Council planning record

Discharge of conditions 2(Detailed Drawings and Full Written Schedule - Daub), 3(Materials), 4a(New Joinery), 4b(Ventilation or Flues), 4c(Waste Pipe), 4d(Floorboards), 4e(Repair of Roof Structure), 4f(Removal of Struts), 4g(New Partitions Installed) & 4h(Roof Insulation - Materials) for application 22/00165/AS

125, Bridge Street, Wye, TN25 5ED

Decision MadeReference: OTH/2022/3026Ashford Borough Council

Last published check: 1 Oct 2026, 04:06. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received Date

    Published milestoneCouncil source
  2. Valid Date

    Published milestoneCouncil source
  3. Consultation Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Latest Decision Date (Calculated)

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Date

    Published milestoneCouncil source

Application summary

Status
Decision Made
Application type
Discharge of Condition(s)
Received
1 Dec 2022
Validated
1 Dec 2022
Determination deadline
26 Jan 2023
Local authority
Ashford Borough Council

Application overview

Discharge of conditions 2(Detailed Drawings and Full Written Schedule - Daub), 3(Materials), 4a(New Joinery), 4b(Ventilation or Flues), 4c(Waste Pipe), 4d(Floorboards), 4e(Repair of Roof Structure), 4f(Removal of Struts), 4g(New Partitions Installed) & 4h(Roof Insulation - Materials) for application 22/00165/AS

Proposal details

Reference
OTH/2022/3026
Ward
Wye with Hinxhill
Parish
Wye with Hinxhill;Wye with Hinxhill
Agent
Mr David Stere

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

125, Bridge Street, Wye, TN25 5ED

This record has no verified map location.

Documents 43 of 43

DocumentPublishedAction
Stair Details BSW125-21-J13Plan · PDF1 Dec 2022View
Renovations and Alterations to Existing House Ground Floor Level Works S2038-A3-005 Rev 0Plan · PDF6 Dec 2022View
Internal Doors REV A BSW125-21-J14APlan · PDF1 Dec 2022View
Service Duct details 2 of 2 (A3) BSW125-21-C24Plan · PDF1 Dec 2022View
BSW125/21/07A Elevations as ExistingAmended Drawing · PDF14 Dec 2022View
Proposed Attic Section C-C BSW125-21-C25Plan · PDF1 Dec 2022View
BSW125/21/10A Attic SectionAmended Drawing · PDF14 Dec 2022View
Proposed Attic Section D-D BSW125-21-C26Plan · PDF1 Dec 2022View
Rear Porch Door D07 BSW125-21-J15Plan · PDF1 Dec 2022View
BSW125/21/J12A Proposed Front Dormer Drawing no.3 of 3Amended Drawing · PDF14 Dec 2022View
Front Dormer 2 of 3 REV A BSW125-21-J11APlan · PDF1 Dec 2022View
Flue and Ventilation Details BSW125-21-C22Plan · PDF1 Dec 2022View
Existing Attic Section F-F REV A BSW125-21-10APlan · PDF1 Dec 2022View
Front Dormer 1 of 3 REV A BSW125-21-J10APlan · PDF1 Dec 2022View
Attic Floor Repairs (A3) BSW125-21-C021Plan · PDF1 Dec 2022View
BSW125-Method Statement-01.pdfAmended Drawing · PDF14 Dec 2022View
Front Dormer 3 of 3 REV A BSW125-21-J12APlan · PDF1 Dec 2022View
DM Final Officer Report.pdfOfficer Report · PDF3 Apr 2023View
Rear Porch Windows W0.5 W0.6 BSW125-21-J16Plan · PDF1 Dec 2022View
Firewall Details BSW125-21- C12Plan · PDF1 Dec 2022View
003 2nd floor/Roof level worksAmended Drawing · PDF14 Dec 2022View
Proposed Attic Section E-E. BSW125-21-C27Plan · PDF1 Dec 2022View
Existing Attic Section C-C BSW125-21-07APlan · PDF1 Dec 2022View
Existing Attic Section D-D REV A BSW125-21-08APlan · PDF1 Dec 2022View
004 First floor level worksAmended Drawing · PDF14 Dec 2022View
Existing Attic Section E-E BSW125-21-09APlan · PDF1 Dec 2022View
005 Ground floor Level WorksAmended Drawing · PDF14 Dec 2022View
BSW125/21/J10A Proposed Front Dormer Drawing no.1 of 3Amended Drawing · PDF14 Dec 2022View
ApplicationApplication Form · PDF1 Dec 2022View
Proposed Attic Section F-F BSW125-21-C28Plan · PDF1 Dec 2022View
006 Typical SectionAmended Drawing · PDF14 Dec 2022View
BSW125/21/09A Existing Attic Section E-EAmended Drawing · PDF14 Dec 2022View
Renovations and Alterations to Existing House Typical Section S2038-A3-006 Rev 0Plan · PDF6 Dec 2022View
004 First floor level worksAmended Drawing · PDF14 Dec 2022View
DM Decision Notice.pdfDecision Notice · PDF3 Apr 2023View
Velux Window Detail BSW125-21- C10Plan · PDF1 Dec 2022View
BSW125/21/08A Attic Elevations as ExistingAmended Drawing · PDF14 Dec 2022View
BSW125/21/J14A Proposed Close Boarded Internal DoorsAmended Drawing · PDF14 Dec 2022View
Renovations and Alterations to Existing House 1 st Floor Level Works S2038-A3-004 Rev 0Plan · PDF6 Dec 2022View
BSW125/21/J11A Proposed Front Dormer Drawing no 2 of 3Amended Drawing · PDF14 Dec 2022View
Insulation Details BSW125-21- C11Plan · PDF1 Dec 2022View
Renovations and Alterations to Existing House 2nd Floor/Roof Level Works S2038-A3-003 Rev 0Plan · PDF6 Dec 2022View
Water And Waste Pipe Details 1 of 2 BSW125-21-C23Plan · PDF1 Dec 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
DM Decision Notice.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.