Council planning record

Approval of details reserved by condition imposed under ref A/76/20/PL relating to Condition Nos 17 - existing & proposed ground levels, 18 - surface water drainage, 19 - maintenance & management of surface water drainage, 21 - discharge flows to watercourses and 22 - foul drainage system

Land at Dappers Lane Angmering

DOC ApprovedReference: A/188/21/DOCArun District Council

Last published check: 29 Sept 2026, 07:13. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decided

    Published milestoneCouncil source
  4. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
DOC Approved
Application type
Not published
Received
3 Sept 2021
Validated
3 Sept 2021
Determination deadline
8 Apr 2022
Local authority
Arun District Council

Application overview

Approval of details reserved by condition imposed under ref A/76/20/PL relating to Condition Nos 17 - existing & proposed ground levels, 18 - surface water drainage, 19 - maintenance & management of surface water drainage, 21 - discharge flows to watercourses and 22 - foul drainage system

Proposal details

Reference
A/188/21/DOC
Parish
Angmering
Agent
Perimmon Homes Thames Valley Persimmon House Knoll Road Camberley GU15 3TQ

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land at Dappers Lane Angmering

This record has no verified map location.

Documents 159 of 159

DocumentPublishedAction
DecisionDecision7 Apr 2022View
DecisionDecision7 Apr 2022View
DecisionDecision7 Apr 2022View
DecisionDecision7 Apr 2022View
DecisionDecision7 Apr 2022View
Application FormApplication7 Sept 2021View
Cover LetterApplication6 Sept 2021View
Section 98 Agreement Plan Dwg No 20079-100S98 JPlans6 Sept 2021View
Private Drainage Layout Plan Sheet 1 of 3 Dwg No 20079/111 GPlans6 Sept 2021View
Highway & Drainage Longtitudinal Sections Dwg No 20079-201 BPlans6 Sept 2021View
Private Drainage Layout Plan Dwg No 20079/112GPlans6 Sept 2021View
Areas of Permavoid Collectors Dwg No 20079/172 APlans6 Sept 2021View
Section 98 Drainage Longitudnal Sections & MH Schedule Plan Dwg No 20079/206 DPlans6 Sept 2021View
Adoptable Storm & Foul Water Manhole Schedules Dwg No 20079-251 DPlans6 Sept 2021View
Private Driveway Surfaces and Kerbing Plan Dwg No 20079/142 APlans6 Sept 2021View
Drainage Construction Details Dwg No 20079/311 Rev APlans6 Sept 2021View
Footpath Construction Detail Dwg No 20079-327 APlans6 Sept 2021View
Attenuation Basin Construction Details Dwg No 20079/331 CPlans6 Sept 2021View
Pond Inlet & Outlet Headwall Details - 20079/330 DSubstitute Plan1 Apr 2022View
Attenuation Basin Cross Section - Sheet 1 of 3 - 20079/211 GSubstitute Plan1 Apr 2022View
Attenuation Basin Cross Sections - Sheet 2 of 3 - 20079/212 BSubstitute Plan1 Apr 2022View
Attenuation Basin Cross Section Plan - Sheet 3 of 3 - 20079/213Substitute Plan1 Apr 2022View
Combined Services Plan - Sheet 1 of 3 - 20079/181 ASubstitute Plan1 Apr 2022View
Combined Services Plan - Sheet 2 of 3 - 20079/182 ASubstitute Plan1 Apr 2022View
Combined Services Plan - Sheet 3 of 3 - 20079/183 ASubstitute Plan1 Apr 2022View
Watercourse Diversion & Cross Sections - Sheet 2 of 2 - 20079/221 BSubstitute Plan1 Apr 2022View
Section 38 Agreement Plan - 20079/100S38 LSubstitute Plan1 Apr 2022View
Private Drainage Layout Plan - Sheet 3 of 3 - 20079/113 GSubstitute Plan1 Apr 2022View
Master Drainage Layout Plan - Sheet 2 of 3 - 20079/117 DSubstitute Plan1 Apr 2022View
Contours & Chainages Plan - 20079/131 DSubstitute Plan1 Apr 2022View
Adoptable Kerbing & Finishes Plan - 20079/141 GSubstitute Plan1 Apr 2022View
Watercourse Diversion and Cross Sections Sheet 1 of 2 - 20079 - 220 CSubstitute Plan21 Feb 2022View
Highway and Drainage Longitudinal Sections Sheet 2 of 3 - 20079 / 202 CSubstitute Plan21 Feb 2022View
Highway and Drainage Longitudinal Sections Sheet 3 of 3 - 20079 / 203 CSubstitute Plan21 Feb 2022View
Section 104 Agreement Plan - 20079 / 100S104 HSubstitute Plan21 Feb 2022View
PRIVATE DRIVEWAY CONSTRUCTION DETAILS 20079-326ESubstitute Plan26 Oct 2021View
EXTERNAL LEVELS & FEATURES LAYOUT PLAN SHEET 1 OF 3 20079/101GSubstitute Plan25 Oct 2021View
EXTERNAL LEVELS & FEATURES LAYOUT PLAN SHEET 2 OF 3 20079/102GSubstitute Plan25 Oct 2021View
EXTERNAL LEVELS & FEATURES LAYOUT PLAN SHEET 3 OF 3 20079/103FSubstitute Plan25 Oct 2021View
MASTER DRAINAGE LAYOUT PLAN SHEET 1 OF 3 20079/116CSubstitute Plan25 Oct 2021View
MASTER DRAINAGE LAYOUT PLAN SHEET 3 OF 3 20079/118CSubstitute Plan25 Oct 2021View
FLOOD ROUTE EXCEEDANCE PLAN 20079/161DSubstitute Plan25 Oct 2021View
CELLULAR STOREAGE CONSTRUCTION DETAIL PLAN 20079/315CSubstitute Plan7 Oct 2021View
CELLULAR STORAGE CONSTRUCTION DETAIL PLAN 20079/316CSubstitute Plan7 Oct 2021View
HYDROBRAKE CONTROL CHAMBER CC38 20079/320DSubstitute Plan7 Oct 2021View
HYDROBRAKE CONTROL CHAMBER CC12 20079/321CSubstitute Plan7 Oct 2021View
HYDROBRAKE CONTROL CHAMBER CC28 20079/322BSubstitute Plan7 Oct 2021View
SURFACE WATER CATCHMENT AREA PLAN 20079/171BSubstitute Plan7 Oct 2021View
Ordinary Watercourse Land Drainage Approval LetterStatement1 Apr 2022View
Ordinary Watercourse Land Drainage ConsentStatement1 Apr 2022View
Foul Network 1Statement6 Sept 2021View
Drainage Maintenance Manual - March 2022Substitute Document1 Apr 2022View
Hydro-Brake Optimum - SHE-0112-7200-1920-7200_Hydraulic_Characteristics - 20079-CC28Substitute Document1 Apr 2022View
Hydro brake Optimum - SHE-0138-9200-1150-9200_Design_Drawing - 20078-CC38Substitute Document1 Apr 2022View
Hydro-Brake Optimum - SHE-0138-9200-1150-9200_Hydraulic_Characteristics - 20079-CC38Substitute Document1 Apr 2022View
Hydro-Brake Optimum - SHE-0084-4200-1950-4200_Design Drawing - 20079-CC12Substitute Document1 Apr 2022View
Hydro-Brake Optimum - SHE-0084-4200-1950-4200_Hydraulic Characteristics - 20079-CC12Substitute Document1 Apr 2022View
Hydro-Brake Optimum - SHE-0112-7200-1920-7200_Design_Drawing - 20079-CC28Substitute Document1 Apr 2022View
Storm Super Network 1 - 2yr, 30yr & 100yr + 40 - 2021.11.02Substitute Document1 Apr 2022View
20079 - Floatation Calculations Rev A - 04/10/21Substitute Document7 Oct 2021View
email between OB AND ADCSubstitute Document7 Oct 2021View
Geotechnical & Hydrogeological Review PJ/RW/L001v1Additional Docs1 Apr 2022View
Technical Note: Civil Engineer Design Development Note (rev A)Additional Docs1 Apr 2022View
20079 - Floatation Calculations rev B - CS03 ONLY - 15.10.2021Additional Docs1 Apr 2022View
Foul Network 1 - 2021.07.23Additional Docs1 Apr 2022View
ReFH2 Rural Runoff Peak Flows 1109-20079_ReFH2-Dev AreaAdditional Docs1 Apr 2022View
Western Ditch Improvements - Sheet 1 of 2 - 20079-223-AAdditional Docs1 Apr 2022View
Western Ditch Improvements - Sheet 2 of 2 - 20079-224-AAdditional Docs1 Apr 2022View
Ditch and Headwall Details - 20079 / 222 AAdditional Docs21 Feb 2022View
EXTENT OF DEVELOPMABLE AREA PLAN 20079/SK21.10.21Additional Docs25 Oct 2021View
TECHNICAL NOTE 20079/docs/civils/planning/discon/TN01Additional Docs25 Oct 2021View
COVER LETTERAdditional Docs25 Oct 2021View
SAFETY DOCUMENTATION ADDENDUM FOR INSTALLATION OF ATTENUATION PONDAdditional Docs25 Oct 2021View
DRAWING ISSUE SHEET 1 20079Additional Docs7 Oct 2021View
Response from ADC Drainage Engineers raising no objection to Condition 21Consultation7 Apr 2022View
Response from ADC Drainage Engineers raising no objection to Condition 17 and 18 and clarifying the issue re: Condition 22Consultation7 Apr 2022View
ADC Drainage engineer responseConsultation6 Apr 2022View
ADC Drainage Engineers response- Condition 21Consultation6 Apr 2022View
ADC Drainage Engineers response- Cond.22, ICOSAConsultation6 Apr 2022View
ADC Drainage EngineersConsultation1 Apr 2022View
ADC Drainage EngineersConsultation30 Mar 2022View
Further ICOSA water response 22/02/22Consultation23 Feb 2022View
ICOSA water responseConsultation22 Feb 2022View
Drainage engineer responseConsultation27 Oct 2021View
Engineers (Drainage)Consultation20 Oct 2021View
Southern WaterConsultation29 Sept 2021View
Engineers Comments Regarding Surface Water DrainageConsultation22 Sept 2021View
PLCOMACKRep Letters8 Mar 2022View
Rep LettersRep Letters7 Mar 2022View
Rep LettersRep Letters15 Nov 2021View
PLCOMACKRep Letters7 Oct 2021View
Extension of Time request until 08/04/22Planning Correspondence7 Apr 2022View
email re: sub plans 29.03.22Planning Correspondence1 Apr 2022View
email re: sub plans 29.03.22Planning Correspondence1 Apr 2022View
Extension of Time Agreement until 01/04/22Planning Correspondence29 Mar 2022View
Extension of time - 12/11/2021Planning Correspondence1 Nov 2021View
covering email with substitute drainage manual dated 25.10.21Planning Correspondence26 Oct 2021View
ATTENUATION BASIN CROSS SECTIONS SHEET 2 OF 2 20079-212ASystems Correspondence7 Oct 2021View
PLACKSystems Correspondence7 Sept 2021View
PLACKPPSystems Correspondence6 Sept 2021View
Watercourse Diversion and Cross Sections Sheet 2 of 2 - 20079 / 221 ASuperseded Document21 Feb 2022View
Drainage Maintenance Manual Oct 2021 rev.01Superseded Document26 Oct 2021View
Master Drainage Layout Plan - Sheet 2 of 3 - 20079/117CSuperseded Document25 Oct 2021View
MASTER DRAINAGE LAUOUT PLAN SHEET 3 OF 3 20079/118ASuperseded Document18 Oct 2021View
ATTENUATION BASIN CROSS SECTIONS SHEET 1 OF 2 20079-211DSuperseded Document7 Oct 2021View
PRIVATE DRIVEWAY CONSTRUCTION DETAILS 20079/326DSuperseded Document7 Oct 2021View
20079 - Basin Floatation Calculations Rev A - 04.10.2021Superseded Document7 Oct 2021View
STORM NETWORK 51 04/10/21Superseded Document7 Oct 2021View
DRAINAGE MAINTENANCE MANUAL OCTOBER 2021Superseded Document7 Oct 2021View
EXTERNAL LEVELS & FEATURES LAYOUT PLAN SHEET 1 OF 3 20079/101ESuperseded Document7 Oct 2021View
EXTERNAL LEVELS AND FEATURES LAYOUT PLAN SHEET 2 OF 3 20079/102ESuperseded Document7 Oct 2021View
EXTERNAL LEVELS AND FEATURES LAYOUT PLAN SHEET 3OF 3 20079/103DSuperseded Document7 Oct 2021View
MASTER DRAINAGE LAYOUT PLAN SHEET 1 OF 3Superseded Document7 Oct 2021View
MASTER DRAIANGE LAYOUT PLAN SHEET 2 OF 3 20079/117ASuperseded Document7 Oct 2021View
FLOOD ROUTE EXCEEDANCE PLAN 20079/161CSuperseded Document7 Oct 2021View
HYDROBRAKE OPTIMUM FLOW CONTROL - SHE-0084-4200-1950-4200 - 20079-CC12Superseded Document7 Oct 2021View
HYDRO BRAKE FLOW CONTROL - SHE-0084-4200-1950-4200 - 20079-CC12Superseded Document7 Oct 2021View
HYDRO BRAKE OPTIMUM FLOW CONTROL - SHE-01120-7200-1920-7200 - 20079-CC28Superseded Document7 Oct 2021View
HYDRO BRAKE TECHNICAL FLOW CONTROL - SHE-0112-7200-1920-7200 - 20079-CC28Superseded Document7 Oct 2021View
HYDRO BRAKE OPTIMUM FLOW CONTROL - SHE-0138-9200-1150-9200 - 20079-CC38Superseded Document7 Oct 2021View
HYDRO BRAKE TECHNICAL - SHE-0138-9200-1150-9200 - 20079-CC38Superseded Document7 Oct 2021View
Ditch Works Land Drainage Consent (Email 5/8/21)Superseded Document7 Sept 2021View
Contours & Chainages Plan Dwg No 20079-131 BSuperseded Document6 Sept 2021View
Section 38 Agreement Plan Dwg No 20079/100S38 HSuperseded Document6 Sept 2021View
Private Drainage Layout Plan - Sheet 3 of 3 - 20079/113 FSuperseded Document6 Sept 2021View
Section 104 Agreement Plan Dwg No 20079-100S104 FSuperseded Document6 Sept 2021View
Highway & Drainage Longitudinal Sections Dwg No 20079-203 BSuperseded Document6 Sept 2021View
Combined Services Plan -Sheet 2 of 3 - 20079/182Superseded Document6 Sept 2021View
Combined Services Plan - Sheet 1 of 3 - 20079/181Superseded Document6 Sept 2021View
Watercourse Diversion & Cross Section Dwg No 20079-220Superseded Document6 Sept 2021View
Highway & Drainage Longitudinal Sections Sheet 2 of 3 Dwg No 20079-202 BSuperseded Document6 Sept 2021View
Combined Services Plan - Sheet 3 of 3 - 20079/183Superseded Document6 Sept 2021View
Planning Drainage Officers Comments & BGC Response 30/8/21Superseded Document6 Sept 2021View
Adoptable Kerbing & Finishes Plan Dwg No 20079/141 ESuperseded Document6 Sept 2021View
External Levels & Features Layout Plan Sheet 3 of 3 Dwg No 20079/103 CSuperseded Document6 Sept 2021View
External Levels & Features Layout Plan Sheet 1 of 3 Dwg No 20079/101 DSuperseded Document6 Sept 2021View
External Levels & Features Layout plan Sheet 2 of 3 Dwg No 20079/102 DSuperseded Document6 Sept 2021View
Attenuation Basin Cross Section Sheet 2 of 2 Dwg No 20079-212 ASuperseded Document6 Sept 2021View
Cellular Storage Construction Details Dwg No 20079/315 BSuperseded Document6 Sept 2021View
Master Drainage Layout Plan Sheet 2 of 3 Dwg No 20079/117Superseded Document6 Sept 2021View
Flood Route Exceedance Plan Dwg No 20079/161 BSuperseded Document6 Sept 2021View
Master Drainage Layout Plan Sheet 1 of 3 Dwg No 20079/116Superseded Document6 Sept 2021View
Master Drainage Layout Plan Sheet 3 of 3 Dwg No 20079/118Superseded Document6 Sept 2021View
Hydrobrake Control Chamber CC12 Dwg No 20079/321 BSuperseded Document6 Sept 2021View
Surface water Catchment Area Plan Dwg No 20079/171 ASuperseded Document6 Sept 2021View
Hydrobrake Control Chamber CC38 Dwg No 20079/320 CSuperseded Document6 Sept 2021View
Cellular Storage Construction Details Dwg No 20079/316 BSuperseded Document6 Sept 2021View
Attenuation Basin Cross Sections Sheet 1 of 2 Dwg No 20079-211 CSuperseded Document6 Sept 2021View
Private Driveway Construction Details Dwg No 20079-326 CSuperseded Document6 Sept 2021View
20079 Floatation CalculationsSuperseded Document6 Sept 2021View
Pond Inlet & Outet Headwall Details HW01 & HW02 Dwg No 20079/330 BSuperseded Document6 Sept 2021View
Hydro Brake Control Chamber CC28 Dwg No 20079/322 ASuperseded Document6 Sept 2021View
Hydro Braje Optimum Design Layout Ref SHE-0082-4000-2000-4000Superseded Document6 Sept 2021View
Hydro Brake Optimum Hydraulic Characteristics Ref SHE-0082-4000-2000-4000Superseded Document6 Sept 2021View
Hydro Brake Optimum Hydraulic Characteristics Ref SHE-0109-6900-1920-6900Superseded Document6 Sept 2021View
Hydro Btake Optimum Design Layout Ref SHE-0109-6900-1920-6900Superseded Document6 Sept 2021View
Hydro Brake Optimum Hydraulic Characteristics Ref SHE-0138-9200-1150-9200Superseded Document6 Sept 2021View
Hydro Brake Optimum Design Layout Ref SHE-0138-9200-1150-9200Superseded Document6 Sept 2021View
Storm Network 51Superseded Document6 Sept 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

DOC Approved
Decision Decision Decision Decision Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.