Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land at Dappers Lane Angmering
Last published check: 29 Sept 2026, 07:13. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceApproval of details reserved by condition imposed under ref A/76/20/PL relating to Condition Nos 17 - existing & proposed ground levels, 18 - surface water drainage, 19 - maintenance & management of surface water drainage, 21 - discharge flows to watercourses and 22 - foul drainage system
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLand at Dappers Lane Angmering
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| DecisionDecision | 7 Apr 2022 | View |
| DecisionDecision | 7 Apr 2022 | View |
| DecisionDecision | 7 Apr 2022 | View |
| DecisionDecision | 7 Apr 2022 | View |
| DecisionDecision | 7 Apr 2022 | View |
| Application FormApplication | 7 Sept 2021 | View |
| Cover LetterApplication | 6 Sept 2021 | View |
| Section 98 Agreement Plan Dwg No 20079-100S98 JPlans | 6 Sept 2021 | View |
| Private Drainage Layout Plan Sheet 1 of 3 Dwg No 20079/111 GPlans | 6 Sept 2021 | View |
| Highway & Drainage Longtitudinal Sections Dwg No 20079-201 BPlans | 6 Sept 2021 | View |
| Private Drainage Layout Plan Dwg No 20079/112GPlans | 6 Sept 2021 | View |
| Areas of Permavoid Collectors Dwg No 20079/172 APlans | 6 Sept 2021 | View |
| Section 98 Drainage Longitudnal Sections & MH Schedule Plan Dwg No 20079/206 DPlans | 6 Sept 2021 | View |
| Adoptable Storm & Foul Water Manhole Schedules Dwg No 20079-251 DPlans | 6 Sept 2021 | View |
| Private Driveway Surfaces and Kerbing Plan Dwg No 20079/142 APlans | 6 Sept 2021 | View |
| Drainage Construction Details Dwg No 20079/311 Rev APlans | 6 Sept 2021 | View |
| Footpath Construction Detail Dwg No 20079-327 APlans | 6 Sept 2021 | View |
| Attenuation Basin Construction Details Dwg No 20079/331 CPlans | 6 Sept 2021 | View |
| Pond Inlet & Outlet Headwall Details - 20079/330 DSubstitute Plan | 1 Apr 2022 | View |
| Attenuation Basin Cross Section - Sheet 1 of 3 - 20079/211 GSubstitute Plan | 1 Apr 2022 | View |
| Attenuation Basin Cross Sections - Sheet 2 of 3 - 20079/212 BSubstitute Plan | 1 Apr 2022 | View |
| Attenuation Basin Cross Section Plan - Sheet 3 of 3 - 20079/213Substitute Plan | 1 Apr 2022 | View |
| Combined Services Plan - Sheet 1 of 3 - 20079/181 ASubstitute Plan | 1 Apr 2022 | View |
| Combined Services Plan - Sheet 2 of 3 - 20079/182 ASubstitute Plan | 1 Apr 2022 | View |
| Combined Services Plan - Sheet 3 of 3 - 20079/183 ASubstitute Plan | 1 Apr 2022 | View |
| Watercourse Diversion & Cross Sections - Sheet 2 of 2 - 20079/221 BSubstitute Plan | 1 Apr 2022 | View |
| Section 38 Agreement Plan - 20079/100S38 LSubstitute Plan | 1 Apr 2022 | View |
| Private Drainage Layout Plan - Sheet 3 of 3 - 20079/113 GSubstitute Plan | 1 Apr 2022 | View |
| Master Drainage Layout Plan - Sheet 2 of 3 - 20079/117 DSubstitute Plan | 1 Apr 2022 | View |
| Contours & Chainages Plan - 20079/131 DSubstitute Plan | 1 Apr 2022 | View |
| Adoptable Kerbing & Finishes Plan - 20079/141 GSubstitute Plan | 1 Apr 2022 | View |
| Watercourse Diversion and Cross Sections Sheet 1 of 2 - 20079 - 220 CSubstitute Plan | 21 Feb 2022 | View |
| Highway and Drainage Longitudinal Sections Sheet 2 of 3 - 20079 / 202 CSubstitute Plan | 21 Feb 2022 | View |
| Highway and Drainage Longitudinal Sections Sheet 3 of 3 - 20079 / 203 CSubstitute Plan | 21 Feb 2022 | View |
| Section 104 Agreement Plan - 20079 / 100S104 HSubstitute Plan | 21 Feb 2022 | View |
| PRIVATE DRIVEWAY CONSTRUCTION DETAILS 20079-326ESubstitute Plan | 26 Oct 2021 | View |
| EXTERNAL LEVELS & FEATURES LAYOUT PLAN SHEET 1 OF 3 20079/101GSubstitute Plan | 25 Oct 2021 | View |
| EXTERNAL LEVELS & FEATURES LAYOUT PLAN SHEET 2 OF 3 20079/102GSubstitute Plan | 25 Oct 2021 | View |
| EXTERNAL LEVELS & FEATURES LAYOUT PLAN SHEET 3 OF 3 20079/103FSubstitute Plan | 25 Oct 2021 | View |
| MASTER DRAINAGE LAYOUT PLAN SHEET 1 OF 3 20079/116CSubstitute Plan | 25 Oct 2021 | View |
| MASTER DRAINAGE LAYOUT PLAN SHEET 3 OF 3 20079/118CSubstitute Plan | 25 Oct 2021 | View |
| FLOOD ROUTE EXCEEDANCE PLAN 20079/161DSubstitute Plan | 25 Oct 2021 | View |
| CELLULAR STOREAGE CONSTRUCTION DETAIL PLAN 20079/315CSubstitute Plan | 7 Oct 2021 | View |
| CELLULAR STORAGE CONSTRUCTION DETAIL PLAN 20079/316CSubstitute Plan | 7 Oct 2021 | View |
| HYDROBRAKE CONTROL CHAMBER CC38 20079/320DSubstitute Plan | 7 Oct 2021 | View |
| HYDROBRAKE CONTROL CHAMBER CC12 20079/321CSubstitute Plan | 7 Oct 2021 | View |
| HYDROBRAKE CONTROL CHAMBER CC28 20079/322BSubstitute Plan | 7 Oct 2021 | View |
| SURFACE WATER CATCHMENT AREA PLAN 20079/171BSubstitute Plan | 7 Oct 2021 | View |
| Ordinary Watercourse Land Drainage Approval LetterStatement | 1 Apr 2022 | View |
| Ordinary Watercourse Land Drainage ConsentStatement | 1 Apr 2022 | View |
| Foul Network 1Statement | 6 Sept 2021 | View |
| Drainage Maintenance Manual - March 2022Substitute Document | 1 Apr 2022 | View |
| Hydro-Brake Optimum - SHE-0112-7200-1920-7200_Hydraulic_Characteristics - 20079-CC28Substitute Document | 1 Apr 2022 | View |
| Hydro brake Optimum - SHE-0138-9200-1150-9200_Design_Drawing - 20078-CC38Substitute Document | 1 Apr 2022 | View |
| Hydro-Brake Optimum - SHE-0138-9200-1150-9200_Hydraulic_Characteristics - 20079-CC38Substitute Document | 1 Apr 2022 | View |
| Hydro-Brake Optimum - SHE-0084-4200-1950-4200_Design Drawing - 20079-CC12Substitute Document | 1 Apr 2022 | View |
| Hydro-Brake Optimum - SHE-0084-4200-1950-4200_Hydraulic Characteristics - 20079-CC12Substitute Document | 1 Apr 2022 | View |
| Hydro-Brake Optimum - SHE-0112-7200-1920-7200_Design_Drawing - 20079-CC28Substitute Document | 1 Apr 2022 | View |
| Storm Super Network 1 - 2yr, 30yr & 100yr + 40 - 2021.11.02Substitute Document | 1 Apr 2022 | View |
| 20079 - Floatation Calculations Rev A - 04/10/21Substitute Document | 7 Oct 2021 | View |
| email between OB AND ADCSubstitute Document | 7 Oct 2021 | View |
| Geotechnical & Hydrogeological Review PJ/RW/L001v1Additional Docs | 1 Apr 2022 | View |
| Technical Note: Civil Engineer Design Development Note (rev A)Additional Docs | 1 Apr 2022 | View |
| 20079 - Floatation Calculations rev B - CS03 ONLY - 15.10.2021Additional Docs | 1 Apr 2022 | View |
| Foul Network 1 - 2021.07.23Additional Docs | 1 Apr 2022 | View |
| ReFH2 Rural Runoff Peak Flows 1109-20079_ReFH2-Dev AreaAdditional Docs | 1 Apr 2022 | View |
| Western Ditch Improvements - Sheet 1 of 2 - 20079-223-AAdditional Docs | 1 Apr 2022 | View |
| Western Ditch Improvements - Sheet 2 of 2 - 20079-224-AAdditional Docs | 1 Apr 2022 | View |
| Ditch and Headwall Details - 20079 / 222 AAdditional Docs | 21 Feb 2022 | View |
| EXTENT OF DEVELOPMABLE AREA PLAN 20079/SK21.10.21Additional Docs | 25 Oct 2021 | View |
| TECHNICAL NOTE 20079/docs/civils/planning/discon/TN01Additional Docs | 25 Oct 2021 | View |
| COVER LETTERAdditional Docs | 25 Oct 2021 | View |
| SAFETY DOCUMENTATION ADDENDUM FOR INSTALLATION OF ATTENUATION PONDAdditional Docs | 25 Oct 2021 | View |
| DRAWING ISSUE SHEET 1 20079Additional Docs | 7 Oct 2021 | View |
| Response from ADC Drainage Engineers raising no objection to Condition 21Consultation | 7 Apr 2022 | View |
| Response from ADC Drainage Engineers raising no objection to Condition 17 and 18 and clarifying the issue re: Condition 22Consultation | 7 Apr 2022 | View |
| ADC Drainage engineer responseConsultation | 6 Apr 2022 | View |
| ADC Drainage Engineers response- Condition 21Consultation | 6 Apr 2022 | View |
| ADC Drainage Engineers response- Cond.22, ICOSAConsultation | 6 Apr 2022 | View |
| ADC Drainage EngineersConsultation | 1 Apr 2022 | View |
| ADC Drainage EngineersConsultation | 30 Mar 2022 | View |
| Further ICOSA water response 22/02/22Consultation | 23 Feb 2022 | View |
| ICOSA water responseConsultation | 22 Feb 2022 | View |
| Drainage engineer responseConsultation | 27 Oct 2021 | View |
| Engineers (Drainage)Consultation | 20 Oct 2021 | View |
| Southern WaterConsultation | 29 Sept 2021 | View |
| Engineers Comments Regarding Surface Water DrainageConsultation | 22 Sept 2021 | View |
| PLCOMACKRep Letters | 8 Mar 2022 | View |
| Rep LettersRep Letters | 7 Mar 2022 | View |
| Rep LettersRep Letters | 15 Nov 2021 | View |
| PLCOMACKRep Letters | 7 Oct 2021 | View |
| Extension of Time request until 08/04/22Planning Correspondence | 7 Apr 2022 | View |
| email re: sub plans 29.03.22Planning Correspondence | 1 Apr 2022 | View |
| email re: sub plans 29.03.22Planning Correspondence | 1 Apr 2022 | View |
| Extension of Time Agreement until 01/04/22Planning Correspondence | 29 Mar 2022 | View |
| Extension of time - 12/11/2021Planning Correspondence | 1 Nov 2021 | View |
| covering email with substitute drainage manual dated 25.10.21Planning Correspondence | 26 Oct 2021 | View |
| ATTENUATION BASIN CROSS SECTIONS SHEET 2 OF 2 20079-212ASystems Correspondence | 7 Oct 2021 | View |
| PLACKSystems Correspondence | 7 Sept 2021 | View |
| PLACKPPSystems Correspondence | 6 Sept 2021 | View |
| Watercourse Diversion and Cross Sections Sheet 2 of 2 - 20079 / 221 ASuperseded Document | 21 Feb 2022 | View |
| Drainage Maintenance Manual Oct 2021 rev.01Superseded Document | 26 Oct 2021 | View |
| Master Drainage Layout Plan - Sheet 2 of 3 - 20079/117CSuperseded Document | 25 Oct 2021 | View |
| MASTER DRAINAGE LAUOUT PLAN SHEET 3 OF 3 20079/118ASuperseded Document | 18 Oct 2021 | View |
| ATTENUATION BASIN CROSS SECTIONS SHEET 1 OF 2 20079-211DSuperseded Document | 7 Oct 2021 | View |
| PRIVATE DRIVEWAY CONSTRUCTION DETAILS 20079/326DSuperseded Document | 7 Oct 2021 | View |
| 20079 - Basin Floatation Calculations Rev A - 04.10.2021Superseded Document | 7 Oct 2021 | View |
| STORM NETWORK 51 04/10/21Superseded Document | 7 Oct 2021 | View |
| DRAINAGE MAINTENANCE MANUAL OCTOBER 2021Superseded Document | 7 Oct 2021 | View |
| EXTERNAL LEVELS & FEATURES LAYOUT PLAN SHEET 1 OF 3 20079/101ESuperseded Document | 7 Oct 2021 | View |
| EXTERNAL LEVELS AND FEATURES LAYOUT PLAN SHEET 2 OF 3 20079/102ESuperseded Document | 7 Oct 2021 | View |
| EXTERNAL LEVELS AND FEATURES LAYOUT PLAN SHEET 3OF 3 20079/103DSuperseded Document | 7 Oct 2021 | View |
| MASTER DRAINAGE LAYOUT PLAN SHEET 1 OF 3Superseded Document | 7 Oct 2021 | View |
| MASTER DRAIANGE LAYOUT PLAN SHEET 2 OF 3 20079/117ASuperseded Document | 7 Oct 2021 | View |
| FLOOD ROUTE EXCEEDANCE PLAN 20079/161CSuperseded Document | 7 Oct 2021 | View |
| HYDROBRAKE OPTIMUM FLOW CONTROL - SHE-0084-4200-1950-4200 - 20079-CC12Superseded Document | 7 Oct 2021 | View |
| HYDRO BRAKE FLOW CONTROL - SHE-0084-4200-1950-4200 - 20079-CC12Superseded Document | 7 Oct 2021 | View |
| HYDRO BRAKE OPTIMUM FLOW CONTROL - SHE-01120-7200-1920-7200 - 20079-CC28Superseded Document | 7 Oct 2021 | View |
| HYDRO BRAKE TECHNICAL FLOW CONTROL - SHE-0112-7200-1920-7200 - 20079-CC28Superseded Document | 7 Oct 2021 | View |
| HYDRO BRAKE OPTIMUM FLOW CONTROL - SHE-0138-9200-1150-9200 - 20079-CC38Superseded Document | 7 Oct 2021 | View |
| HYDRO BRAKE TECHNICAL - SHE-0138-9200-1150-9200 - 20079-CC38Superseded Document | 7 Oct 2021 | View |
| Ditch Works Land Drainage Consent (Email 5/8/21)Superseded Document | 7 Sept 2021 | View |
| Contours & Chainages Plan Dwg No 20079-131 BSuperseded Document | 6 Sept 2021 | View |
| Section 38 Agreement Plan Dwg No 20079/100S38 HSuperseded Document | 6 Sept 2021 | View |
| Private Drainage Layout Plan - Sheet 3 of 3 - 20079/113 FSuperseded Document | 6 Sept 2021 | View |
| Section 104 Agreement Plan Dwg No 20079-100S104 FSuperseded Document | 6 Sept 2021 | View |
| Highway & Drainage Longitudinal Sections Dwg No 20079-203 BSuperseded Document | 6 Sept 2021 | View |
| Combined Services Plan -Sheet 2 of 3 - 20079/182Superseded Document | 6 Sept 2021 | View |
| Combined Services Plan - Sheet 1 of 3 - 20079/181Superseded Document | 6 Sept 2021 | View |
| Watercourse Diversion & Cross Section Dwg No 20079-220Superseded Document | 6 Sept 2021 | View |
| Highway & Drainage Longitudinal Sections Sheet 2 of 3 Dwg No 20079-202 BSuperseded Document | 6 Sept 2021 | View |
| Combined Services Plan - Sheet 3 of 3 - 20079/183Superseded Document | 6 Sept 2021 | View |
| Planning Drainage Officers Comments & BGC Response 30/8/21Superseded Document | 6 Sept 2021 | View |
| Adoptable Kerbing & Finishes Plan Dwg No 20079/141 ESuperseded Document | 6 Sept 2021 | View |
| External Levels & Features Layout Plan Sheet 3 of 3 Dwg No 20079/103 CSuperseded Document | 6 Sept 2021 | View |
| External Levels & Features Layout Plan Sheet 1 of 3 Dwg No 20079/101 DSuperseded Document | 6 Sept 2021 | View |
| External Levels & Features Layout plan Sheet 2 of 3 Dwg No 20079/102 DSuperseded Document | 6 Sept 2021 | View |
| Attenuation Basin Cross Section Sheet 2 of 2 Dwg No 20079-212 ASuperseded Document | 6 Sept 2021 | View |
| Cellular Storage Construction Details Dwg No 20079/315 BSuperseded Document | 6 Sept 2021 | View |
| Master Drainage Layout Plan Sheet 2 of 3 Dwg No 20079/117Superseded Document | 6 Sept 2021 | View |
| Flood Route Exceedance Plan Dwg No 20079/161 BSuperseded Document | 6 Sept 2021 | View |
| Master Drainage Layout Plan Sheet 1 of 3 Dwg No 20079/116Superseded Document | 6 Sept 2021 | View |
| Master Drainage Layout Plan Sheet 3 of 3 Dwg No 20079/118Superseded Document | 6 Sept 2021 | View |
| Hydrobrake Control Chamber CC12 Dwg No 20079/321 BSuperseded Document | 6 Sept 2021 | View |
| Surface water Catchment Area Plan Dwg No 20079/171 ASuperseded Document | 6 Sept 2021 | View |
| Hydrobrake Control Chamber CC38 Dwg No 20079/320 CSuperseded Document | 6 Sept 2021 | View |
| Cellular Storage Construction Details Dwg No 20079/316 BSuperseded Document | 6 Sept 2021 | View |
| Attenuation Basin Cross Sections Sheet 1 of 2 Dwg No 20079-211 CSuperseded Document | 6 Sept 2021 | View |
| Private Driveway Construction Details Dwg No 20079-326 CSuperseded Document | 6 Sept 2021 | View |
| 20079 Floatation CalculationsSuperseded Document | 6 Sept 2021 | View |
| Pond Inlet & Outet Headwall Details HW01 & HW02 Dwg No 20079/330 BSuperseded Document | 6 Sept 2021 | View |
| Hydro Brake Control Chamber CC28 Dwg No 20079/322 ASuperseded Document | 6 Sept 2021 | View |
| Hydro Braje Optimum Design Layout Ref SHE-0082-4000-2000-4000Superseded Document | 6 Sept 2021 | View |
| Hydro Brake Optimum Hydraulic Characteristics Ref SHE-0082-4000-2000-4000Superseded Document | 6 Sept 2021 | View |
| Hydro Brake Optimum Hydraulic Characteristics Ref SHE-0109-6900-1920-6900Superseded Document | 6 Sept 2021 | View |
| Hydro Btake Optimum Design Layout Ref SHE-0109-6900-1920-6900Superseded Document | 6 Sept 2021 | View |
| Hydro Brake Optimum Hydraulic Characteristics Ref SHE-0138-9200-1150-9200Superseded Document | 6 Sept 2021 | View |
| Hydro Brake Optimum Design Layout Ref SHE-0138-9200-1150-9200Superseded Document | 6 Sept 2021 | View |
| Storm Network 51Superseded Document | 6 Sept 2021 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.