Council planning record

Installation of a drainage spur to connect the approved grid stability facility surface water drainage infrastructure to an existing drainage ditch.

Land to the west of Sellindge Substation, Sellindge, TN25 6AF

Decision MadeReference: PA/2023/1955Ashford Borough Council

Last published check: 29 Sept 2026, 12:37. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received Date

    Published milestoneCouncil source
  2. Valid Date

    Published milestoneCouncil source
  3. Consultation Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Latest Decision Date (Calculated)

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decision Made
Application type
Full planning permission
Received
20 Oct 2023
Validated
6 Nov 2023
Determination deadline
7 Feb 2024
Local authority
Ashford Borough Council

Application overview

Installation of a drainage spur to connect the approved grid stability facility surface water drainage infrastructure to an existing drainage ditch.

Proposal details

Reference
PA/2023/1955
Ward
Bircholt;Saxon Shore
Parish
Aldington;Smeeth
Agent
Mr Henry Gomm

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land to the west of Sellindge Substation, Sellindge, TN25 6AF

This record has no verified map location.

Documents 12 of 12

DocumentPublishedAction
Agent: cover LetterSupporting Documents · PDF6 Nov 2023View
WP GRID SERVICES 11 LIMITED SELLINDGE DRAINAGE SPUR SITE LOCATION PLAN - PL_SE_014Plan · PDF6 Nov 2023View
Application Form RedactedApplication Form · PDF20 Oct 2023View
Surface Water Drainage Strategy and Flood Risk AssessmentSupporting Documents · PDF6 Nov 2023View
Agent email dated 5/12/2023 with response to Representations raised (Redacted)Correspondence · PDF5 Dec 2023View
DM Decision Notice.pdf · PDF5 Feb 2024View
PROPOSED BLOCK PLAN DRAINAGE SPUR - 65206647-SWE-XX-XX-D-C-9003 P01Plan · PDF6 Nov 2023View
KCC: Flood & Water ManagementConsultee · PDF4 Dec 2023View
SPUR APPLICATION PLAN DRAINAGE STRATEGY - 65206647-SWE-XX-XX-D-C-9002-P02Plan · PDF6 Nov 2023View
KCC: Public rights of way mapConsultee · PDF17 Nov 2023View
DM Final Officer Report.pdf · PDF5 Feb 2024View
Advert - Press NotificationOther · PDF17 Nov 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve with Conditions
DM Decision Notice.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.