Council planning record

Development of a green hydrogen production facility with electrolysers, hydrogen storage, hydrogen refuelling station, admin building, substation and back-up generator; with access, circulation, parking, lighting, 8-metre-high wall, security fencing, hard and soft landscaping, and drainage infrastru...

Land at Brynmenyn and Bryncethin Bridgend

DecidedReference: P/23/218/FULBridgend County Borough Council

Last published check: 27 Sept 2026, 19:50. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Expires

    Published milestoneCouncil source
  4. Decision Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
Full Planning Application
Received
30 Mar 2023
Validated
13 Apr 2023
Determination deadline
Not published
Local authority
Bridgend County Borough Council

Application overview

Development of a green hydrogen production facility with electrolysers, hydrogen storage, hydrogen refuelling station, admin building, substation and back-up generator; with access, circulation, parking, lighting, 8-metre-high wall, security fencing, hard and soft landscaping, and drainage infrastru...

Proposal details

Reference
P/23/218/FUL

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land at Brynmenyn and Bryncethin Bridgend

This record has no verified map location.

Documents 216 of 216

DocumentPublishedAction
Decision Notice_P23218FUL(1)(1).docxDecision20 Aug 2025View
DC 23 218.pdfDecision11 Apr 2025View
P 23 218 FUL.pdfDecision14 Feb 2025View
(Public Pack)Agenda Document for Development Control Committee, 17_10_2024 14_00.pdfDecision10 Oct 2024View
23 218 (Public Pack)Agenda Document for Development Control Committee, 04_04_2024 10_00.pdfDecision26 Mar 2024View
P 23 218 FUL Updated Highway Comments.pdfConsultation responses11 Feb 2025View
BR13 01Q-15040 1.10.2024.pdfConsultation responses8 Oct 2024View
Email-RE_ 23_218 - HyBont - Marubeni hydrogen production facility - land at Brynmenyn and Bryncethin.msgConsultation responses3 Oct 2024View
Email-FW_ P_23_218_FUL Land at Brynmenyn and Bryncethin - HyBont (Noise)(1).msgConsultation responses23 Sept 2024View
Email-RE_ Planning application consultation P_23_218_FUL Land at Brynmenyn and Bryncethin Bridgend.msgConsultation responses20 Sept 2024View
Email-FW_ FOA_ Phil Thomas - Further Objection to Planning Application P_23_218_FUL - Development of .msgConsultation responses12 Sept 2024View
CAS-262794-J3R2 - Land at Brynmenyn and Bryncethin Bridgend (V6).pdfConsultation responses6 Sept 2024View
Dispatched - P 23 218 FUL 2ND RECONSULTATION - TCA Response.pdfConsultation responses4 Sept 2024View
Email-FW_ Planning application consultation P_23_218_FUL Land at Brynmenyn and Bryncethin Bridgend.msgConsultation responses4 Sept 2024View
BRI0561 Land at Brynmenyn and Bryncethin P 23 218.pdfConsultation responses2 Sept 2024View
Email-FW_ Comment for planning application P_23_218_FUL.msgConsultation responses27 Aug 2024View
Dwr Cymru Obs Part1.docConsultation responses27 Aug 2024View
Dwr Cymru Obs Part2.pdfConsultation responses27 Aug 2024View
Dwr Cymru Obs Part3.docxConsultation responses27 Aug 2024View
Dwr Cymru Obs Part3.pdfConsultation responses27 Aug 2024View
P 23 218 FUL SRS Comments on CMS.msgConsultation responses25 Aug 2024View
NRW Observations(1).pdfConsultation responses15 May 2024View
SRS Noise Observations.msgConsultation responses11 Apr 2024View
P 23 218 FUL HSE Response .msgConsultation responses13 Mar 2024View
P 23 218 FUL SRS Air Quality.docConsultation responses13 Mar 2024View
P 23 218 FUL Updated SRS (Noise) Comments.msgConsultation responses13 Mar 2024View
GGAT P 23 218 FUL .pdfConsultation responses8 Mar 2024View
P 23 218 FUL Draft Highway Comments.msgConsultation responses29 Feb 2024View
P 23 218 FUL SRS Env latest obs.docConsultation responses29 Feb 2024View
P 23 218 FUL SRS Latest Comments.pdfConsultation responses29 Feb 2024View
P 23 218 FUL NRW Revised Obs Land at Brynmenyn and Bryncethin (Major) (V4).pdfConsultation responses2 Feb 2024View
P 23 218 FUL SRS Noise latest observations.msgConsultation responses2 Feb 2024View
P 23 218 FUL NRW Observations.pdfConsultation responses19 Dec 2023View
P 23 218 FUL NRW comments.pdfConsultation responses28 Sept 2023View
BCBC Structual Engineer comments.msgConsultation responses12 Sept 2023View
The Coal Authority Updated Obs.docxConsultation responses7 Sept 2023View
Land Drainage comments(1).msgConsultation responses5 Sept 2023View
NRW observations.pdfConsultation responses13 Jul 2023View
HSE Land Use Planning Advice Team.msgConsultation responses21 Jun 2023View
07 06 23 SRS Noise Observations .msgConsultation responses7 Jun 2023View
BRI0561 Land at Brynmenyn and Bryncethin Jun 23 P#23#218.pdfConsultation responses1 Jun 2023View
Land Drainage Comments.msgConsultation responses31 May 2023View
Natural Resources Wales Observations.msgConsultation responses31 May 2023View
St Brides Minor Community Council.msgConsultation responses26 May 2023View
Health and Safety Executive Response.msgConsultation responses22 May 2023View
Dwr Cymru Welsh Water Observations.docConsultation responses18 May 2023View
The Coal Authority observations.docxConsultation responses18 May 2023View
South Wales Police.docxConsultation responses12 May 2023View
P 23 218 FUL SRS Environment Observations.docConsultation responses4 May 2023View
P 23 218 FUL Comments from Structural Engineer BCBC.msgConsultation responses2 May 2023View
HyBont Transport Statement Addendum.pdfSubmission documents3 Jan 2025View
Clean - JAJ03178-REPT-01-R3_Brigend Green Hydrogen Scheme_006_20240916 SCU.pdfSubmission documents18 Sept 2024View
Site Notice_P23218FUL(1).docxSubmission documents21 Aug 2024View
794-PLN-LAN-4535_172_HyBont Green Hydrogen Project_LVIA Addendum_V2.pdfSubmission documents12 Aug 2024View
240807 R JER9769 HyBont CEMP V1 R2 Issue.pdfSubmission documents12 Aug 2024View
ENV-ACO-03178-005_Brigend Green Hydrogen Scheme_001_240326_Report.pdfSubmission documents12 Aug 2024View
JSL4535_710 Tree Protection_ Removal Plans 710-716.pdfSubmission documents12 Aug 2024View
JSL4535_751 Tree Removal Schedule.pdfSubmission documents12 Aug 2024View
Solar -Noise Report JAJ03178-REPT-02-R2 20240717(1).pdfSubmission documents12 Aug 2024View
1454_DrgReg_240528.pdfSubmission documents2 Jun 2024View
Updated Technical Note Noise.msgSubmission documents28 May 2024View
Green Infrastructure Statement.pdfSubmission documents31 Mar 2024View
Briefing Note Private Wire Line.msgSubmission documents31 Mar 2024View
Add info Re Access Gradient inc plans section etc.msgSubmission documents31 Mar 2024View
Solar Landscape Strategy JSL4535_100D Landscape Strategy.pdfSubmission documents31 Mar 2024View
JSL4535_751A Tree Removal Schedule.pdfSubmission documents8 Mar 2024View
JAC29211 Hy Bont_DBA_Final with Welsh summaryr.pdfSubmission documents6 Mar 2024View
Noise tables and mitigation.pdfSubmission documents15 Feb 2024View
P 23 218 FUL Noise Mitigation.msgSubmission documents30 Nov 2023View
HyBont EcIA.pdfSubmission documents24 Nov 2023View
231115 ECO02994 HyBont Shadow HRA.pdfSubmission documents16 Nov 2023View
C282 D2 v1 Hybont fungi survey 2023.pdfSubmission documents16 Nov 2023View
P 23 218 FUL BRIDGEND HPF_P04_101123_Proposal.pdfSubmission documents15 Nov 2023View
P 23 218 FUL BSB14513-RPS-XX-XX-DR-E-6301-P03- External Lighting with background.pdfSubmission documents15 Nov 2023View
231106 ECO02994 HyBont dormouse report.pdfSubmission documents7 Nov 2023View
231106 ECO02994 HyBont otter report.pdfSubmission documents7 Nov 2023View
Email with reports and update from Agent.msgSubmission documents7 Nov 2023View
Email with update from Agent.msgSubmission documents7 Nov 2023View
Hybont Breeding Birds report.pdfSubmission documents7 Nov 2023View
HyBont Grassland Fungi Survey – Interim Results.pdfSubmission documents7 Nov 2023View
HyBont great crested newt report.pdfSubmission documents7 Nov 2023View
HyBont ground inspection of trees report.pdfSubmission documents7 Nov 2023View
HyBont inverterbrate surveys.pdfSubmission documents7 Nov 2023View
HyBont reptile report.pdfSubmission documents7 Nov 2023View
108939-MMD-BRGR-XX-RP-C-0099 P01 Brynmenyn Hydrogen Site - Ground Investigation Report(1).pdfSubmission documents31 Aug 2023View
108939-MMD-BRGR-XX-RP-C-0100 Bryncethin - Ground Investigation Report P01(1).pdfSubmission documents31 Aug 2023View
01_ESP.8353.3839. Ground Investigation Report Hydrogen Plant.pdfSubmission documents24 Aug 2023View
01_ESP.8354.3856. Ground Investigation Report Solar Farm.pdfSubmission documents24 Aug 2023View
02_ESP.8353.3839.Brynmenyn - Figures.pdfSubmission documents24 Aug 2023View
02_ESP.8354.3856.Bryncethin - Figures.pdfSubmission documents24 Aug 2023View
03_ESP.8353.3839.Brynmenyn - Appendices.pdfSubmission documents24 Aug 2023View
03_ESP.8354.3856.Bryncethin - Appendices.pdfSubmission documents24 Aug 2023View
Updated Flood Consequence Assessment.pdfSubmission documents21 Aug 2023View
Updated Flood Consequence Assessment(1).pdfSubmission documents21 Aug 2023View
Climate Change Statement_Rev3_Final Issue_June 23.pdfSubmission documents27 Jun 2023View
Hybont National Vegetation Classification plan.pdfSubmission documents20 Jun 2023View
Hybont vegetation survey 2023.pdfSubmission documents20 Jun 2023View
Bryncethin Solar Site Noise Impact Assessment.pdfSubmission documents6 Jun 2023View
Site Notice_P23218FUL.docxSubmission documents12 May 2023View
Glamorgan Star 4-5-23.pdfSubmission documents4 May 2023View
Planning Design & Access Statement.pdfSubmission documents30 Mar 2023View
ApplicationFormRedacted.pdfSubmission documents30 Mar 2023View
Air Quality Assessment.pdfSubmission documents30 Mar 2023View
Bryncethin Phase 1 Geo Environmental Study.pdfSubmission documents30 Mar 2023View
Bryncethin UXO Report.pdfSubmission documents30 Mar 2023View
Brynmenyn Phase 1 Geo Environmental Study.pdfSubmission documents30 Mar 2023View
Brynmenyn UXO Report.pdfSubmission documents30 Mar 2023View
Coal Mining Risk Assessment.pdfSubmission documents30 Mar 2023View
Construction Environmental Management Plan.pdfSubmission documents30 Mar 2023View
Drainage Strategy Report.pdfSubmission documents30 Mar 2023View
Eye Level Visualisation - Hydrogen Production Facility.jpgSubmission documents30 Mar 2023View
Flood Consequences Assessment.pdfSubmission documents30 Mar 2023View
Landscape & Visual Impact Assessment (part 1 of 2).pdfSubmission documents30 Mar 2023View
Landscape & Visual Impact Assessment (part 2 of 2).pdfSubmission documents30 Mar 2023View
Noise Impact Assessment.pdfSubmission documents30 Mar 2023View
Pre-Application Consultation (PAC) Report.pdfSubmission documents30 Mar 2023View
Preliminary Ecological Appraisal.pdfSubmission documents30 Mar 2023View
Transport Statement.pdfSubmission documents30 Mar 2023View
Utilities & Emissions Summary.pdfSubmission documents30 Mar 2023View
Visualisation - Hydrogen Production Facility.jpgSubmission documents30 Mar 2023View
1454_PL100_B_Proposed Site Layout.pdfPlans16 Dec 2024View
1454_PL101_C_Proposed Site Layout.pdfPlans16 Dec 2024View
9c14ed8d-a6f4-45f5-9679-71ab62010522(1).jpgPlans12 Aug 2024View
Eye Level_01_240528(1).jpgPlans12 Aug 2024View
Aerial 01 EXISTING(1).JPGPlans12 Aug 2024View
1454_IL001_A_Proposed Fencing Layout.pdfPlans2 Jun 2024View
1454_IL003_A_Fence, Gate, Fire Wall & Barrier Details.pdfPlans2 Jun 2024View
1454_PL110_A_Admin & DNO Switchroom - Ground Floor & Roof Plan.pdfPlans2 Jun 2024View
1454_PL111_A_HV & LV Substation - Ground Floor & Roof Plan.pdfPlans2 Jun 2024View
1454_PL200_A_Existing Site Sections A-A & B-B.pdfPlans2 Jun 2024View
1454_PL201_B_Proposed Site Sections A-A & B-B.pdfPlans2 Jun 2024View
1454_PL300_A_Proposed Site Elevations N&E.pdfPlans2 Jun 2024View
1454_PL301_A_Proposed Site Elevations S&W&W_SubstationOmitted.pdfPlans2 Jun 2024View
1454_PL302_A_Proposed Site Elevations X-X & Y-Y.pdfPlans2 Jun 2024View
1454_PL303_A_Proposed Site Elevations Z-Z From A4065.pdfPlans2 Jun 2024View
1454_PL304_Proposed Site Elevations X-X & Y-Y_FoliageYear1.pdfPlans2 Jun 2024View
1454_PL305_Proposed Site Elevations Z-Z From A4065_FoliageYear1.pdfPlans2 Jun 2024View
1454_PL306_Proposed Site Elevations X-X & Y-Y_FoliageYear5.pdfPlans2 Jun 2024View
1454_PL307_Proposed Site Elevations Z-Z From A4065_FoliageYear5.pdfPlans2 Jun 2024View
1454_PL308_Proposed Site Elevations X-X & Y-Y_FoliageYear15.pdfPlans2 Jun 2024View
1454_PL309_Proposed Site Elevations Z-Z From A4065_FoliageYear15.pdfPlans2 Jun 2024View
1454_PL400_A_Admin & DNO Switchroom Elevations & Sections.pdfPlans2 Jun 2024View
1454_PL401_NEL Electrolyser & Rectifier Elevations & Roof Plan.pdfPlans2 Jun 2024View
1454_PL403_A_Metering Container Elevations & Roof Plan.pdfPlans2 Jun 2024View
1454_PL404_A_MP Hydrogen Storage Elevations & Roof Plan.pdfPlans2 Jun 2024View
1454_PL406_A_MP1000 Compressor Elevations & Roof Plan.pdfPlans2 Jun 2024View
1454_PL407_A_Canopy & Pump Elevations & Plans.pdfPlans2 Jun 2024View
1454_PL408_A_Fire Water Tank Elevations & Roof Plan.pdfPlans2 Jun 2024View
1454_PL409_A_Pump House Elevations & Roof Plan.pdfPlans2 Jun 2024View
1454_PL412_A_Nitrogen Cylinder & Air Compressor Elevations & Roof Plan.pdfPlans2 Jun 2024View
1454_PL413_A_HV & LV Substation Elevations & Sections.pdfPlans2 Jun 2024View
1454_PL414_Reciprocating Compressor Elevations & Roof Plan.pdfPlans2 Jun 2024View
Aerial 01 EXISTING.JPGPlans2 Jun 2024View
Aerial_01_240528.jpgPlans2 Jun 2024View
Eye Level_01_240528.jpgPlans2 Jun 2024View
1454_PL100_A_Proposed Site Layout.pdfPlans2 Jun 2024View
1454_PL101_B_Proposed Site Layout.pdfPlans2 Jun 2024View
C5384-C-0743-PA - Existing Surface Water Falls.pdfPlans21 Apr 2024View
C5384-C-0744-PA - Proposed Surface Water Falls.pdfPlans21 Apr 2024View
1454_PL302_ProposedSiteElevationsX-X&Y-Y.pdfPlans21 Apr 2024View
1454_PL201_A_Proposed Site Sections A-A & B-B.pdfPlans21 Apr 2024View
18 04 24 C5384-C-0743-PA - Existing Surface Water Falls.pdfPlans18 Apr 2024View
18 04 24 C5384-C-0744-PA - Proposed Surface Water Falls.pdfPlans18 Apr 2024View
108939-MMD-BRGR-XX-DR-E-0014_PO6_(670Wp).pdfPlans23 Mar 2024View
JSL4535_100D Landscape Strategy.pdfPlans23 Mar 2024View
JSL4535_101D Landscape Strategy.pdfPlans8 Mar 2024View
External Lighting Report.pdfPlans7 Nov 2023View
Hydrogen Production Facility LOCATION Plan.pdfPlans30 Mar 2023View
Private Wire LOCATION Plan.pdfPlans30 Mar 2023View
Solar PV LOCATIONPlan.pdfPlans30 Mar 2023View
1454_IL002_Lighting Design - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_IL004_Materials & Colours - Hydrogen Production Facility.pdfPlans30 Mar 2023View
108939-MMD-BRGR-XX-DR-C-0098 - Fence (solar).pdfPlans30 Mar 2023View
108939-MMD-BRGR-XX-DR-E-0091_SolarPVlayoutCrossSection.pdfPlans30 Mar 2023View
108939-MMD-BRGR-XX-DR-E-0094 - Inverter (solar).pdfPlans30 Mar 2023View
108939-MMD-BRGR-XX-DR-E-0095 - Transformer (solar).PDFPlans30 Mar 2023View
108939-MMD-BRGR-XX-DR-E-0096 - Control building (solar).PDFPlans30 Mar 2023View
108939-MMD-BRGR-XX-DR-E-0097 - CCTV (solar).pdfPlans30 Mar 2023View
Energy Flow Schematic.pdfPlans30 Mar 2023View
Hydrogen Production Facility Drainage Layout.pdfPlans30 Mar 2023View
Hydrogen Production Facility Earthworks.pdfPlans30 Mar 2023View
Landscape Strategy Layout Solar.pdfPlans30 Mar 2023View
Landscape Strategy Layout.pdfPlans30 Mar 2023View
Private Wire Route.pdfPlans30 Mar 2023View
Solar PV Drainage Layout.pdfPlans30 Mar 2023View
Tree Constraints Plan.pdfPlans30 Mar 2023View
Tree Survey Schedule.pdfPlans30 Mar 2023View
Utility Map and Private Wire Option.pdfPlans30 Mar 2023View
1454_IL001_Proposed Fencing Layout - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_IL003_Fence, Gate, Fire Wall & Barrier Details - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL101_Proposed Site Layout - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL101_Proposed Site Layout.pdfPlans30 Mar 2023View
1454_PL110_Admin Ground Floor & Roof Plan - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL111_Substation Ground Floor & Roof Plan - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL200_Existing Site Sections A-A & B-B - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL201_Proposed Site Sections A-A & B-B - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL300_Proposed SiteElevations N & E - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL301_ProposedSiteElevationsS&W&W_SubstationOmitted - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL400_Admin Elevations & Sections - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL401_Electrolyser Elevations & Roof Plan - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL402_Rectifier Elevations & Roof Plan - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL403_Heat Exchanger & Meter Elevations & Roof Plan - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL404_Hydrogen Storage Tank Elevations & Roof Plan - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL405_Hydrogen Storage Container Elevations & Roof Plan - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL406_Compressor Chiller Elevations & Roof Plan - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL407_Canopy & Pump - Elevations & Plans - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL408_Fire Water Tank Elevations & Roof Plan - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL409_Pump House Elevations & Roof Plan - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL410_Effluent Tanks & Pumping Station Elevations & Roof Plan - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL411_Demin Chemical Tanks & Pumping Station Elevations & Roof Plan - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL412_Nitrogen Cylinder & Nitrogen Compressor Elevations & Roof Plan - Hydrogen Production Facility.pdfPlans30 Mar 2023View
1454_PL413_Substation Elevations & Sections - Hydrogen Production Facility.pdfPlans30 Mar 2023View
108939-MMD-BRGR-XX-DR-E-0014_Solar Layout.pdfPlans30 Mar 2023View
Tree Protection Removal Plans.pdfPlans30 Mar 2023View
Tree Removal Schedule.pdfPlans30 Mar 2023View
From Welsh Government Doc 012 - 01-06-23 - Holding Direction.pdfPlanning documents1 Jun 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Conditional Consent
Decision Notice_P23218FUL(1)(1).docx DC 23 218.pdf P 23 218 FUL.pdf (Public Pack)Agenda Document for Development Control Committee, 17_10_2024 14_00.pdf 23 218 (Public Pack)Agenda Document for Development Control Committee, 04_04_2024 10_00.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.