Council planning record

Removal of existing benches and shelters on seafront promenade. Replacement with single bench structure from east Beach cafe to rear of concessions adjacent to Harbour Park (sited along southern boundary with existing dwarf wall). Erection of two new public shelter structures

Littlehampton Promenade Littlehampton

ApproveConditionallyReference: LU/247/09/Arun District Council

Last published check: 24 Oct 2026, 10:44. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decided

    Published milestoneCouncil source
  4. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
ApproveConditionally
Application type
Not published
Received
8 Sept 2009
Validated
8 Sept 2009
Determination deadline
4 Nov 2009
Local authority
Arun District Council

Application overview

Removal of existing benches and shelters on seafront promenade. Replacement with single bench structure from east Beach cafe to rear of concessions adjacent to Harbour Park (sited along southern boundary with existing dwarf wall). Erection of two new public shelter structures

Proposal details

Reference
LU/247/09/
Parish
Littlehampton
Agent
Arun District Council Strategy & Economic Development Civic Centre Maltravers road Littlehampton BN17 5LF

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Littlehampton Promenade Littlehampton

This record has no verified map location.

Documents 40 of 40

DocumentPublishedAction
DecisionDecision5 Nov 2009View
Officers ReportOfficers Report5 Nov 2009View
ApplicationApplication9 Sept 2009View
SUBSTITUTION 23/10/09/ EXISTING SITE PLAN 113_00_000Plans29 Oct 2009View
SUBSTITUTE 23/10/09 SITE PLAN,EXISTING , FAR WEST PORTION 113_00_011Plans29 Oct 2009View
SUBSTITUTE 26/10/09/ BASIC MOVEMENT TYPES 113_01_110Plans26 Oct 2009View
SUBSTITUTE 23/10/09/ STRAIGHT LENGTHS 113_01_111Plans26 Oct 2009View
SUBSTITUTE 23/10/09/ OPENING TYPES 113_01_112Plans26 Oct 2009View
SUBSTITUTE 23/10/09 MOVEMENT AROUND LAMPPOSTS AND BINS 113_01_113Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ MOVEMENT INTO SETBACKS-PORTIONS WITH SEAT BACKS 113_01_114Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ START AND FINISH 113_01_115Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ EXISTING SHELTER, PLAN 113_01_001Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ EXISTING SHELTER, ELEVATIONS 113_03_001/2Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ PROPOSED SHELTER, PLAN 113_01_101Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ PROPSED SHELTER, SHORT SECTION 113_02_101Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ PROPOSED SHELTER, ELEVATIONS 113_03_101/2Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ PROPOSED SHELTER, 3D VIEW 113_04_102Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ VIEW OF THE BENCH 113_04_110Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ VIEW OF PROPOSED SHELTER 113_04_101Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ VIEW OF OVERALL SITE 113_04_100Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ PHOTOS OF BENCH PROTOTYPEPlans23 Oct 2009View
SUBSTITUTE 23/10/09/ SITE PLAN PROPOSED FAR WEST PORTION 113_00_111Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ SITE PLAN, EXISTING CENTRAL WEST PORTION 113_00_012Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ SITE PLAN, PROPOSED CENTRAL WEST PORTION 113_00_112Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ SITE PLAN, EXISTING CENTRAL EAST PORTION 113 00 013Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ SITE PLAN, EXISTING FAR EAST PORTION 113_00_014Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ SITE PLAN, PROPOSED CENTRAL EAST PORTION 113 00 113Plans23 Oct 2009View
SUBSTITUTE 23/10/09/ SITE PLAN, PROPOSED FAR EAST PORTION 113 00 114Plans23 Oct 2009View
SUPERCEDED PLANS 23/10/2009 113-00-111, 113-00-112, 113-11-113, 113-00-114Plans6 Oct 2009View
SUPERCEDED 23/10/09/ Bench, basic movement typesPlans8 Sept 2009View
SUPERCEDED 23/10/09/ Existing site planPlans8 Sept 2009View
SUPERCEDED 23/10/2009 Various plansPlans8 Sept 2009View
List of drawings submittedPlans8 Sept 2009View
SUBSTITUTE 23/10/09/ LIST OF DRAWINGS SUBMITTEDStatement23 Oct 2009View
Design and accessStatement8 Sept 2009View
ConsultationConsultation5 Oct 2009View
PARKS AND LANDSCAPESConsultation11 Sept 2009View
COSTAL ENGINEERSConsultation10 Sept 2009View
ENVIRONMENTAL AMENITIESConsultation9 Sept 2009View
ENVIRONMENTAL HEALTHConsultation9 Sept 2009View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

ApproveConditionally
Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.