Council planning record

Demolition of the existing Foreshore office & decommissioning of existing underground toilets. New purpose built unisex toilet block including urinals, baby changing facilities & accessible WC, plus a separate beach office with public information point & first aid facilities. All located on the existing seafront promenade.

Promenade Opposite Walton Avenue The Esplanade Bognor Regis PO21 1LX

ApproveConditionallyReference: BR/194/17/PLArun District Council

Last published check: 13 Oct 2026, 00:25. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decided

    Published milestoneCouncil source
  4. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
ApproveConditionally
Application type
Not published
Received
30 Jun 2017
Validated
30 Jun 2017
Determination deadline
19 Jan 2018
Local authority
Arun District Council

Application overview

Demolition of the existing Foreshore office & decommissioning of existing underground toilets. New purpose built unisex toilet block including urinals, baby changing facilities & accessible WC, plus a separate beach office with public information point & first aid facilities. All located on the existing seafront promenade.

Proposal details

Reference
BR/194/17/PL
Parish
Bognor Regis
Agent
Space & Place 4th Floor 91-93 Farringdon Road London EC1M 3LN

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Promenade Opposite Walton Avenue The Esplanade Bognor Regis PO21 1LX

This record has no verified map location.

Documents 138 of 138

DocumentPublishedAction
DecisionDecision18 Jan 2018View
Officers ReportOfficers Report19 Jan 2018View
Application formApplication7 Jul 2017View
Superseded 11.12.2017 - Proposed Roof plan dwg. 3496 (08) 104Plans12 Dec 2017View
Substitution 11.12.2017 - Existing site plan 100 APlans12 Dec 2017View
Substitution 11.12.2017 Location plan 101APlans12 Dec 2017View
Substitution 11.12.2017 - site plan 102 CPlans12 Dec 2017View
Substitution 11.12.2017 Proposed floor plan 103 DPlans12 Dec 2017View
Substitution 11.12.2017 Proposed roof planPlans12 Dec 2017View
Substitution 11.12.2017 Proposed combined elevations north and south 106 CPlans12 Dec 2017View
Substitution 11.12.2017 Proposed toilet elevations 107 DPlans12 Dec 2017View
Substitution 11.12.2017 Proposed beach office elevationsPlans12 Dec 2017View
Substitution 11.12.2017 - proposed sectionsPlans12 Dec 2017View
Substitution 11.12.2017 Building footprint comparision plan 110BPlans12 Dec 2017View
Superseded 11.12.2017 - Substitute 21/09/17 Proposed Floor plan dwg. 3496 (08) 103 Rev APlans21 Sept 2017View
Superseded 11.12.2017 - Supplementary 17/08/17 Block - Site plan dwg. 3496 (08) 102Plans31 Aug 2017View
Biodiversity ChecklistPlans4 Jul 2017View
LVR ChecklistPlans4 Jul 2017View
Existing Foreshore Station Build regs Details plans dwg. 9109.03 BR 03 Rev APlans4 Jul 2017View
Superseded 11.12.2017 - - Site plan dwg. 3496 (08) 102Plans4 Jul 2017View
Street Scene Photo - Visual 1Plans4 Jul 2017View
Street Scene Photo - Visual 2Plans4 Jul 2017View
Superseded 11.12.2017 - Existing Site plan dwg. 3496 (08) 100Plans4 Jul 2017View
Superseded 21/09/17 Proposed Floor plan dwg. 3496 (08) 103Plans4 Jul 2017View
Superseded 11.12.2017 - Proposed Elevations North-South plan dwg. 3496 (08) 106Plans4 Jul 2017View
Superseded 11.12.2017 - Proposed Toilet Elevations plans dwg. 3496 (08) 107Plans4 Jul 2017View
Superseded 11.12.2017 - Proposed Beach Office Elevations plans dwg. 3496 (08) 108Plans4 Jul 2017View
Superseded 11.12.2017 - Proposed Sections plans dwg. 3496 (08) 109Plans4 Jul 2017View
Existing Foreshore Station - Building regs Details (A) dwg. 9109.02 BR 01 Rev APlans4 Jul 2017View
Superseded 11.12.2017 - Location plan dwg. 3496 (08) 101Plans4 Jul 2017View
Substitution 11.12.2017 Design and access statementStatement12 Dec 2017View
Supplementary 11.12.2017 Planning statementStatement12 Dec 2017View
Superseded 11.12.2017 - Substitute 23/08/17 Design & Access Statement 3496/3.04/DA1 (June 2017)Statement31 Aug 2017View
Superseded 23/08/17 Design & Access Statement (June 2017) 3496/3.04/DA1Statement4 Jul 2017View
Southern WaterConsultation11 Jan 2018View
ConsultationConsultation20 Dec 2017View
Sussex PoliceConsultation20 Dec 2017View
Economic DevelopmentConsultation15 Dec 2017View
Greenspace. 4/9/17Consultation5 Sept 2017View
Drainage Engineer comments on Southern Water consultationConsultation23 Aug 2017View
Engineers (Coastal Protection)Consultation18 Aug 2017View
ConsultationConsultation17 Aug 2017View
Southern WaterConsultation16 Aug 2017View
SUSSEX POLICEConsultation14 Aug 2017View
Economic Development. 7/8/17Consultation7 Aug 2017View
Economic DevelopmentConsultation4 Aug 2017View
ENVIRONMENTAL HEALTHConsultation18 Jul 2017View
Rep LettersRep Letters15 Jan 2018View
Rep LettersRep Letters12 Jan 2018View
Rep LettersRep Letters12 Jan 2018View
Rep LettersRep Letters11 Jan 2018View
inetleteRep Letters9 Jan 2018View
inetleteRep Letters8 Jan 2018View
inetleteRep Letters5 Jan 2018View
inetleteRep Letters5 Jan 2018View
inetleteRep Letters4 Jan 2018View
inetleteRep Letters4 Jan 2018View
inetleteRep Letters14 Dec 2017View
Rep LettersRep Letters18 Aug 2017View
Rep LettersRep Letters18 Aug 2017View
inetleteRep Letters17 Aug 2017View
inetleteRep Letters17 Aug 2017View
inetleteRep Letters17 Aug 2017View
inetleteRep Letters17 Aug 2017View
inetleteRep Letters17 Aug 2017View
Rep LettersRep Letters17 Aug 2017View
Rep LettersRep Letters17 Aug 2017View
Rep LettersRep Letters17 Aug 2017View
Rep LettersRep Letters17 Aug 2017View
Rep LettersRep Letters17 Aug 2017View
inetleteRep Letters16 Aug 2017View
inetleteRep Letters16 Aug 2017View
Rep LettersRep Letters15 Aug 2017View
Rep LettersRep Letters15 Aug 2017View
Rep LettersRep Letters15 Aug 2017View
Rep LettersRep Letters15 Aug 2017View
Rep LettersRep Letters15 Aug 2017View
Rep LettersRep Letters15 Aug 2017View
inetleteRep Letters14 Aug 2017View
inetleteRep Letters14 Aug 2017View
inetleteRep Letters14 Aug 2017View
inetleteRep Letters11 Aug 2017View
5 x LettersRep Letters11 Aug 2017View
inetleteRep Letters10 Aug 2017View
Rep LettersRep Letters10 Aug 2017View
2 lettersRep Letters9 Aug 2017View
inetleteRep Letters8 Aug 2017View
inetleteRep Letters8 Aug 2017View
inetleteRep Letters7 Aug 2017View
inetleteRep Letters7 Aug 2017View
inetleteRep Letters4 Aug 2017View
Rep LettersRep Letters3 Aug 2017View
Rep LettersRep Letters3 Aug 2017View
inetleteRep Letters2 Aug 2017View
inetleteRep Letters2 Aug 2017View
inetleteRep Letters2 Aug 2017View
inetleteRep Letters2 Aug 2017View
inetleteRep Letters1 Aug 2017View
inetleteRep Letters1 Aug 2017View
Rep LettersRep Letters1 Aug 2017View
inetleteRep Letters31 Jul 2017View
inetleteRep Letters31 Jul 2017View
inetleteRep Letters26 Jul 2017View
inetleteRep Letters25 Jul 2017View
inetleteRep Letters25 Jul 2017View
inetleteRep Letters24 Jul 2017View
inetleteRep Letters24 Jul 2017View
inetleteRep Letters24 Jul 2017View
inetleteRep Letters24 Jul 2017View
inetleteRep Letters24 Jul 2017View
inetleteRep Letters24 Jul 2017View
inetleteRep Letters24 Jul 2017View
inetleteRep Letters24 Jul 2017View
inetleteRep Letters24 Jul 2017View
inetleteRep Letters21 Jul 2017View
inetleteRep Letters21 Jul 2017View
inetleteRep Letters21 Jul 2017View
inetleteRep Letters20 Jul 2017View
inetleteRep Letters20 Jul 2017View
inetleteRep Letters19 Jul 2017View
inetleteRep Letters19 Jul 2017View
Agreed Extension of TimePlanning Correspondence15 Dec 2017View
Emailed 19/09/17Planning Correspondence21 Sept 2017View
with member of publicPlanning Correspondence5 Sept 2017View
With member of publicPlanning Correspondence5 Sept 2017View
Emailed 23/08/17Planning Correspondence31 Aug 2017View
Agreed Extension of TimePlanning Correspondence31 Aug 2017View
EMAIL EXCHANGE REGARDING LETTER TO MPPlanning Correspondence29 Aug 2017View
LETTER FROM MPPlanning Correspondence29 Aug 2017View
LETTER TO MPPlanning Correspondence29 Aug 2017View
EOT2Systems Correspondence13 Dec 2017View
pmac52reaSystems Correspondence12 Dec 2017View
pmac52reaSystems Correspondence12 Dec 2017View
EOT1Systems Correspondence24 Aug 2017View
EOT1Systems Correspondence22 Aug 2017View
PACKSystems Correspondence13 Jul 2017View
PMAC52Systems Correspondence13 Jul 2017View
PMAC71PSystems Correspondence4 Jul 2017View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

ApproveConditionally
Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.