Council planning record

Approval of details reserved by condition imposed under P/30/19/OUT relating to conditions 5-schedule of materials and finishes, 10-surface water drainage, 11-discharge flows to watercourses, 12-maintenance and management of surface water drainage system, 14-foul drainage system, 15-external lighting, 16-Construction Management Plan, 22-existing vehicular access onto Sefter Road and Pagham Road have been physically closed, 23-plans and details and timetable for installation of dwellings, 24-pedestrian and cyclist access points, 27-Broadband provision, 29-ehancement of existing hedgerows for use by bats and 33-Electric Vehicle Charging Strategy.

Land North of Hook Lane Pagham PO21 3PD

DOC Part ApprovedReference: P/42/22/DOCArun District Council

Last published check: 28 Sept 2026, 12:45. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decided

    Published milestoneCouncil source

Application summary

Status
DOC Part Approved
Application type
Not published
Received
16 Mar 2022
Validated
16 Mar 2022
Determination deadline
11 May 2022
Local authority
Arun District Council

Application overview

Approval of details reserved by condition imposed under P/30/19/OUT relating to conditions 5-schedule of materials and finishes, 10-surface water drainage, 11-discharge flows to watercourses, 12-maintenance and management of surface water drainage system, 14-foul drainage system, 15-external lighting, 16-Construction Management Plan, 22-existing vehicular access onto Sefter Road and Pagham Road have been physically closed, 23-plans and details and timetable for installation of dwellings, 24-pedestrian and cyclist access points, 27-Broadband provision, 29-ehancement of existing hedgerows for use by bats and 33-Electric Vehicle Charging Strategy.

Proposal details

Reference
P/42/22/DOC
Parish
Pagham
Agent
Bellway Homes Ltd (Wessex) Bellway House Embankment Way Ringwood BH24 1EU

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land North of Hook Lane Pagham PO21 3PD

This record has no verified map location.

Documents 80 of 80

DocumentPublishedAction
DecisionDecision8 Jun 2022View
DecisionDecision8 Jun 2022View
DecisionDecision8 Jun 2022View
DecisionDecision8 Jun 2022View
DecisionDecision8 Jun 2022View
DecisionDecision8 Jun 2022View
DecisionDecision8 Jun 2022View
DecisionDecision8 Jun 2022View
DecisionDecision8 Jun 2022View
DecisionDecision8 Jun 2022View
DecisionDecision8 Jun 2022View
DecisionDecision8 Jun 2022View
ApplicationApplication28 Mar 2022View
COVERING LETTERApplication25 Mar 2022View
STREET LIGHTING STRATEGY SHEET 2 OF 2 10461-1200-002 REVCPlans25 Mar 2022View
STREET LIGHTING STRATEGY SHEET 1 OF 2 10461-1200-001 REVCPlans25 Mar 2022View
SITE LAYOUT CONSTRUCTION MANAGEMENT PLAN CMP.01Plans25 Mar 2022View
NORTHERN ACCESS HOP OVER SECTIONS 167-RM-22Plans25 Mar 2022View
SOUTHERN ACCESS HOP OVER SECTIONS 167-RM-23Plans25 Mar 2022View
SOFTWORKS STRUCTURE 1 OF 7 167-RM-09 REVCPlans25 Mar 2022View
SOFTWORKS STRUCTURE 2 OF 7 167-RM-10 REVDPlans25 Mar 2022View
SOFTWORKS STRUCTURE SHEET 3 OF 7 167-RM-11 REVCPlans25 Mar 2022View
SOFTWORKS STRUTURE 4 OF 7 167-RM-12 REVDPlans25 Mar 2022View
SOFTWORKS STRUCTURE 5 OF 7 167-RM-13 REVCPlans25 Mar 2022View
SOFTWORKS STRUCTURE 6 OF 7 137-RM-14 REVCPlans25 Mar 2022View
SOFTWORKS STRUCTURE 7 OF 7 167-RM-15 REVDPlans25 Mar 2022View
SOFTWORKS SCHEDULE 167-RM-16 REVDPlans25 Mar 2022View
BOUNDARY HEDGE OFFSET PLAN 167-RM-21Plans25 Mar 2022View
DWELLING MATERIALS LAYOUT DML.01 REVDPlans25 Mar 2022View
INTERNAL SERVICES (FTTP) OPENREACH, HYPEROPTIC AND VIRGIN MEDIA COMS CUPBOARD STANDARD DETAIL 2/2 A/SD/S90/B/12Plans25 Mar 2022View
INTERNAL SERVICES (FTTP) OPENREACH, HYUPEROPTIC ADN VIRGIN MEDIA COMS CUPBOARD STANDARD DETAIL 1/2 A/SD/S90/B/11 REVAPlans25 Mar 2022View
STRUCTURAL OPENINGS DECORATIVE HEADS TYPICAL DETALS A/SD/S40/D/01 REVCPlans25 Mar 2022View
ROOF MASONRY-FACING BRICKWORK-PITCHED -COLD ROOF BOXED EAVES DETAIL A/SD/S80/A/01 REVCPlans25 Mar 2022View
STRUCTURAL OPENINGS-MASONRY-FACING BRICK, WINDOW HEAD AND CIL TYPICAL DETAILS A/50/S40/A/01 REVCPlans25 Mar 2022View
ELECTRIC VEHICLE CHARGING LAYOUT ECVL01 REVP2Plans25 Mar 2022View
RAISING MAIN LOG SECTION 10831-500-511 REVAPlans25 Mar 2022View
DRAINAGE LAYOUT SHEET 4 OF 4 10831-500-504 REVAPlans25 Mar 2022View
PROPOSED SWALE CROSSING 10831-500-510Plans25 Mar 2022View
ADOPTABLE DRAINAGE DETAILS SHEET 2 OF 7 10830-100-131 REVBPlans25 Mar 2022View
PRIVATE DRAINAGE SHEET 1 OF 11 18031-500-101 REVAPlans25 Mar 2022View
PRIVATE DRAINAGE SHEET 2 OF 11 18031-500-102 REVAPlans25 Mar 2022View
PRIVATE DRAINAGE SHEET 3 OF 11 10831-500-103 REVAPlans25 Mar 2022View
PRIVATE DRAINAGE 18031-500-104 REVAPlans25 Mar 2022View
PRIVATE DRAINAGE SHEET 5 OF 11 18031-500-105 REVAPlans25 Mar 2022View
PRIVATE DRAINAGE SHEET 6 OF 11 10831-500-106 REVAPlans25 Mar 2022View
PRIVATE DRAINAGE SHEET 7 OF 11 18031-500-107 REVAPlans25 Mar 2022View
PRIVATE DRAINAGE SHEET 8 OF 11 18031-500-108 REVAPlans25 Mar 2022View
PRIVATE DRAINAGE SHEET 9 OF 11 18031-500-109Plans25 Mar 2022View
PRIVATE DRAINAGE SHEET 10 OF 11 18031-500-110Plans25 Mar 2022View
PRIVATE DRAINAGE SHEET 11 OF 11 18031-500-111Plans25 Mar 2022View
DRAINAGE LAYOUT SHEET 1 OF 4 18031-500-501 REVAPlans25 Mar 2022View
DRAINAGE LAYOUT SHEET 2 OF 4 18031-500-502 REVAPlans25 Mar 2022View
DRAIANGE LAYOUT SHEET 3 OF 4 18031-500-503 REVAPlans25 Mar 2022View
TOPOGRAPHICAL SURVEY 2Plans25 Mar 2022View
TEST CERTIFICATESStatement25 Mar 2022View
EARTHWORKS SPECIFICATION PARCEL 2Statement25 Mar 2022View
BOREHOLE LOGSStatement25 Mar 2022View
PHASE 1 REVIEW & PHASE II GEO ENVIRONMENTAL ASSESSMENTStatement25 Mar 2022View
TEST CERTIFICATESStatement25 Mar 2022View
METHOD COMPACTION FOR EARTHWORS METHODS PLANT METHODSStatement25 Mar 2022View
EARTHWORKS SPECIFICATION PARCEL 1Statement25 Mar 2022View
CONSTRUCTION MANAGEMENT PLANStatement25 Mar 2022View
BROADBAND STRAGEGYStatement25 Mar 2022View
SITE WALKOVER HEDGEROWSStatement25 Mar 2022View
EV CHARGING POINT DETAILSStatement25 Mar 2022View
EV CHARGING POINT DETAILSStatement25 Mar 2022View
STATEMENT OF DETAILStatement25 Mar 2022View
Southern Water Consultation ResponseConsultation31 Aug 2022View
Drainage Engineer ResponseConsultation1 Jun 2022View
Southern WaterConsultation25 May 2022View
Pagham PC responseConsultation27 Apr 2022View
WSCC highways responseConsultation6 Apr 2022View
Environmental HealthConsultation4 Apr 2022View
CDC EcologyConsultation31 Mar 2022View
PLCOMACKRep Letters6 Jun 2022View
PLCOMACKRep Letters9 May 2022View
PLCOMACKRep Letters28 Apr 2022View
PLCOMACKRep Letters30 Mar 2022View
PLACKSystems Correspondence28 Mar 2022View
PLACKPPSystems Correspondence25 Mar 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

DOC Part Approved
Decision Decision Decision Decision Decision Decision Decision Decision Decision Decision Decision Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.