-103-ZZ-D-A-9100_GEA Plans-Proposed-PLANNING_(S4) Approval_P04_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-103-ZZ-D-A-9101_GIA Plans (Gross Internal Area Plans)-Proposed-Planning_(S4) Approval_P03_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-104-00-D-A-9000_Plan-Planning-L00(Ground)_(S3) Suitable for Review and Comment_P02_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-104-01-D-A-9001_Plan-Planning-L01(First)_(S3) Suitable for Review and Comment_P02_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-104-R1-D-A-9002_Plan-Planning-LR1(Roof)_(S3) Suitable for Review and Comment_P02_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-104-XX-D-A-9100_GEA Plans (Gross External Area Plans)_(S3) Suitable for Review and Comment_P03_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-104-XX-D-A-9101_GIA Plans (Gross Internal Area Plans)_(S3) Suitable for Review and Comment_P03_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-104-ZZ-D-A-9010_Elevations-Ext-Planning-Colour_(S3) Suitable for Review and Comment_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-104-ZZ-D-A-9011_Elevations-Ext-Planning-No colour_(S3) Suitable for Review and Comment_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-105-00-D-A-9000_Plan-Planning-L00(Ground)_(S3) Suitable for Review and Comment_P02_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-105-01-D-A-9001_Plan-Planning-L01(First)_(S3) Suitable for Review and Comment_P02_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-105-M1-D-A-9002_Plan-Planning-LM1(Mezzanine)_(S3) Suitable for Review and Comment_P02_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-105-R1-D-A-9003_Plan-Planning-LR1(Roof)_(S3) Suitable for Review and Comment_P02_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-105-XX-D-A-9100_GEA Plans (Gross External Area Plans)_(S3) Suitable for Review and Comment_P03_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-105-XX-D-A-9101_GIA Plans (Gross Internal Area Plans)_(S3) Suitable for Review and Comment_P03_0.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-105-ZZ-D-A-9010_Elevations-Ext-Planning-Colour_(S3) Suitable for Review and Comment_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-105-ZZ-D-A-9011_Elevations-Ext-Planning-No colour_(S3) Suitable for Review and Comment_P03_1.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-106-00-D-A-9001_Plan-Planning-L00(Ground)_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-106-01-D-A-9002_Plan-Planning-L01(First)_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-106-02-D-A-9003_Plan-Planning-L02(Second)_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-106-R2-D-A-9004_Plan-Planning-LR2(Roof)_(S3) Suitable for Review and Comment_P02.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-106-ZZ-D-A-9011_Elevations Ext Planning No Colour_(S3) Suitable for Review and Comment_P01.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-106-ZZ-D-A-9100_GEA Plans (Gross External Area Plans)_(S3) Suitable for Review and Comment_P03.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-106-ZZ-D-A-9101_GIA Plans (Gross Internal Area Plans)_(S3) Suitable for Review and Comment_P03.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-FED-000-XX-D-X-0020_Tree Survey Plan_(S3) Suitable for Review and Comment_P01.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-FED-000-XX-D-X-0021_Tree Retention Plan_(S3) Suitable for Review and Comment_P01.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-FED-000-XX-D-X-0022_Tree Protection Plan_(S3) Suitable for Review and Comment_P01.pdfPlans | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-T-Z-0011_Part-1.pdfSubmission documents | 4 Aug 2025 | View |
| 786173_9559-PEV-000-XX-T-Z-0011_Part-2.pdfSubmission documents | 4 Aug 2025 | View |
| 786173_9559-PEV-000-XX-T-Z-0011_Part-3.pdfSubmission documents | 4 Aug 2025 | View |
| 786173_9559-PEV-000-XX-T-Z-0012-P03 Ground Investigation Report_Part-1.pdfSubmission documents | 4 Aug 2025 | View |
| 786173_9559-PEV-000-XX-T-Z-0012-P03 Ground Investigation Report_Part-2.pdfSubmission documents | 4 Aug 2025 | View |
| image0.jpegSubmission documents | 28 Jul 2025 | View |
| Site Notice_P25417FUL.docxSubmission documents | 18 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-T-A-0020_Design and Access Statement-PLANNING_(S3) Suitable for Review and Comment_P03(1).pdfSubmission documents | 9 Jul 2025 | View |
| ApplicationFormRedacted.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-T-L-1503_Green Infrastructure Statement_(S3) Suitable for Review and Comment_P03.pdfSubmission documents | 9 Jul 2025 | View |
| 65960_01 Planning Statement 20_06_2025.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-FED-000-XX-T-X-0010_Ecological Impact Assessment Report (ECIA)_(S3) Suitable for Review and Comment_P02.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-FED-000-XX-T-X-0013_Shadow Habitat Regulations Assessment_(S3) Suitable for Review and Comment_P02.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-FED-000-XX-T-X-0015_Landscape and Ecological Management Plan (LEMP)_(S3) Suitable for Review and Comment_P01.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-FED-000-XX-T-X-0023_Arboricultural Impact Assessment & Arboricultural Method Statement_(S3) Suitable for Review and Comment_P01.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-HYD-000-XX-T-YA-1000_Baseline Noise Survey_(S2) Suitable for Information_P01.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-HYD-000-XX-T-YA-1001_Noise Impact Assessment_(S2) Suitable for Information_P01.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-T-C-0003_Sustainable Drainage Strategy Report_(S3) Suitable for Review and Comment_P03.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-T-C-0004_Foul Drainage Strategy Report_(S3) Suitable for Review and Comment_P02.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-T-E-0006_External Lighting Assessment And Strategy_(S4) Approval_P03.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-T-L-1501_Landscape and Visual Appraisal_(S3) Suitable for Review and Comment_P03.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-T-L-1503_Green Infrastructure Statement_(S3) Suitable for Review and Comment_P03(1).pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-T-O-5000_Energy Statement_(S4) Approval_P03.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-PEV-000-XX-T-Z-0006_Flood Consequence Assessment_(S3) Suitable for Review and Comment_P02.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-T-A-0002_Archaeological Desk - Based and Impact Assessment_(S2) Suitable for Information_P02.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-T-D-0001_Transport Assessment_(S3) Suitable for Review and Comment_P04.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-T-D-0002_Travel Plan_(S4) Approval_P03.pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-PEV-000-ZZ-T-D-0003_Technical Note# PAC Comments Feedback_(S3) Suitable for Review and Comment_P01.pdfSubmission documents | 9 Jul 2025 | View |
| 65960_01 HMP Parc PAC Report 02.06.2025(1).pdfSubmission documents | 9 Jul 2025 | View |
| 65960_01 Planning Statement 20_06_2025(33905349.1).pdfSubmission documents | 9 Jul 2025 | View |
| 786173_9559-FED-000-XX-T-X-0010_Ecological Impact Assessment Report (ECIA)_(S3) Suitable for Review and Comment_P01.pdfSubmission documents | 9 Jul 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.