Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land Off, Ashland Road West, Sutton In Ashfield, Nottinghamshire
Last published check: 21 Oct 2026, 02:39. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceApplication For Approval Of Details Reserved By Condition 8 - Drainage Of Planning Permission V/2020/0184
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLand Off, Ashland Road West, Sutton In Ashfield, Nottinghamshire
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| V20230618_10001340336_OFFCRLTR_22022024Delegated Report | 23 Feb 2024 | View |
| [EXTERNAL]:LLFA Comments V/2023/0618Local Lead Flood Team | 21 Feb 2024 | View |
| [EXTERNAL]:LLFA Comments V/2023/0618Local Lead Flood Team | 21 Feb 2024 | View |
| NCC2023AS002_RedactedLocal Lead Flood Team | 9 Feb 2024 | View |
| E774-STORM V4 MAY23 - 100YR+CCStorm Water Simulation | 9 Feb 2024 | View |
| E774-STORM V4 MAY23 - 30YRStorm Water Simulation | 9 Feb 2024 | View |
| E774-STORM V4 MAY23 - 2YRStorm Water Simulation | 9 Feb 2024 | View |
| E774-OFR3B-OVERLAND FLOW ROUTE (EXCEEDANCE)Layout Plan | 9 Feb 2024 | View |
| E774-OFR2B-OVERLAND FLOW ROUTE (EXCEEDANCE)Layout Plan | 9 Feb 2024 | View |
| E774-OFR1B-OVERLAND FLOW ROUTE (EXCEEDANCE)Layout Plan | 9 Feb 2024 | View |
| E774-DAP3-DRAINAGE AREA PLANDrainage Layout | 9 Feb 2024 | View |
| E774-DAP2-DRAINAGE AREA PLANDrainage Layout | 9 Feb 2024 | View |
| E774-DAP1-DRAINAGE AREA PLANDrainage Layout | 9 Feb 2024 | View |
| E774-47 S22A CONTROL CHAMBER INLET HEADWALLPond Layout Plan | 9 Feb 2024 | View |
| E774-46A S63 POND INLET HEADWALLPond Layout Plan | 9 Feb 2024 | View |
| E774-45A S21 POND INLET HEADWALLPond Layout Plan | 9 Feb 2024 | View |
| E774-42A-S22 CONTROL MANHOLE DETAILSSewer Plans | 9 Feb 2024 | View |
| E774-40A-DCG ADOPTABLE DETAILSSewer Plans | 9 Feb 2024 | View |
| E774-28E-DRAINAGE OUT OF CARRIAGEWAY LONG SECTIONSDrainage Layout | 9 Feb 2024 | View |
| E774-15 SURFACE WATER DRAINAGE AND STRATEGY-Layout1Drainage Strategy | 9 Feb 2024 | View |
| E774-12G-ENGINEERING LAYOUTEngineering Layout | 9 Feb 2024 | View |
| E774-11G-ENGINEERING LAYOUTEngineering Layout | 9 Feb 2024 | View |
| E774-10F-ENGINEERING LAYOUTEngineering Layout | 9 Feb 2024 | View |
| E774 HYDROBRAKE SHE-0287-4900-1400-4900_Design_DrawingAdditional Information | 9 Feb 2024 | View |
| 7919 Ashlands Road LMP_REV ALandscape and Ecology Management Plan | 9 Feb 2024 | View |
| E774-OFR2B-OVERLAND FLOW ROUTE (EXCEEDANCE)Drainage Layout | 6 Feb 2024 | View |
| E774-OFR1B-OVERLAND FLOW ROUTE (EXCEEDANCE)Drainage Layout | 6 Feb 2024 | View |
| E774-DAP3-DRAINAGE AREA PLANDrainage Layout | 6 Feb 2024 | View |
| E774-DAP2-DRAINAGE AREA PLANDrainage Layout | 6 Feb 2024 | View |
| E774-DAP1-DRAINAGE AREA PLANDrainage Layout | 6 Feb 2024 | View |
| E774-47 S22A CONTROL CHAMBER INLET HEADWALLDrainage Construction Details | 6 Feb 2024 | View |
| E774-OFR3B-OVERLAND FLOW ROUTE (EXCEEDANCE)Drainage Layout | 6 Feb 2024 | View |
| FW: [EXTERNAL]:RE: V/2023/0618 - Condition 8 Surface water drainage discharge of conditionDrainage Construction Details | 6 Feb 2024 | View |
| FW: [EXTERNAL]:RE: V/2023/0618 - Condition 8 Surface water drainage discharge of conditionLandscape Statement | 6 Feb 2024 | View |
| FW: [EXTERNAL]:RE: V/2023/0618 - Condition 8 Surface water drainage discharge of conditionDrainage Construction Details | 6 Feb 2024 | View |
| FW: [EXTERNAL]:RE: V/2023/0618 - Condition 8 Surface water drainage discharge of conditionDrainage Construction Details | 6 Feb 2024 | View |
| FW: [EXTERNAL]:RE: V/2023/0618 - Condition 8 Surface water drainage discharge of conditionDrainage Construction Details | 6 Feb 2024 | View |
| FW: [EXTERNAL]:RE: V/2023/0618 - Condition 8 Surface water drainage discharge of conditionDrainage Construction Details | 6 Feb 2024 | View |
| [EXTERNAL]:LLFA Comments V/2023/0618Local Lead Flood Team | 2 Jan 2024 | View |
| [EXTERNAL]:V/2023/0486Application Form | 14 Dec 2023 | View |
| NCC2023AS002Drainage, Flood Risk and Sevices Study (R) | 30 Oct 2023 | View |
| E774 HYDROBRAKE SHE-0287-4900-1400-4900_Design_DrawingDesign Statement | 30 Oct 2023 | View |
| E774-STORM V4 MAY23 - 100YR+CCDrainage and flood risk and services study | 30 Oct 2023 | View |
| E774-STORM V4 MAY23 - 30YRDrainage and flood risk and services study | 30 Oct 2023 | View |
| E774-STORM V4 MAY23 - 2YRDrainage and flood risk and services study | 30 Oct 2023 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.