Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land North of Toddington Lane Littlehampton BN17 7PP
Last published check: 8 Oct 2026, 11:39. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceApproval of details reserved by condition imposed under ref LU/47/11/ relating to Condition Nos 10 surface water drainage scheme, 11 future access to & maintenance of any watercourse or culvert and 12 discharge of any flows to watercourse.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLand North of Toddington Lane Littlehampton BN17 7PP
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| cond 10Decision | 12 Dec 2018 | View |
| Cond 12Decision | 12 Dec 2018 | View |
| cond 11Decision | 12 Dec 2018 | View |
| Email removing condition 13 from application 16/01/19Application | 17 Jan 2019 | View |
| Application FormApplication | 28 Nov 2018 | View |
| Covering Letter - ApplicationApplication | 27 Nov 2018 | View |
| DRAINAGE GENERAL ARRANGEMENTS - DISCHARGE LOCATIONSPlans | 14 Dec 2018 | View |
| Drainage Strategy Part 2 Site Layout overview plan dwg. JN.670038-27.1C0002 BPlans | 27 Nov 2018 | View |
| Drainage Strategy Part 3 - Site Layout plan J1534-DRG-C01-004 B, Condition 10 - Subs Drainage Calculations, Results, Network Details, WSCC Surface Drainage Correspondences, Condition 13 Foul Layout planPlans | 27 Nov 2018 | View |
| Drainage Strategy Part 6 - Existing Surface Water Drainage Rates 8140927/121, Calculations existing rates,Plans | 27 Nov 2018 | View |
| Drainage Strategy Part 5 Greenhouse & Greenfield Drainage Survey plans & Greenfield Runoff CalculationPlans | 27 Nov 2018 | View |
| Drainage Strategy Part 6 - Greenhouse/Greenfield/ Water rates plans and CalculationsPlans | 27 Nov 2018 | View |
| Drainage Strategy Part 7 - Drainage Strategy Drawing A/PHLITTLE.2/DS P3, Filter Trench Construction Detail A/PHLITTLE-INT.2_MB/F/03 C1, Permeable SUB-Base Road Construction Details A/PHLITTLE-INT.2_MB/F/02 C1,Plans | 27 Nov 2018 | View |
| Drainage Strategy Part 8 - Drainage Layout (Sheet 2) 5691:02 B and Levels Plan (Sheet 1) 5691:03 EPlans | 27 Nov 2018 | View |
| Drainage Stategy Part 9 - Levels Plan (Sheet 2) 5691:04 Rev C, Area in Abeyance - Drainage Plan 5691:05 Rev A, Area in Abeyance - Levels plan dwg. 5691:06 A and Construction Details (Sheet 1) Hard Stranding Areas plan dwg. 5691:20 APlans | 27 Nov 2018 | View |
| Drainage Strategy Part 10 Construction Details (Sheet 2) Private Drainage (1) 5691;21, (Sheet 3) & (2) 5691:22, External Works (Sheet 1) 5691:40, (Sheet 2) 5691:41, General Arrangement Drawing (1 of 2) Plan A/PHLITTLE-INT.1/110-1 C2Plans | 27 Nov 2018 | View |
| Drainage Strategy Part 11 - General Arrangement drawing (2 of 2) A?PHLITTLE-INT.1/110-2 C2, Construction Treatments drawing (1 of 2) plan A/PHLITTLE-INT.1/111-1 C2, (2 of 2) A/PHLITTLE-INT.1111-2 C2, Drainage General Arrangement (1 of 2) A/PHLITTLE-INT.1/112-1 C3Plans | 27 Nov 2018 | View |
| Drainae Strategy Part 12 - Drainage General Arrangement (2 of 2) A/PHLITTLE-INT.1/112-2 C3,Plans | 27 Nov 2018 | View |
| Drainage Strategy Part 13 - Engineering Layout Sheet 2-3 plan LITL-502/2 D and 502/3 H and Road & Sewer Sections Sheet1/2/3 LITL 503/1 C, 503/2 C, 503/3 CPlans | 27 Nov 2018 | View |
| Drainage Strategy Part 14 Typcial Road Details plansPlans | 27 Nov 2018 | View |
| Drainage Strategy Part 15 - Phase 1 Prelimlinary Suds Strategy plan 8140927/104 P1 and Proposed S278 Highway Works Drainage and Ducting Drawing plan dwg. A/PHLITTLE.2/112 Rev UPlans | 27 Nov 2018 | View |
| Drainage Strategy Part 16 - Proposed S38 Highway Works Drainage and Ducting plans A/PHLITTLe.2/IDR-112 C1Plans | 27 Nov 2018 | View |
| Drainage Strategy Part 17 B3/B5 Access Road Construction plan dwg. CVB140927/611 P2Plans | 27 Nov 2018 | View |
| Drainage Strategy Part 18 - B3/B5 Access Highway Construction Details plan dwg. CV8140927/613Plans | 27 Nov 2018 | View |
| Drainage Strategy Part 1 (Discharge of conditions Report Conditions 10,11,12 & 13) March 2018 Issue 3Statement | 27 Nov 2018 | View |
| SOUTHERN WATERConsultation | 19 Dec 2018 | View |
| RE PLANNING CONSULTATIONConsultation | 17 Dec 2018 | View |
| ADC DRAINAGE CONSULTATIONConsultation | 13 Dec 2018 | View |
| ENGINEERS (DRAINAGE)Consultation | 7 Dec 2018 | View |
| Emails re drainage from Mayer BrownPlanning Correspondence | 3 Jan 2019 | View |
| Drainage Strategy from Mayer BrownPlanning Correspondence | 3 Jan 2019 | View |
| EMAILS - S.FOLY/R.CLARK RE: DRAINAGE ENGINEERS COMMENTSPlanning Correspondence | 14 Dec 2018 | View |
| DRAINAGE STRATEGYPlanning Correspondence | 14 Dec 2018 | View |
| DOCACKSystems Correspondence | 30 Nov 2018 | View |
| PMAC71PSystems Correspondence | 27 Nov 2018 | View |
| PMAC71PSystems Correspondence | 27 Nov 2018 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.