Council planning record

Demolition of the curtilage listed Gun Shop and Long Shed buildings and internal and external repairs and alterations to the Grade II* listed Whist House including: • full roof and external tile hanging renewal; • replacement of concrete floors and dilapidated timber floor areas at ground floor level with breathable limecrete, and the addition of a pamment floor and associated modifications to historic stair and panelling; • removal of failing render and the repair/restoration of brickwork, plinths and quoins; • repair and renewal of failed lath and plaster walls and ceilings; • joinery repairs and modifications as scheduled including upgrading and replacement of doors and windows; • alterations to internal openings, partitions and the addition of glazed screens; • new tile hung and glazed lift addition to south elevation with 4 no. new associated new openings; • demolitions of west garden walls; • removal of modern external slabs and new brick plinths to existing columns where ground level reduced.

Whist House, Tannery Lane , Ashford, Kent. TN23 1PL

Under ConsultationReference: PA/2026/0965Ashford Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received Date

    Published milestoneCouncil source
  2. Valid Date

    Published milestoneCouncil source
  3. Site Notice Date

    Published milestoneCouncil source
  4. Consultation Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Latest Decision Date (Calculated)

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Under Consultation
Application type
Listed building consent (Alt/Ext)
Received
29 May 2026
Validated
19 Jun 2026
Determination deadline
14 Aug 2026
Local authority
Ashford Borough Council

Application overview

Demolition of the curtilage listed Gun Shop and Long Shed buildings and internal and external repairs and alterations to the Grade II* listed Whist House including: • full roof and external tile hanging renewal; • replacement of concrete floors and dilapidated timber floor areas at ground floor level with breathable limecrete, and the addition of a pamment floor and associated modifications to historic stair and panelling; • removal of failing render and the repair/restoration of brickwork, plinths and quoins; • repair and renewal of failed lath and plaster walls and ceilings; • joinery repairs and modifications as scheduled including upgrading and replacement of doors and windows; • alterations to internal openings, partitions and the addition of glazed screens; • new tile hung and glazed lift addition to south elevation with 4 no. new associated new openings; • demolitions of west garden walls; • removal of modern external slabs and new brick plinths to existing columns where ground level reduced.

Proposal details

Reference
PA/2026/0965
Ward
Victoria
Parish
Central Ashford
Agent
Emma Hawkes

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Whist House, Tannery Lane , Ashford, Kent. TN23 1PL

This record has no verified map location.

Documents 183 of 183

DocumentPublishedAction
SITE PLAN AS PROPOSED - WHSTPR01Plan · PDF29 May 2026View
Statement Of Community InvolvementSupporting Documents · PDF19 Jun 2026View
PROPOSED _ FLOOR PLAN AND ROOF PLAN - WHPR03Plan · PDF29 May 2026View
SITE PLAN AS PROPOSED - WHSTPR01Plan · PDF29 May 2026View
Block B First Floor Plan - TANL01-ONA-BB-01-DR-A 0201 P02Plan · PDF29 May 2026View
Site Wide Combined External M&E Services Layout (Option 1) - TANL01-HAW-00-ZZ-DR-CS-6701 P02Plan · PDF29 May 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A4 P4Supporting Documents · PDF29 May 2026View
Block D Section AA - TANL01-ONA-BD-SE-DR-A 0400 P01Plan · PDF29 May 2026View
Block A Fifth Floor Plan - TANL01-ONA-BA-05-DR-A 0205 P02Plan · PDF29 May 2026View
Drawing Issue Sheet - 260419 TANL01-ONA-ZZ-XX-SH-A-9000Plan · PDF29 May 2026View
Landscape Visual AssessmentSupporting Documents · PDF29 May 2026View
Light Spill - SK-03Plan · PDF29 May 2026View
Block A Third Floor Plan - TANL01-ONA-BA-03-DR-A 0203 P02Plan · PDF29 May 2026View
Assessment of ViewpointsSupporting Documents · PDF29 May 2026View
Preliminary Ecological AppraisalSupporting Documents · PDF29 May 2026View
Block B Sixth Floor Plan - P02Plan · PDF29 May 2026View
Block C Roof Plan - TANL01-ONA-BC-RO-DR-A 0207 P02Plan · PDF29 May 2026View
Block D West Elevation - P02Plan · PDF29 May 2026View
SITE PLAN A SPROPOSED - WHSTPR01Plan · PDF29 May 2026View
Application FormApplication Form · PDF15 Jun 2026View
Block D Second Floor Plan - TANL01-ONA-BD-02-DR-A 0202 P02Plan · PDF29 May 2026View
Proposed Site Block Plan - TANL01-ONA-ZZ-XX-DR-A-0020 P02Plan · PDF29 May 2026View
SECTIONS 3 AND 4 AS PROPOSED - WHPR07Plan · PDF29 May 2026View
DRAWING REGISTER P3 - All Drawings ( As Existing, As Proposed, As Proposed with Demolition, demolition)Supporting Documents · PDF29 May 2026View
Block C South Elevation - TANL01-ONA-BC-EL-DR-A 0302 P02Plan · PDF29 May 2026View
Archaeological Desk-Based Assessment Part 2Supporting Documents · PDF29 May 2026View
Financial Viability Assessment - TANL01-DHA-XX-XX-AS-PL-0001_36249Supporting Documents · PDF15 Jun 2026View
Landscape Masterplan Part 1Supporting Documents · PDF29 May 2026View
BNG RCA Metric (Workbook Version).xlsxSupporting Documents29 May 2026View
Structural Survey - Tanyard - Long BuildingSupporting Documents · PDF29 May 2026View
SITE PLAN AS EXISTING 1 - WHSTEX01Plan · PDF29 May 2026View
DEMOLITION FLOOR PLANS - WHDM02Plan · PDF29 May 2026View
Design and Access Statement PART 04.Supporting Documents · PDF29 May 2026View
Ecological Work LetterSupporting Documents · PDF29 May 2026View
Climate Mitigation StatementSupporting Documents · PDF29 May 2026View
Site Layout Plan First Floor Plan - TANL01-ONA-ZZ-01-DR-A 0101 P03Plan · PDF29 May 2026View
Biodiversity Net Gain and River Condition AssessmentSupporting Documents · PDF29 May 2026View
Block C Third Floor Plan - TANL01-ONA-BC-03-DR-A 0203 P02Plan · PDF29 May 2026View
Block A First Floor Plan - TANL01-ONA-BA-01-DR-A 0201 P02Plan · PDF29 May 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A 3 Site Sensitivity MapsSupporting Documents · PDF29 May 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A2 P3Supporting Documents · PDF29 May 2026View
Flood Risk Assessment and Drainage Strategy - Part 1Supporting Documents · PDF29 May 2026View
Advert - Press NotificationOther · PDF26 Jun 2026View
SECTIONS 1 AND 2 AS PROPOSED - WHPR06Plan · PDF29 May 2026View
Overheating Risk AssessmentSupporting Documents · PDF29 May 2026View
SECTIONS 5 AND 6 AS PROPOSED - WHPR08Plan · PDF29 May 2026View
Elevations - Former Shop (fire damaged) - 1Plan · PDF29 Apr 2026View
DEMOLITION ELEVATIONS - WHDM05Plan · PDF29 May 2026View
Block C Section BB - TANL01-ONA-BC-SE-DR-A 0401 P01Plan · PDF29 May 2026View
Block C Fourth Floor Plan - TANL01-ONA-BC-04-DR-A 0204 P02Plan · PDF29 May 2026View
Block B West Elevation - TANL01-ONA-BB-EL-DR-A 0303 P03Plan · PDF29 May 2026View
Mechanical and Electrical Building Services Stage 2 ReportSupporting Documents · PDF29 May 2026View
Easement Plan - TANL01-ONA-ZZ-XX-DR-A-0030 P01Plan · PDF29 May 2026View
Landscape and Visual Appraisal opt_S5-S6.pdfSupporting Documents · PDF29 May 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A4 P2Supporting Documents · PDF29 May 2026View
Pre-Application advice 2024 (08/01/2025)Supporting Documents · PDF8 Jan 2025View
Landscape and Visual Appraisal opt_S7.pdfSupporting Documents · PDF29 May 2026View
Existing Section Plan - 168895-FAH-XX-XX-DR-S-7001-P05Plan · PDF23 Jun 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - APPENDIX ASupporting Documents · PDF29 May 2026View
Site Location Plan - TANL01-ONA-ZZ-XX-DR-A 0001 P01Plan · PDF29 May 2026View
Asbestos Refurbishment SurveySupporting Documents · PDF29 May 2026View
EXISTING ELEVATIONS 1 - WHEX04Plan · PDF29 May 2026View
EXISTING SECTIONS 3 AND 4 - WHEX07Plan · PDF29 May 2026View
Block B Fifth Floor Plan - TANL01-ONA-BB-05-DR-A 0205 P02Plan · PDF29 May 2026View
DEMOLITION ELEVATIONS - WHDM04Plan · PDF29 May 2026View
ELEVATIONS AS PROPOSED - WHPR05Plan · PDF29 May 2026View
Structural Survey - Whist House - Figures 10 -52Supporting Documents · PDF29 May 2026View
Landscape and Visual Appraisal opt_S8 part2.pdfSupporting Documents · PDF29 May 2026View
Block B Second Floor Plan - TANL01-ONA-BB-02-DR-A 0202 P02Plan · PDF29 May 2026View
Block D South Elevation - TANL01-ONA-BD-EL-DR-A 0302 P02Plan · PDF29 May 2026View
Block B Third Floor Plan - TANL01-ONA-BB-03-DR-A 0203 P02Plan · PDF29 May 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix B 1 PhotographsSupporting Documents · PDF29 May 2026View
Existing Site Block Plan - TANL01-ONA-ZZ-XX-DR-A 0010 P02Plan · PDF29 May 2026View
Block B Roof Plan - TANL01-ONA-BB-RO-DR-A 0207 P02Plan · PDF29 May 2026View
Block C Second Floor Plan - TANL01-ONA-BC-02-DR-A - 0202 P02Plan · PDF29 May 2026View
Heritage Impact AssessmentSupporting Documents · PDF15 Jun 2026View
Block C East Elevation - TANL01-ONA-BC-EL-DR-A 0301 P02Plan · PDF29 May 2026View
Landscape Masterplan Part 4Plan · PDF29 May 2026View
Block D Ground Floor Plan - TANL01-ONA-BD-00-DR-A 0200 P02Plan · PDF29 May 2026View
Transport AssessmentSupporting Documents · PDF29 May 2026View
Pre- Application Advice 2025 (22/01/2025)Supporting Documents · PDF22 Jan 2025View
Block D Section BB - TANL01-ONA-BD-SE-DR-A - 0401 P01Plan · PDF29 May 2026View
River Corridor Survey & River Condition AssessmentSupporting Documents · PDF29 May 2026View
Block B East Elevation - TANL01-ONA-BB-EL-DR-A 0301 P02Plan · PDF29 May 2026View
Archaeological Desk-Based Assessment Appendix - Appendix 1: Proposed Development PlanSupporting Documents · PDF29 May 2026View
BNG Pre Dev Condition Assessment metricSupporting Documents29 May 2026View
DEMOLITION FLOOR PLAN AND ROOF PLAN - WHDM03Plan · PDF29 May 2026View
Whist House Schedule of Repair and Intervention Works Rev P3Supporting Documents · PDF29 May 2026View
Block C Section AA - TANL01-ONA-BC-SE-DR-A 0400 P01Plan · PDF29 May 2026View
Structural Survey - Whist HouseSupporting Documents · PDF17 Jun 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A4 P5Supporting Documents · PDF29 May 2026View
Planning StatementSupporting Documents · PDF29 May 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINALSupporting Documents · PDF29 May 2026View
Design and Access Statement - Part 3Supporting Documents · PDF29 May 2026View
Site Layout Plan Roof Plan - TANL01-ONA-ZZ-RO-DR-A 0107 P03Plan · PDF29 May 2026View
ELEVATIONS AS PROPOSED - WHPR04Plan · PDF29 May 2026View
ELEVATIONS AS PROPOSED (WITH DEMO) - WHPR04Plan · PDF29 May 2026View
Block C Ground Floor Plan - TANL01-ONA-BC-00-DR-A 0200 P02Plan · PDF29 May 2026View
Fire Safety StrategySupporting Documents · PDF29 May 2026View
Block B North Elevation - TANL01-ONA-BB-EL-DR-A - 0300 P03Plan · PDF29 May 2026View
Block C Fifth Floor Plan - TANL01-ONA-BC-05-DR-A 0205 P02Plan · PDF29 May 2026View
Block A East Elevation - TANL01-ONA-BA-EL-DR-A 0301 P02Plan · PDF29 May 2026View
Arboricultural Impact Assessment, Method Statement and Tree Protection PlanSupporting Documents · PDF29 May 2026View
Block A Sixth Floor Plan - TANL01-ONA-BA-06-DR-A 0206 P02Plan · PDF29 May 2026View
SECTIONS 5 AND 6 AS PROPOSED (WITH DEMO) WHPR08Plan · PDF29 May 2026View
Block B Section BB - TANL01-ONA-BB-SE-DR-A 0401 P01Plan · PDF29 May 2026View
BNG - Post Dev Condition AssessmentsSupporting Documents29 May 2026View
Block A Fourth Floor Plan - TANL01-ONA-BA-04-DR-A 0204 P02Plan · PDF29 May 2026View
SECTIONS 1 AND 2 AS EXISTING1 - WHEX06Plan · PDF29 May 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A3 P2Plan · PDF29 May 2026View
DEMOLITION FLOOR PLAN - WHDM01Plan · PDF29 May 2026View
Block C West Elevation - TANL01-ONA-BC-EL-DR-A 0303 P02Plan · PDF29 May 2026View
Bat Emergence Activity Survey ReportSupporting Documents · PDF29 May 2026View
Parking Survey Transport Technical NoteSupporting Documents · PDF29 May 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A2 P2Supporting Documents · PDF29 May 2026View
Block B South Elevation - TANL01-ONA-BB-EL-DR-A 0302 P02Plan · PDF29 May 2026View
Assessed Scheme of Lighting - SK-02Plan · PDF29 May 2026View
Block B Fourth Floor Plan - TANL01-ONA-BB-04-DR-A 0204 P02Plan · PDF29 May 2026View
Block A Roof Plan - TANL01-ONA-BA-RO-DR-A 0207 P02Plan · PDF29 May 2026View
SECTIONS 3 AND 4 AS PROPOSED - WHPR07Plan · PDF29 May 2026View
Block A South Elevation - TANL01-ONA-BA-EL-DR-A 0302 P02Plan · PDF29 May 2026View
Full Appendix (1)Supporting Documents · PDF29 May 2026View
Block C Sixth Floor Plan - TANL01-ONA-BC-06-DR-A 0206 P02Plan · PDF29 May 2026View
Block D First Floor Plan - TANL01-ONA-BD-01-DR-A 0201 P02Plan · PDF29 May 2026View
Block D North Elevation - TANL01-ONA-BD-EL-DR-A 0300 P02Plan · PDF29 May 2026View
Landscape Masterplan - Part 2Supporting Documents · PDF29 May 2026View
FLOOR PLANS AS EXISTING - WHEX01Plan · PDF29 May 2026View
Proposed Section Plan - 168895-FAH-XX-XX-DR-S-7002-P05Plan · PDF23 Jun 2026View
FLOOR PLAN AS PROPOSED - WHPR01Plan · PDF29 May 2026View
Residential Receptor Location Plan - SK-01Plan · PDF29 May 2026View
Block A Section AA - TANL01-ONA-BA-SE-DR-A 0400 P01Plan · PDF29 May 2026View
ELEVATIONS AS PROPOSED - WHPR05Plan · PDF29 May 2026View
Landscape and Visual Appraisal opt_S8 part 1Supporting Documents · PDF29 May 2026View
Structural Survey - Tanyard – Gun ShopSupporting Documents · PDF29 May 2026View
Interim Travel PlanSupporting Documents · PDF29 May 2026View
Archaeological Desk-Based Assessment - Part 1Supporting Documents · PDF29 May 2026View
Block A West Elevation - TANL01-ONA-BA-EL-DR-A 0303 P02Plan · PDF29 May 2026View
Site Layout Plan Ground Floor Plan - TANL01-ONA-ZZ-00-DR-A 0100 P04Plan · PDF29 May 2026View
Assessment for the Provisional Daylight and Sunlight AssessmentSupporting Documents · PDF29 May 2026View
FLOOR PLANS AS PROPOSED - WHPR02Plan · PDF29 May 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL- Appendix A4 P6Supporting Documents · PDF29 May 2026View
Historic England RedactedSupport Comment · PDF30 Jul 2026View
Block D Roof Plan - TANL01-ONA-BD-RO-DR-A 0207 P02Plan · PDF29 May 2026View
Landscape and Visual Appraisal opt_S3.pdfSupporting Documents · PDF29 May 2026View
Block B Section AA - TANL01-ONA-BB-SE-DR-A 0400 P01Plan · PDF29 May 2026View
Block D Fourth Floor Plan - TANL01-ONA-BD-04-DR-A 0204 P02Plan · PDF29 May 2026View
Block C First Floor Plan - TANL01-ONA-BC-01-DR-A 0201 P02Plan · PDF29 May 2026View
Block D Fifth Floor Plan - TANL01-ONA-BD-05-DR-A 0205 P02Plan · PDF29 May 2026View
Landscape StrategyPlan · PDF29 May 2026View
Lighting AssessmentSupporting Documents · PDF29 May 2026View
FLOOR PLANS AS EXISTING - WHEX02Plan · PDF29 May 2026View
FLOOR PLAN AS PROPOSED (WITH DEMO) - WHPR01Plan · PDF29 May 2026View
FLOOR PLAN AND ROOF PLAN AS PROPOSED (WITH DEMO) - WHPR03Plan · PDF29 May 2026View
Design and Access Statement - Part 5Supporting Documents · PDF15 Jun 2026View
Landscape Masterplan - Part 3Plan · PDF29 May 2026View
Site Layout Plan Second Floor Plan - TANL01-ONA-ZZ-02-DR-A 0102 P02Plan · PDF29 May 2026View
Existing Elevations - Shed (adjacent to the Great Stour) - 2Plan · PDF2 Jun 2026View
Block A Second Floor Plan - TANL01-ONA-BA-02-DR-A 0202 P02Plan · PDF29 May 2026View
Flood Risk Assessment and Drainage Strategy - Part 2Supporting Documents · PDF29 May 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A2 P4Supporting Documents · PDF29 May 2026View
Noise AssessmentSupporting Documents · PDF29 May 2026View
Nutrient Neutrality Assessment and MitigationSupporting Documents · PDF29 May 2026View
SECTIONS 1 AND 2 AS PROPOSED (WITH DEMO) - WHPR06Plan · PDF29 May 2026View
Block C North Elevation - TANL01-ONA-BC-EL-DR-A 0300 P02Plan · PDF29 May 2026View
DRAWING ISSUE SHEETS REV 00 - TANL01-HAW-XX-XX-SH-Z-0001Supporting Documents · PDF29 May 2026View
ELEVATIONS AS EXISTING 2 - WHEX05Plan · PDF29 May 2026View
Block B Ground Floor Plan - TANL01-ONA-BB-00-DR-A 0200 P02Plan · PDF29 May 2026View
Block A Ground Floor Plan - TANL01-ONA-BA-00-DR-A 0200 P02Plan · PDF29 May 2026View
FLOOR PLANS AS PROPOSED (WITH DEMO) - WHPR02Plan · PDF29 May 2026View
Block A Section BB - TANL01-ONA-BA-SE-DR-A 0401 P02Plan · PDF29 May 2026View
FLOOR PLAN AND ROOF PLAN AS EXISTING - WHEX03Plan · PDF29 May 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A2 P3Supporting Documents · PDF29 May 2026View
Block A North Elevation - TANL01-ONA-BA-EL-DR-A 0300 P02Plan · PDF29 May 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL FIGURESSupporting Documents · PDF29 May 2026View
Design and Access Statement - Part 2Supporting Documents · PDF29 May 2026View
Design and Access Statement - Part 1Supporting Documents · PDF29 May 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A2 P1Supporting Documents · PDF29 May 2026View
Block D Third Floor Plan - TANL01-ONA-BD-03-DR-A 0203 P02Plan · PDF29 May 2026View
Block D East Elevation TANL01-ONA-BD-EL-DR-A 0301 P02Plan · PDF29 May 2026View
Block D Sixth Floor Plan - TANL01-ONA-BD-06-DR-A 0206 P02Plan · PDF29 May 2026View
SECTIONS 5 AND 6 AS EXISTING - WHEX08Plan · PDF29 May 2026View
PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A4 P1Plan · PDF29 May 2026View
Air Quality AssessmentSupporting Documents · PDF29 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.