Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Whist House, Tannery Lane , Ashford, Kent. TN23 1PL
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceDemolition of the curtilage listed Gun Shop and Long Shed buildings and internal and external repairs and alterations to the Grade II* listed Whist House including: • full roof and external tile hanging renewal; • replacement of concrete floors and dilapidated timber floor areas at ground floor level with breathable limecrete, and the addition of a pamment floor and associated modifications to historic stair and panelling; • removal of failing render and the repair/restoration of brickwork, plinths and quoins; • repair and renewal of failed lath and plaster walls and ceilings; • joinery repairs and modifications as scheduled including upgrading and replacement of doors and windows; • alterations to internal openings, partitions and the addition of glazed screens; • new tile hung and glazed lift addition to south elevation with 4 no. new associated new openings; • demolitions of west garden walls; • removal of modern external slabs and new brick plinths to existing columns where ground level reduced.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsWhist House, Tannery Lane , Ashford, Kent. TN23 1PL
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| SITE PLAN AS PROPOSED - WHSTPR01Plan · PDF | 29 May 2026 | View |
| Statement Of Community InvolvementSupporting Documents · PDF | 19 Jun 2026 | View |
| PROPOSED _ FLOOR PLAN AND ROOF PLAN - WHPR03Plan · PDF | 29 May 2026 | View |
| SITE PLAN AS PROPOSED - WHSTPR01Plan · PDF | 29 May 2026 | View |
| Block B First Floor Plan - TANL01-ONA-BB-01-DR-A 0201 P02Plan · PDF | 29 May 2026 | View |
| Site Wide Combined External M&E Services Layout (Option 1) - TANL01-HAW-00-ZZ-DR-CS-6701 P02Plan · PDF | 29 May 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A4 P4Supporting Documents · PDF | 29 May 2026 | View |
| Block D Section AA - TANL01-ONA-BD-SE-DR-A 0400 P01Plan · PDF | 29 May 2026 | View |
| Block A Fifth Floor Plan - TANL01-ONA-BA-05-DR-A 0205 P02Plan · PDF | 29 May 2026 | View |
| Drawing Issue Sheet - 260419 TANL01-ONA-ZZ-XX-SH-A-9000Plan · PDF | 29 May 2026 | View |
| Landscape Visual AssessmentSupporting Documents · PDF | 29 May 2026 | View |
| Light Spill - SK-03Plan · PDF | 29 May 2026 | View |
| Block A Third Floor Plan - TANL01-ONA-BA-03-DR-A 0203 P02Plan · PDF | 29 May 2026 | View |
| Assessment of ViewpointsSupporting Documents · PDF | 29 May 2026 | View |
| Preliminary Ecological AppraisalSupporting Documents · PDF | 29 May 2026 | View |
| Block B Sixth Floor Plan - P02Plan · PDF | 29 May 2026 | View |
| Block C Roof Plan - TANL01-ONA-BC-RO-DR-A 0207 P02Plan · PDF | 29 May 2026 | View |
| Block D West Elevation - P02Plan · PDF | 29 May 2026 | View |
| SITE PLAN A SPROPOSED - WHSTPR01Plan · PDF | 29 May 2026 | View |
| Application FormApplication Form · PDF | 15 Jun 2026 | View |
| Block D Second Floor Plan - TANL01-ONA-BD-02-DR-A 0202 P02Plan · PDF | 29 May 2026 | View |
| Proposed Site Block Plan - TANL01-ONA-ZZ-XX-DR-A-0020 P02Plan · PDF | 29 May 2026 | View |
| SECTIONS 3 AND 4 AS PROPOSED - WHPR07Plan · PDF | 29 May 2026 | View |
| DRAWING REGISTER P3 - All Drawings ( As Existing, As Proposed, As Proposed with Demolition, demolition)Supporting Documents · PDF | 29 May 2026 | View |
| Block C South Elevation - TANL01-ONA-BC-EL-DR-A 0302 P02Plan · PDF | 29 May 2026 | View |
| Archaeological Desk-Based Assessment Part 2Supporting Documents · PDF | 29 May 2026 | View |
| Financial Viability Assessment - TANL01-DHA-XX-XX-AS-PL-0001_36249Supporting Documents · PDF | 15 Jun 2026 | View |
| Landscape Masterplan Part 1Supporting Documents · PDF | 29 May 2026 | View |
| BNG RCA Metric (Workbook Version).xlsxSupporting Documents | 29 May 2026 | View |
| Structural Survey - Tanyard - Long BuildingSupporting Documents · PDF | 29 May 2026 | View |
| SITE PLAN AS EXISTING 1 - WHSTEX01Plan · PDF | 29 May 2026 | View |
| DEMOLITION FLOOR PLANS - WHDM02Plan · PDF | 29 May 2026 | View |
| Design and Access Statement PART 04.Supporting Documents · PDF | 29 May 2026 | View |
| Ecological Work LetterSupporting Documents · PDF | 29 May 2026 | View |
| Climate Mitigation StatementSupporting Documents · PDF | 29 May 2026 | View |
| Site Layout Plan First Floor Plan - TANL01-ONA-ZZ-01-DR-A 0101 P03Plan · PDF | 29 May 2026 | View |
| Biodiversity Net Gain and River Condition AssessmentSupporting Documents · PDF | 29 May 2026 | View |
| Block C Third Floor Plan - TANL01-ONA-BC-03-DR-A 0203 P02Plan · PDF | 29 May 2026 | View |
| Block A First Floor Plan - TANL01-ONA-BA-01-DR-A 0201 P02Plan · PDF | 29 May 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A 3 Site Sensitivity MapsSupporting Documents · PDF | 29 May 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A2 P3Supporting Documents · PDF | 29 May 2026 | View |
| Flood Risk Assessment and Drainage Strategy - Part 1Supporting Documents · PDF | 29 May 2026 | View |
| Advert - Press NotificationOther · PDF | 26 Jun 2026 | View |
| SECTIONS 1 AND 2 AS PROPOSED - WHPR06Plan · PDF | 29 May 2026 | View |
| Overheating Risk AssessmentSupporting Documents · PDF | 29 May 2026 | View |
| SECTIONS 5 AND 6 AS PROPOSED - WHPR08Plan · PDF | 29 May 2026 | View |
| Elevations - Former Shop (fire damaged) - 1Plan · PDF | 29 Apr 2026 | View |
| DEMOLITION ELEVATIONS - WHDM05Plan · PDF | 29 May 2026 | View |
| Block C Section BB - TANL01-ONA-BC-SE-DR-A 0401 P01Plan · PDF | 29 May 2026 | View |
| Block C Fourth Floor Plan - TANL01-ONA-BC-04-DR-A 0204 P02Plan · PDF | 29 May 2026 | View |
| Block B West Elevation - TANL01-ONA-BB-EL-DR-A 0303 P03Plan · PDF | 29 May 2026 | View |
| Mechanical and Electrical Building Services Stage 2 ReportSupporting Documents · PDF | 29 May 2026 | View |
| Easement Plan - TANL01-ONA-ZZ-XX-DR-A-0030 P01Plan · PDF | 29 May 2026 | View |
| Landscape and Visual Appraisal opt_S5-S6.pdfSupporting Documents · PDF | 29 May 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A4 P2Supporting Documents · PDF | 29 May 2026 | View |
| Pre-Application advice 2024 (08/01/2025)Supporting Documents · PDF | 8 Jan 2025 | View |
| Landscape and Visual Appraisal opt_S7.pdfSupporting Documents · PDF | 29 May 2026 | View |
| Existing Section Plan - 168895-FAH-XX-XX-DR-S-7001-P05Plan · PDF | 23 Jun 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - APPENDIX ASupporting Documents · PDF | 29 May 2026 | View |
| Site Location Plan - TANL01-ONA-ZZ-XX-DR-A 0001 P01Plan · PDF | 29 May 2026 | View |
| Asbestos Refurbishment SurveySupporting Documents · PDF | 29 May 2026 | View |
| EXISTING ELEVATIONS 1 - WHEX04Plan · PDF | 29 May 2026 | View |
| EXISTING SECTIONS 3 AND 4 - WHEX07Plan · PDF | 29 May 2026 | View |
| Block B Fifth Floor Plan - TANL01-ONA-BB-05-DR-A 0205 P02Plan · PDF | 29 May 2026 | View |
| DEMOLITION ELEVATIONS - WHDM04Plan · PDF | 29 May 2026 | View |
| ELEVATIONS AS PROPOSED - WHPR05Plan · PDF | 29 May 2026 | View |
| Structural Survey - Whist House - Figures 10 -52Supporting Documents · PDF | 29 May 2026 | View |
| Landscape and Visual Appraisal opt_S8 part2.pdfSupporting Documents · PDF | 29 May 2026 | View |
| Block B Second Floor Plan - TANL01-ONA-BB-02-DR-A 0202 P02Plan · PDF | 29 May 2026 | View |
| Block D South Elevation - TANL01-ONA-BD-EL-DR-A 0302 P02Plan · PDF | 29 May 2026 | View |
| Block B Third Floor Plan - TANL01-ONA-BB-03-DR-A 0203 P02Plan · PDF | 29 May 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix B 1 PhotographsSupporting Documents · PDF | 29 May 2026 | View |
| Existing Site Block Plan - TANL01-ONA-ZZ-XX-DR-A 0010 P02Plan · PDF | 29 May 2026 | View |
| Block B Roof Plan - TANL01-ONA-BB-RO-DR-A 0207 P02Plan · PDF | 29 May 2026 | View |
| Block C Second Floor Plan - TANL01-ONA-BC-02-DR-A - 0202 P02Plan · PDF | 29 May 2026 | View |
| Heritage Impact AssessmentSupporting Documents · PDF | 15 Jun 2026 | View |
| Block C East Elevation - TANL01-ONA-BC-EL-DR-A 0301 P02Plan · PDF | 29 May 2026 | View |
| Landscape Masterplan Part 4Plan · PDF | 29 May 2026 | View |
| Block D Ground Floor Plan - TANL01-ONA-BD-00-DR-A 0200 P02Plan · PDF | 29 May 2026 | View |
| Transport AssessmentSupporting Documents · PDF | 29 May 2026 | View |
| Pre- Application Advice 2025 (22/01/2025)Supporting Documents · PDF | 22 Jan 2025 | View |
| Block D Section BB - TANL01-ONA-BD-SE-DR-A - 0401 P01Plan · PDF | 29 May 2026 | View |
| River Corridor Survey & River Condition AssessmentSupporting Documents · PDF | 29 May 2026 | View |
| Block B East Elevation - TANL01-ONA-BB-EL-DR-A 0301 P02Plan · PDF | 29 May 2026 | View |
| Archaeological Desk-Based Assessment Appendix - Appendix 1: Proposed Development PlanSupporting Documents · PDF | 29 May 2026 | View |
| BNG Pre Dev Condition Assessment metricSupporting Documents | 29 May 2026 | View |
| DEMOLITION FLOOR PLAN AND ROOF PLAN - WHDM03Plan · PDF | 29 May 2026 | View |
| Whist House Schedule of Repair and Intervention Works Rev P3Supporting Documents · PDF | 29 May 2026 | View |
| Block C Section AA - TANL01-ONA-BC-SE-DR-A 0400 P01Plan · PDF | 29 May 2026 | View |
| Structural Survey - Whist HouseSupporting Documents · PDF | 17 Jun 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A4 P5Supporting Documents · PDF | 29 May 2026 | View |
| Planning StatementSupporting Documents · PDF | 29 May 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINALSupporting Documents · PDF | 29 May 2026 | View |
| Design and Access Statement - Part 3Supporting Documents · PDF | 29 May 2026 | View |
| Site Layout Plan Roof Plan - TANL01-ONA-ZZ-RO-DR-A 0107 P03Plan · PDF | 29 May 2026 | View |
| ELEVATIONS AS PROPOSED - WHPR04Plan · PDF | 29 May 2026 | View |
| ELEVATIONS AS PROPOSED (WITH DEMO) - WHPR04Plan · PDF | 29 May 2026 | View |
| Block C Ground Floor Plan - TANL01-ONA-BC-00-DR-A 0200 P02Plan · PDF | 29 May 2026 | View |
| Fire Safety StrategySupporting Documents · PDF | 29 May 2026 | View |
| Block B North Elevation - TANL01-ONA-BB-EL-DR-A - 0300 P03Plan · PDF | 29 May 2026 | View |
| Block C Fifth Floor Plan - TANL01-ONA-BC-05-DR-A 0205 P02Plan · PDF | 29 May 2026 | View |
| Block A East Elevation - TANL01-ONA-BA-EL-DR-A 0301 P02Plan · PDF | 29 May 2026 | View |
| Arboricultural Impact Assessment, Method Statement and Tree Protection PlanSupporting Documents · PDF | 29 May 2026 | View |
| Block A Sixth Floor Plan - TANL01-ONA-BA-06-DR-A 0206 P02Plan · PDF | 29 May 2026 | View |
| SECTIONS 5 AND 6 AS PROPOSED (WITH DEMO) WHPR08Plan · PDF | 29 May 2026 | View |
| Block B Section BB - TANL01-ONA-BB-SE-DR-A 0401 P01Plan · PDF | 29 May 2026 | View |
| BNG - Post Dev Condition AssessmentsSupporting Documents | 29 May 2026 | View |
| Block A Fourth Floor Plan - TANL01-ONA-BA-04-DR-A 0204 P02Plan · PDF | 29 May 2026 | View |
| SECTIONS 1 AND 2 AS EXISTING1 - WHEX06Plan · PDF | 29 May 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A3 P2Plan · PDF | 29 May 2026 | View |
| DEMOLITION FLOOR PLAN - WHDM01Plan · PDF | 29 May 2026 | View |
| Block C West Elevation - TANL01-ONA-BC-EL-DR-A 0303 P02Plan · PDF | 29 May 2026 | View |
| Bat Emergence Activity Survey ReportSupporting Documents · PDF | 29 May 2026 | View |
| Parking Survey Transport Technical NoteSupporting Documents · PDF | 29 May 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A2 P2Supporting Documents · PDF | 29 May 2026 | View |
| Block B South Elevation - TANL01-ONA-BB-EL-DR-A 0302 P02Plan · PDF | 29 May 2026 | View |
| Assessed Scheme of Lighting - SK-02Plan · PDF | 29 May 2026 | View |
| Block B Fourth Floor Plan - TANL01-ONA-BB-04-DR-A 0204 P02Plan · PDF | 29 May 2026 | View |
| Block A Roof Plan - TANL01-ONA-BA-RO-DR-A 0207 P02Plan · PDF | 29 May 2026 | View |
| SECTIONS 3 AND 4 AS PROPOSED - WHPR07Plan · PDF | 29 May 2026 | View |
| Block A South Elevation - TANL01-ONA-BA-EL-DR-A 0302 P02Plan · PDF | 29 May 2026 | View |
| Full Appendix (1)Supporting Documents · PDF | 29 May 2026 | View |
| Block C Sixth Floor Plan - TANL01-ONA-BC-06-DR-A 0206 P02Plan · PDF | 29 May 2026 | View |
| Block D First Floor Plan - TANL01-ONA-BD-01-DR-A 0201 P02Plan · PDF | 29 May 2026 | View |
| Block D North Elevation - TANL01-ONA-BD-EL-DR-A 0300 P02Plan · PDF | 29 May 2026 | View |
| Landscape Masterplan - Part 2Supporting Documents · PDF | 29 May 2026 | View |
| FLOOR PLANS AS EXISTING - WHEX01Plan · PDF | 29 May 2026 | View |
| Proposed Section Plan - 168895-FAH-XX-XX-DR-S-7002-P05Plan · PDF | 23 Jun 2026 | View |
| FLOOR PLAN AS PROPOSED - WHPR01Plan · PDF | 29 May 2026 | View |
| Residential Receptor Location Plan - SK-01Plan · PDF | 29 May 2026 | View |
| Block A Section AA - TANL01-ONA-BA-SE-DR-A 0400 P01Plan · PDF | 29 May 2026 | View |
| ELEVATIONS AS PROPOSED - WHPR05Plan · PDF | 29 May 2026 | View |
| Landscape and Visual Appraisal opt_S8 part 1Supporting Documents · PDF | 29 May 2026 | View |
| Structural Survey - Tanyard – Gun ShopSupporting Documents · PDF | 29 May 2026 | View |
| Interim Travel PlanSupporting Documents · PDF | 29 May 2026 | View |
| Archaeological Desk-Based Assessment - Part 1Supporting Documents · PDF | 29 May 2026 | View |
| Block A West Elevation - TANL01-ONA-BA-EL-DR-A 0303 P02Plan · PDF | 29 May 2026 | View |
| Site Layout Plan Ground Floor Plan - TANL01-ONA-ZZ-00-DR-A 0100 P04Plan · PDF | 29 May 2026 | View |
| Assessment for the Provisional Daylight and Sunlight AssessmentSupporting Documents · PDF | 29 May 2026 | View |
| FLOOR PLANS AS PROPOSED - WHPR02Plan · PDF | 29 May 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL- Appendix A4 P6Supporting Documents · PDF | 29 May 2026 | View |
| Historic England RedactedSupport Comment · PDF | 30 Jul 2026 | View |
| Block D Roof Plan - TANL01-ONA-BD-RO-DR-A 0207 P02Plan · PDF | 29 May 2026 | View |
| Landscape and Visual Appraisal opt_S3.pdfSupporting Documents · PDF | 29 May 2026 | View |
| Block B Section AA - TANL01-ONA-BB-SE-DR-A 0400 P01Plan · PDF | 29 May 2026 | View |
| Block D Fourth Floor Plan - TANL01-ONA-BD-04-DR-A 0204 P02Plan · PDF | 29 May 2026 | View |
| Block C First Floor Plan - TANL01-ONA-BC-01-DR-A 0201 P02Plan · PDF | 29 May 2026 | View |
| Block D Fifth Floor Plan - TANL01-ONA-BD-05-DR-A 0205 P02Plan · PDF | 29 May 2026 | View |
| Landscape StrategyPlan · PDF | 29 May 2026 | View |
| Lighting AssessmentSupporting Documents · PDF | 29 May 2026 | View |
| FLOOR PLANS AS EXISTING - WHEX02Plan · PDF | 29 May 2026 | View |
| FLOOR PLAN AS PROPOSED (WITH DEMO) - WHPR01Plan · PDF | 29 May 2026 | View |
| FLOOR PLAN AND ROOF PLAN AS PROPOSED (WITH DEMO) - WHPR03Plan · PDF | 29 May 2026 | View |
| Design and Access Statement - Part 5Supporting Documents · PDF | 15 Jun 2026 | View |
| Landscape Masterplan - Part 3Plan · PDF | 29 May 2026 | View |
| Site Layout Plan Second Floor Plan - TANL01-ONA-ZZ-02-DR-A 0102 P02Plan · PDF | 29 May 2026 | View |
| Existing Elevations - Shed (adjacent to the Great Stour) - 2Plan · PDF | 2 Jun 2026 | View |
| Block A Second Floor Plan - TANL01-ONA-BA-02-DR-A 0202 P02Plan · PDF | 29 May 2026 | View |
| Flood Risk Assessment and Drainage Strategy - Part 2Supporting Documents · PDF | 29 May 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A2 P4Supporting Documents · PDF | 29 May 2026 | View |
| Noise AssessmentSupporting Documents · PDF | 29 May 2026 | View |
| Nutrient Neutrality Assessment and MitigationSupporting Documents · PDF | 29 May 2026 | View |
| SECTIONS 1 AND 2 AS PROPOSED (WITH DEMO) - WHPR06Plan · PDF | 29 May 2026 | View |
| Block C North Elevation - TANL01-ONA-BC-EL-DR-A 0300 P02Plan · PDF | 29 May 2026 | View |
| DRAWING ISSUE SHEETS REV 00 - TANL01-HAW-XX-XX-SH-Z-0001Supporting Documents · PDF | 29 May 2026 | View |
| ELEVATIONS AS EXISTING 2 - WHEX05Plan · PDF | 29 May 2026 | View |
| Block B Ground Floor Plan - TANL01-ONA-BB-00-DR-A 0200 P02Plan · PDF | 29 May 2026 | View |
| Block A Ground Floor Plan - TANL01-ONA-BA-00-DR-A 0200 P02Plan · PDF | 29 May 2026 | View |
| FLOOR PLANS AS PROPOSED (WITH DEMO) - WHPR02Plan · PDF | 29 May 2026 | View |
| Block A Section BB - TANL01-ONA-BA-SE-DR-A 0401 P02Plan · PDF | 29 May 2026 | View |
| FLOOR PLAN AND ROOF PLAN AS EXISTING - WHEX03Plan · PDF | 29 May 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A2 P3Supporting Documents · PDF | 29 May 2026 | View |
| Block A North Elevation - TANL01-ONA-BA-EL-DR-A 0300 P02Plan · PDF | 29 May 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL FIGURESSupporting Documents · PDF | 29 May 2026 | View |
| Design and Access Statement - Part 2Supporting Documents · PDF | 29 May 2026 | View |
| Design and Access Statement - Part 1Supporting Documents · PDF | 29 May 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A2 P1Supporting Documents · PDF | 29 May 2026 | View |
| Block D Third Floor Plan - TANL01-ONA-BD-03-DR-A 0203 P02Plan · PDF | 29 May 2026 | View |
| Block D East Elevation TANL01-ONA-BD-EL-DR-A 0301 P02Plan · PDF | 29 May 2026 | View |
| Block D Sixth Floor Plan - TANL01-ONA-BD-06-DR-A 0206 P02Plan · PDF | 29 May 2026 | View |
| SECTIONS 5 AND 6 AS EXISTING - WHEX08Plan · PDF | 29 May 2026 | View |
| PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A4 P1Plan · PDF | 29 May 2026 | View |
| Air Quality AssessmentSupporting Documents · PDF | 29 May 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
We haven’t collected any decision conditions for this application.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.