Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land At Rolls Royce, Watnall Road, Hucknall, Nottinghamshire
Last published check: 21 Oct 2026, 14:42. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceReserved Matters Application For The Proposed Construction Of 4 Industrial Buildings Comprising Of B8 (Storage And Distribution) And B2 (General Industrial) With Associated Service Yard And Car Parking Pursuant To Outline Planning Permission V/2013/0123
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLand At Rolls Royce, Watnall Road, Hucknall, Nottinghamshire
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| Delegated Report (R)Delegated Report (R) | 30 May 2024 | View |
| Decision Notice (R)Decision Notice (R) | 30 May 2024 | View |
| Additional InformationAdditional Information | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Landscape Drawings (Email 2 of 2)Approved Landscaping Layout | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Landscape Drawings (Email 2 of 2)Approved Landscaping Layout | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Landscape Drawings (Email 2 of 2)Approved Landscaping Layout | 15 May 2024 | View |
| Approved Highway Construction DetailsApproved Highway Construction Details | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Engineer Drawings (Email 2 of 2)Approved Highway Construction Details | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Engineer Drawings (Email 2 of 2)Approved Highway Construction Details | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Engineer Drawings (Email 2 of 2)Approved Highway Construction Details | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Engineer Drawings (Email 2 of 2)Approved Highway Construction Details | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Landscape Drawings (Email 1 of 2)Approved Landscaping Layout | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Landscape Drawings (Email 1 of 2)Approved Landscaping Layout | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Landscape Drawings (Email 1 of 2)Approved Landscaping Layout | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Architectural Report and Drawings (Email 2 of 2)Approved Sections | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Architectural Report and Drawings (Email 2 of 2)Approved Site Plan | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Architectural Report and Drawings (Email 2 of 2)Approved Layout Plan | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Architectural Report and Drawings (Email 2 of 2)Approved Site Plan | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Architectural Report and Drawings (Email 2 of 2)Approved Site Plan | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Architectural Report and Drawings (Email 2 of 2)Approved Layout Plan | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Architectural Report and Drawings (Email 2 of 2)Approved Site Plan | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Architectural Report and Drawings (Email 2 of 2)Amended Layout Plan | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Architectural Report and Drawings (Email 2 of 2)Approved Site Layout Plan | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Architectural Report and Drawings (Email 2 of 2)Approved Section Plan | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Architectural Report and Drawings (Email 2 of 2)Approved Layout Plan | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Architectural Report and Drawings (Email 2 of 2)Approved Layout Plan | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Engineer Drawings (Email 1 of 2)Approved Site Levels | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Engineer Drawings (Email 1 of 2)Approved Earthworks Plan | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Engineer Drawings (Email 1 of 2)Approved Drainage Layout | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Engineer Drawings (Email 1 of 2)Approved Drainage Layout | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Engineer Drawings (Email 1 of 2)Approved Drainage Layout | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Engineer Drawings (Email 1 of 2)Approved Drainage Layout | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Engineer Drawings (Email 1 of 2)Approved Drainage Layout | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall V/2023/0396 and V/2023/0411 - Revised Engineer Drawings (Email 1 of 2)Drainage and flood risk and services study | 15 May 2024 | View |
| 11897-8-(P)109A Existing unit 2D site plan -250-A1 (NBB 10-05-24)Amended Layout Plan | 15 May 2024 | View |
| 11897-8-(P)107A Existing unit 2B site plan -250-A1 (NBB 10-05-24)Amended Layout Plan | 15 May 2024 | View |
| 11897-8-(P)108A Existing unit 2C site plan -250-A1 (NBB 10-05-24)Amended Layout Plan | 15 May 2024 | View |
| 11897-8-(P)106A Existing unit 2A site plan -250-A0 (NBB 10-05-24)Amended Layout Plan | 15 May 2024 | View |
| 11897-8-(P)103A-Existing site plan 2-500-A0 (NBB 10-05-24)Amended Layout Plan | 15 May 2024 | View |
| 11897-8-(P)101E-Existing overall site plan-1000-A1 (NBB 10-05-24)Amended Layout Plan | 15 May 2024 | View |
| 11897-8-(P)100E_Location_2500_A1 (NBB 10-05-24)Approved Site Location Plan | 15 May 2024 | View |
| 11897-8 DA01C Design & Access Statement A4 (NBB 13-05-24)Design & Access Statement | 15 May 2024 | View |
| FW: [EXTERNAL]:Hucknall - Industrial Unit Planning ApplicationsSite Access Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 1 of 2)Approved Floor Plans - Proposed | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 1 of 2)Approved Floor Plans - Proposed | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 1 of 2)Approved Floor Plans - Proposed | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 1 of 2)Approved Roof Layout Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 1 of 2)Approved Elevations - Proposed | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 1 of 2)Approved Elevations - Proposed | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 1 of 2)Approved Elevations - Proposed | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 1 of 2)Amended 3D Conceptual Visualisations | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 1 of 2)Amended 3D Conceptual Visualisations | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 1 of 2)Approved Elevations - Proposed | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 1 of 2)Amended 3D Conceptual Visualisations | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 1 of 2)Amended 3D Conceptual Visualisations | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 1 of 2)Approved Floor Plans - Proposed | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 1 of 2)Approved Roof Layout Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Landscape Drawings (Email 2 of 2)Amended Landscaping Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Landscape Drawings (Email 2 of 2)Amended Landscaping Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Landscape Drawings (Email 2 of 2)Approved Landscaping Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Landscape Drawings (Email 2 of 2)Approved Landscaping Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Landscape Drawings (Email 1 of 2)Amended Landscaping Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Landscape Drawings (Email 1 of 2)Amended Landscaping Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Landscape Drawings (Email 1 of 2)Amended Landscaping Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Landscape Drawings (Email 1 of 2)Amended Landscaping Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Highways Drawings (Email 2 of 2)Amended Highway Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Highways Drawings (Email 2 of 2)Approved Highway Construction Details | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Highways Drawings (Email 1 of 2)Amended Highway Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Highways Drawings (Email 1 of 2)Amended Highway Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Highways Drawings (Email 1 of 2)Amended Highway Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Highways Drawings (Email 1 of 2)Amended Highway Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Highways Drawings (Email 1 of 2)Amended Highway Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised M&E Drawings (Email 1 of 1)Amended Lighting Design | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised M&E Drawings (Email 1 of 1)Approved External Works Layout Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised M&E Drawings (Email 1 of 1)Amended Lighting Design | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised M&E Drawings (Email 1 of 1)Approved External Works Layout Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised M&E Drawings (Email 1 of 1)Amended Lighting Design | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised M&E Drawings (Email 1 of 1)Amended External Works Layout Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised M&E Drawings (Email 1 of 1)Amended Lighting Design | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised M&E Drawings (Email 1 of 1)Approved External Works Layout Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised M&E Drawings (Email 1 of 1)Amended Lighting Design | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised M&E Drawings (Email 1 of 1)Approved External Works Layout Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 2 of 2)Amended Site Location Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 2 of 2)Amended Site Location Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 2 of 2)Amended Site Location Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 2 of 2)Amended Site Location Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 2 of 2)Amended Site Location Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 2 of 2)Amended Site Location Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 2 of 2)Amended Site Location Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 2 of 2)Amended Site Location Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 2 of 2)Amended Sections Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 2 of 2)Amended Sections Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Architectural Drawings (Email 2 of 2)Site Plan - Proposed | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Drainage Drawings (Email 1 of 1)Superseded Drainage Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Drainage Drawings (Email 1 of 1)Superseded Drainage Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Drainage Drawings (Email 1 of 1)Superseded Drainage Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Drainage Drawings (Email 1 of 1)Superseded Drainage Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Drainage Drawings (Email 1 of 1)Superseded Drainage Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Drainage Drawings (Email 1 of 1)Superseded Drainage Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Drainage Drawings (Email 1 of 1)Superseded Drainage Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Drainage Drawings (Email 1 of 1)Superseded Drainage Layout | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Earthworks Drawings (Email 1 of 1)Amended Earthworks Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Earthworks Drawings (Email 1 of 1)Amended Earthworks Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Earthworks Drawings (Email 1 of 1)Amended Earthworks Plan | 24 Apr 2024 | View |
| FW: [EXTERNAL]:Hucknall - V/2023/0396 and V/2023/0411 - Revised Earthworks Drawings (Email 1 of 1)Amended Earthworks Plan | 24 Apr 2024 | View |
| 396Nottinghamshire County Council - Highways | 8 Apr 2024 | View |
| [EXTERNAL]:V/2023/0396 Land at Rolls Royce Watnall Road HucknallNottinghamshire County Council - Highways | 25 Mar 2024 | View |
| FW: [EXTERNAL]:Land at Dorey Way, Hucknall, NottsDrainage Layout | 20 Feb 2024 | View |
| RM Highway CommentsNottinghamshire County Council - Highways | 15 Feb 2024 | View |
| FW: [EXTERNAL]:V/2023/0396 - Reserved Matters 5No B2/B8 Units at Dorey Way HucknallGeneral Arrangement | 15 Feb 2024 | View |
| [EXTERNAL]:V/2023/0396 Dorey Way HucknallNottinghamshire County Council - Highways | 23 Jan 2024 | View |
| 1A.D.C. - Environmental Protection | 16 Jan 2024 | View |
| [EXTERNAL]:LLFA Comments V/2023/0396Local Lead Flood Team | 2 Jan 2024 | View |
| updated application formApplication Form | 20 Dec 2023 | View |
| 11897-8-(P)134 Cycle Shelter-25-A2 (NBB 18-10-23)Approved Elevations and Floor plans - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)133 Proposed Fencing Detail-25-A3 (NBB 18-10-23)Fencing Plans | 7 Dec 2023 | View |
| 11897-8-(P)132 Sub Station-25-A2 (NBB 18-10-23)Approved Elevations and Floor plans - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)131 Plant Enclosure-25-A2 (NBB 18-10-23)Approved Elevations and Floor plans - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)130 Bin Compound-25-A2 (NBB 18-10-23)Approved Elevations and Floor plans - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)126-Whitelining-50-A2 (NBB 18-10-23)Approved Layout Plan | 7 Dec 2023 | View |
| 11897-8-(P)125 Plot 2D Site Plan-250-A1 (NBB 18-10-23)Site Plan - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)124 Plot 2C Site Plan-250-A1 (NBB 18-10-23)Site Plan - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)123 Plot 2B Site Plan-250-A1 (NBB 18-10-23)Site Plan - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)122A Plot 2A-250-A0 (NBB 18-10-23)Site Plan - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)120A Plot 1B 250-A0 (NBB 18-10-23)Site Plan - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)119B-Proposed unit 2D site plan-250-A1 (NBB 18-10-23)Site Plan - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)118B-Proposed unit 2C site plan-250-A1 (NBB 18-10-23)Site Plan - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)117B-Proposed unit 2B site plan-250-A1 (NBB 18-10-23)Site Plan - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)116B-Proposed unit 2A site plan-250-A0 (NBB 18-10-23)Site Plan - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)114E-Proposed unit 1B site plan-250-A0 (NBB 18-10-23)Site Plan - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)113F-Proposed site plan 2-500-A0 (NBB 18-10-23)Site Plan - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)112G-Proposed site plan 1-500-A1 (NBB 18-10-23)Site Plan - Proposed | 7 Dec 2023 | View |
| 11897-8-(P)111K-Overall site plan-1000-A1 (NBB 18-10-23)Site Layout Plan | 7 Dec 2023 | View |
| 11897-8-(P)109 Existing unit 2D site plan -250-A1 (NBB 18-10-23)Site Layout Plan - Existing | 7 Dec 2023 | View |
| 11897-8-(P)108 Existing unit 2C site plan -250-A1 (NBB 18-10-23)Site Layout Plan - Existing | 7 Dec 2023 | View |
| 11897-8-(P)107 Existing unit 2B site plan -250-A1 (NBB 18-10-23)Site Layout Plan - Existing | 7 Dec 2023 | View |
| 11897-8-(P)106 Existing unit 2A site plan -250-A0 (NBB 18-10-23)Site Layout Plan - Existing | 7 Dec 2023 | View |
| 11897-8-(P)105B Existing unit 1C site plan 250-A0 (NBB 18-10-23)Site Layout Plan - Existing | 7 Dec 2023 | View |
| 11897-8-(P)104A Existing unit 1B site plan 250-A0 (NBB 18-10-23)Site Layout Plan - Existing | 7 Dec 2023 | View |
| 11897-8-(P)103-Existing site plan 2-500-A0 (NBB 18-10-23)Site Layout Plan - Existing | 7 Dec 2023 | View |
| 11897-8-(P)102C-Existing site plan 1-500-A1 (NBB 18-10-23)Site Layout Plan - Existing | 7 Dec 2023 | View |
| 11897-8-(P)101D-Existing overall site plan-1000-A1 (NBB 18-10-23)Site Layout Plan - Existing | 7 Dec 2023 | View |
| 11897-8-(P)100D_Location_2500_A1 (NBB 18-10-23)Site Location Plan | 7 Dec 2023 | View |
| 11897-8-(2D)-005B-Unit 2D Roof Plan-200-A1 (NBB 28-11-23)Approved Roof Layout Plan | 7 Dec 2023 | View |
| 11897-8-(2D)-004B-Unit 2D 3D Views-200-A1 (NBB 28-11-23)3D Conceptual Visualisations | 7 Dec 2023 | View |
| 11897-8-(2D)-003D-Unit 2D Elevations-200-A1 (NBB 28-11-23)Elevation - Proposed | 7 Dec 2023 | View |
| "11897-8-(2D)-002"-Unit 2D Office Plans-200-A1 (NBB 28-11-23)Floor Plans - Proposed | 7 Dec 2023 | View |
| 11897-8-(2D)-001C-Unit 2D Floor Plans-200-A1 (NBB 28-11-23)Floor Plans - Proposed | 7 Dec 2023 | View |
| 11897-8-(2C)-005C-Unit 2C Roof Plan-200-A1 (NBB 18-10-23)Roof Layout Plan | 7 Dec 2023 | View |
| 11897-8-(2C)-004B-Unit 2C 3D Views-200-A1 (NBB 18-10-23)3D Conceptual Visualisations | 7 Dec 2023 | View |
| 11897-8-(2C)-003D-Unit 2C Elevations-200-A1 (NBB 18-10-23)Elevation - Proposed | 7 Dec 2023 | View |
| 11897-8-(2C)-002-Unit 2C Office Plans-200-A1 (NBB 18-10-23)Approved Floor Plans - Proposed | 7 Dec 2023 | View |
| 11897-8-(2C)-001B-Unit 2C Floor Plans-200-A1 (NBB 18-10-23)Floor Plans - Proposed | 7 Dec 2023 | View |
| 11897-8-(2B)-005B-Unit 2B Roof Plan-200-A1 (NBB 18-10-23)Roof Layout Plan | 7 Dec 2023 | View |
| 11897-8-(2B)-004B-Unit 2B 3D Views-200-A1 (NBB 18-10-23)3D Conceptual Visualisations | 7 Dec 2023 | View |
| 11897-8-(2B)-003D-Unit 2B Elevations-200-A1 (NBB 18-10-23)Elevation - Proposed | 7 Dec 2023 | View |
| 11897-8-(2B)-002-Unit 2B Office Plans-200-A1 (NBB 18-10-23)Floor Plans - Proposed | 7 Dec 2023 | View |
| 11897-8-(2B)-001B-Unit 2B Floor Plans-200-A1 (NBB 18-10-23)Floor Plans - Proposed | 7 Dec 2023 | View |
| 11897-8-(2A)-005B-Unit 2A Roof Plan-200-A1 (NBB 28-11-23)Roof Layout Plan | 7 Dec 2023 | View |
| 11897-8-(2A)-004B-Unit 2A 3D Views-200-A1 (NBB 28-11-23)3D Conceptual Visualisations | 7 Dec 2023 | View |
| 11897-8-(2A)-003D-Unit 2A Elevations-200-A1 (NBB 28-11-23)Elevation - Proposed | 7 Dec 2023 | View |
| 11897-8-(2A)-002-Unit 2A Office Plans-200-A2 (NBB 28-11-23)Floor Plans - Proposed | 7 Dec 2023 | View |
| 11897-8-(2A)-001B-Unit 2A Floor Plans-200-A1 (NBB 28-11-23)Floor Plans - Proposed | 7 Dec 2023 | View |
| 11897-8-(1B)005C-Unit 1B Roof 250 A1 (NBB 18-10-23)Roof Layout Plan | 7 Dec 2023 | View |
| 11897-8-(1B)004D-Unit 1B Elevations 200 A1 (NBB 18-10-23)Elevation - Proposed | 7 Dec 2023 | View |
| 11897-8-(1B)003D-Unit 1B Elevations 200 A1 (NBB 18-10-23)Elevation - Proposed | 7 Dec 2023 | View |
| 11897-8-(1B)002-Unit 1B Office plans 200 A1 (NBB 18-10-23)Floor Plans - Proposed | 7 Dec 2023 | View |
| 11897-8-(1B)001B-Unit 1B Floor plans 250 A1 (NBB 18-10-23)Floor Plans - Proposed | 7 Dec 2023 | View |
| 11897-8 DA01B Design & Access Statement A4 (NBB 28-11-23)Design & Access Statement | 7 Dec 2023 | View |
| RF22-952-S01_P03-Landscape Specification & Maintenance Schedule (CM 07-11-23)Landscape Statement | 7 Dec 2023 | View |
| RF22-952 Submission regarding Planning Condition 18 (CM 03-07-23)Landscape Statement | 7 Dec 2023 | View |
| 0952-RFM-XX-00-DR-L-8002-S2-P02-Outdoor Seating Area Details (CM 07-11-23)Layout Plan | 7 Dec 2023 | View |
| 0952-RFM-XX-00-DR-L-8001-S2-P02-Softworks Details (CM 07-11-23)Approved Landscaping Layout | 7 Dec 2023 | View |
| 0952-RFM-XX-00-DR-L-0014-S4-P04-Heat Bricks Area General Arrangement Plan (CM 07-11-23)General Arrangement | 7 Dec 2023 | View |
| 0952-RFM-XX-00-DR-L-0013-S2-P03-Soil Plan 2 (CM 07-11-23)Layout Plan | 7 Dec 2023 | View |
| 0952-RFM-XX-00-DR-L-0012-S2-P05-Soil Plan 1 (CM 07-11-23)Layout Plan | 7 Dec 2023 | View |
| 0952-RFM-XX-00-DR-L-0011-S2-P05-Planting Schedule (CM 07-11-23)Layout Plan | 7 Dec 2023 | View |
| 0952-RFM-XX-00-DR-L-0010-S2-P03-Units 2A-2D Planting Plan 4 (CM 07-11-23)Layout Plan | 7 Dec 2023 | View |
| 0952-RFM-XX-00-DR-L-0009-S2-P03-Units 2A-2D Planting Plan 3 (CM 07-11-23)Layout Plan | 7 Dec 2023 | View |
| 0952-RFM-XX-00-DR-L-0008-S2-P03-Units 2A-2D Planting Plan 2 (CM 07-11-23)Layout Plan | 7 Dec 2023 | View |
| 0952-RFM-XX-00-DR-L-0007-S2-P03-Units 2A-2D Planting Plan 1 (CM 07-11-23)Layout Plan | 7 Dec 2023 | View |
| 0952-RFM-XX-00-DR-L-0006-S2-P05-Unit 1B Planting Plan 2 (CM 07-11-23)Layout Plan | 7 Dec 2023 | View |
| 0952-RFM-XX-00-DR-L-0005-S2-P03-Unit 1B Planting Plan 1 (CM 07-11-23)Layout Plan | 7 Dec 2023 | View |
| FW: [EXTERNAL]:Re: V/2023/0396 - Land at Rolls RoyceCovering Letter (R) | 7 Dec 2023 | View |
| 11897-8-(P)134 Cycle Shelter-25-A2 (NBB 10-07-23)Site Layout Plan - Proposed | 12 Jul 2023 | View |
| 11897-8-(P)126-Whitelining-50-A2 (NBB 07-07-23)Material Details | 12 Jul 2023 | View |
| 11897-8-(P)125 Plot 2D Site Plan-250-A1 (NBB 07-07-23)Site Layout Plan - Proposed | 12 Jul 2023 | View |
| 11897-8-(P)124 Plot 2C Site Plan-250-A1 (NBB 07-07-23)Site Layout Plan - Proposed | 12 Jul 2023 | View |
| 11897-8-(P)123 Plot 2B Site Plan-250-A1 (NBB 07-07-23)Site Layout Plan - Proposed | 12 Jul 2023 | View |
| 11897-8-(P)122A Plot 2A-250-A0 (NBB 10-07-23)Site Layout Plan - Proposed | 12 Jul 2023 | View |
| 11897-8-(P)121 Plot 1C 250-A0 (NBB 07-07-23)Site Layout Plan - Proposed | 12 Jul 2023 | View |
| 11897-8-(P)120 Plot 1B 250-A0 (NBB 07-07-23)Site Layout Plan - Proposed | 12 Jul 2023 | View |
| 11897-8-(2D)-003C-Unit 2D Elevations-200-A1 (NBB 07-07-23)Amended Elevations - Proposed | 12 Jul 2023 | View |
| 11897-8-(2C)-003C-Unit 2C Elevations-200-A1 (NBB 07-07-23)Amended Elevations - Proposed | 12 Jul 2023 | View |
| 11897-8-(2B)-003C-Unit 2B Elevations-200-A1 (NBB 07-07-23)Amended Elevations - Proposed | 12 Jul 2023 | View |
| 11897-8-(2A)-003C-Unit 2A Elevations-200-A1 (NBB 07-07-23)Amended Elevations - Proposed | 12 Jul 2023 | View |
| 11897-8-(1C)004C-Unit 1C Elevations 200 A1 (NBB 07-07-23)Amended Elevations - Proposed | 12 Jul 2023 | View |
| 11897-8-(1C)003C-Unit 1C Elevations 200 A1 (NBB 07-07-23)Amended Elevations - Proposed | 12 Jul 2023 | View |
| 11897-8-(1B)004C-Unit 1B Elevations 200 A1 (NBB 07-07-23)Amended Elevations - Proposed | 12 Jul 2023 | View |
| 11897-8-(1B)003C-Unit 1B Elevations 200 A1 (NBB 07-07-23)Amended Elevations - Proposed | 12 Jul 2023 | View |
| [EXTERNAL]:RE: V/2023/0396Site Plan - Proposed | 7 Jul 2023 | View |
| [EXTERNAL]:RE: V/2023/0396Site Location Plan | 7 Jul 2023 | View |
| 11897-8-P133 Proposed Fencing Detail-25-A3Fencing Plans | 4 Jul 2023 | View |
| 11897-8-P132 Sub Station-25-A2Approved Elevations and Floor plans - Proposed | 4 Jul 2023 | View |
| 11897-8-P131 Plant Enclosure-25-A2Approved Elevations and Floor Plans | 4 Jul 2023 | View |
| 11897-8-P130 Bin Compound-25-A2Site Waste Management Statement | 4 Jul 2023 | View |
| 11897-8-P119D Proposed unit 2D site plan-250-A1Site Layout Plan - Proposed | 4 Jul 2023 | View |
| 11897-8-P118C Proposed unit 2C site plan-250-A0Site Layout Plan - Proposed | 4 Jul 2023 | View |
| 11897-8-P117B Proposed unit 2B site plan-250-A1Site Layout Plan - Proposed | 4 Jul 2023 | View |
| 11897-8-P116D Proposed unit 2A site plan-250-A0Site Layout Plan - Proposed | 4 Jul 2023 | View |
| 11897-8-P115B Proposed unit 1C site plan 250-A0Site Layout Plan - Proposed | 4 Jul 2023 | View |
| 11897-8-P114B Proposed unit 1B site plan 250-A0Site Layout Plan - Proposed | 4 Jul 2023 | View |
| 11897-8-P113G-Proposed site plan 2-500-A0Site Layout Plan - Proposed | 4 Jul 2023 | View |
| 11897-8-P112C-Proposed site plan 1-500-A1Site Layout Plan - Proposed | 4 Jul 2023 | View |
| 11897-8-P111F-Overall site plan-1000-A1Site Layout Plan - Proposed | 4 Jul 2023 | View |
| 11897-8-P109 Existing unit 2D site plan-250-A1Site Layout Plan - Existing | 4 Jul 2023 | View |
| 11897-8-P108 Existing unit 2C site plan-250-A1Site Layout Plan - Existing | 4 Jul 2023 | View |
| 11897-8-P107 Existing unit 2B site plan-250-A1Site Layout Plan - Existing | 4 Jul 2023 | View |
| 11897-8-P106 Existing unit 2A site plan-250-A0Site Layout Plan - Existing | 4 Jul 2023 | View |
| 11897-8-P105 Existing unit 1C site plan 250-A0Site Layout Plan - Existing | 4 Jul 2023 | View |
| 11897-8-P104 Existing unit 1B site plan 250-A0Site Layout Plan - Existing | 4 Jul 2023 | View |
| 11897-8-P103-Site plan 2-500-A0Site Layout Plan - Existing | 4 Jul 2023 | View |
| 11897-8-P102-Site plan 1-500-A1Site Layout Plan - Existing | 4 Jul 2023 | View |
| 11897-8-P101-Existing Overall site plan-1000-A1Site Layout Plan - Existing | 4 Jul 2023 | View |
| 11897-8-P100_Location Plan_2500_A1Site Location Plan | 4 Jul 2023 | View |
| 11897-8-2D005B-Unit 2D Roof Plan-200-A1Roof Layout Plan | 4 Jul 2023 | View |
| 11897-8-2D-004A-Unit 2D 3D Views-200-A1Visualisation | 4 Jul 2023 | View |
| 11897-8-2D-002-Unit 2D Office Plans-200-A1Floor Plans - Proposed | 4 Jul 2023 | View |
| 11897-8-2D-001C-Unit 2D Floor Plans-200-A1Floor Plans - Proposed | 4 Jul 2023 | View |
| 11897-8-2C-005B-Unit 2C Roof Plan-200-A1Roof Layout Plan | 4 Jul 2023 | View |
| 11897-8-2C-004A-Unit 2C 3D Views-200-A1Visualisation | 4 Jul 2023 | View |
| 11897-8-2C-002-Unit 2C Office Plans-200-A1Approved Floor Plans - Proposed | 4 Jul 2023 | View |
| 11897-8-2C-001B-Unit 2C Floor Plans-200-A1Approved Floor Plans - Proposed | 4 Jul 2023 | View |
| 11897-8-2B-005B-Unit 2B Roof Plan-200-A1Approved Roof Layout Plan | 4 Jul 2023 | View |
| 11897-8-2B-004A-Unit 2B 3D Views-200-A1Visualisation | 4 Jul 2023 | View |
| 11897-8-2B-002-Unit 2B Office Plans-200-A1Floor Plans - Proposed | 4 Jul 2023 | View |
| 11897-8-2B-001B-Unit 2B Floor Plans-200-A1Approved Floor Plans - Proposed | 4 Jul 2023 | View |
| 11897-8-2A-005B-Unit 2A Roof Plan-200-A1Roof Layout Plan | 4 Jul 2023 | View |
| 11897-8-2A-004A-Unit 2A 3D Views-200-A1Visualisation | 4 Jul 2023 | View |
| 11897-8-2A-002-Unit 2A Office Plans-200-A2Floor Plans - Proposed | 4 Jul 2023 | View |
| 11897-8-2A-001B-Unit 2A Floor Plans-200-A1Floor Plans - Proposed | 4 Jul 2023 | View |
| 11897-8-1C005B-Unit 1C Roof 250 A1Roof Layout Plan | 4 Jul 2023 | View |
| 11897-8-1C002-Unit 1C Office plans 200 A1Floor Plans - Proposed | 4 Jul 2023 | View |
| 11897-8-1C001B-Unit 1C Floor plans 250 A1Floor Plans - Proposed | 4 Jul 2023 | View |
| 11897-8-1B005B-Unit 1B Roof 250 A1Roof Layout Plan | 4 Jul 2023 | View |
| 11897-8-1B002-Unit 1B Office plans 200 A1Floor Plans - Proposed | 4 Jul 2023 | View |
| 11897-8-1B001B-Unit 1B Floor plans 250 A1Floor Plans - Proposed | 4 Jul 2023 | View |
| 11897-8-(P)100_Location_2500_A1Site Location Plan | 4 Jul 2023 | View |
| 11897-8 DA01A DESIGN ACCESS STATEMENT-minDesign & Access Statement | 4 Jul 2023 | View |
| 0952-RFM-XX-00-DR-L-8001-Softworks DetailsLandscape Proposals - Schedules & Specifications | 4 Jul 2023 | View |
| 0952-RFM-XX-00-DR-L-0014 Heat Bricks Area General Arrangement PlanApproved Landscaping Layout | 4 Jul 2023 | View |
| 0952-RFM-XX-00-DR-L-0013-Soil Plan 2Soil and Agricultural Survey | 4 Jul 2023 | View |
| 0952-RFM-XX-00-DR-L-0012-Soil Plan 1Soil and Agricultural Survey | 4 Jul 2023 | View |
| 0952-RFM-XX-00-DR-L-0011-Planting ScheduleLandscape Proposals - Schedules & Specifications | 4 Jul 2023 | View |
| 0952-RFM-XX-00-DR-L-0010 Units 2A-2D Planting Plan 4Approved Site Layout Plan | 4 Jul 2023 | View |
| 0952-RFM-XX-00-DR-L-0009 Units 2A-2D Planting Plan 3Approved Site Layout Plan | 4 Jul 2023 | View |
| 0952-RFM-XX-00-DR-L-0008 Units 2A-2D Planting Plan 2Approved Site Layout Plan | 4 Jul 2023 | View |
| 0952-RFM-XX-00-DR-L-0007 Units 2A-2D Planting Plan 1Approved Site Layout Plan | 4 Jul 2023 | View |
| 0952-RFM-XX-00-DR-L-0006 Units 1B 1C Planting Plan 4Site Layout Plan - Proposed | 4 Jul 2023 | View |
| 0952-RFM-XX-00-DR-L-0005 Units 1B 1C Planting Plan 3Site Layout Plan - Proposed | 4 Jul 2023 | View |
| 0952-RFM-XX-00-DR-L-0004 Units 1B 1C Planting Plan 2Site Layout Plan - Proposed | 4 Jul 2023 | View |
| 0952-RFM-XX-00-DR-L-0003 Units 1B 1C Planting Plan 1Site Layout Plan - Proposed | 4 Jul 2023 | View |
| RF22-952-S01 Landscape Specification and Maintenance ScheduleLandscape Statement | 4 Jul 2023 | View |
| Reserved Matters Planning Application Drawing ListAdditional Information | 4 Jul 2023 | View |
| MUS-WRH-Sketch Parameter Plans -UPDATE 140131-bSuperseded Site Plan | 4 Jul 2023 | View |
| ApplicationFormRedactedApplication Form | 4 Jul 2023 | View |
| 11897-8-P133 Proposed Fencing Detail-25-A3Approved Fencing Plans | 4 Jul 2023 | View |
| 11897-8-P132 Sub Station-25-A2Approved Elevations and Floor plans - Proposed | 4 Jul 2023 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.